Construction Documentation

by Abhinavbwj in Abhinavbwj/Skills-Architects

Comprehensive construction documentation skill covering architectural drawing sets, sheet organization and numbering, drawing standards (line weights, text, hatching, dimensions), BIM Level of…

MITAuto-check passed

Install Construction Documentation

skills CLI
$ npx skills add Abhinavbwj/Skills-Architects --skill construction-documentation -a claude-code

Project install by default; add -g for ~/.claude/skills/.

GitHub CLI
$ gh skill install Abhinavbwj/Skills-Architects construction-documentation --agent claude-code

Project scope by default; add --scope user for a personal install. Needs GitHub CLI 2.90.0 or later (public preview).

Manual copy
$ git clone --depth 1 https://github.com/Abhinavbwj/Skills-Architects.git skills-src && mkdir -p .claude/skills && cp -r skills-src/skills/construction-documentation .claude/skills/construction-documentation && rm -rf skills-src

Use ~/.claude/skills/ instead of .claude/skills for a personal install. The folder must contain SKILL.md.

Claude Code skills documentation · loads skills from .claude/skills/

Facts

Skill name
construction-documentation
GitHub stars
295
Token cost
~8.1k tokens
SKILL.md length
3,422 words
Files
5 (incl. references)
Skills in repo
17
Repo updated
First seen
Licence
MIT

At a glance

Comprehensive construction documentation skill covering architectural drawing sets, sheet organization and numbering, drawing standards (line weights, text, hatching, dimensions), BIM Level of…

  • Works in 6 steps: Drawing Set Organization → Drawing Standards → BIM Level of Development (LOD)… → …
  • SKILL.md covers 1. Drawing Set Organization, 2. Drawing Standards, 3. BIM Level of Development… and 4. Specification Writing, plus 2 more sections
  • Instructions only: no scripts, shell commands, URLs or credentials in SKILL.md

What it does

Construction Documentation is an agent skill from Abhinavbwj/Skills-Architects. Comprehensive construction documentation skill covering architectural drawing sets, sheet organization and numbering, drawing standards (line weights, text, hatching, dimensions), BIM Level of Development (LOD) requirements, specification writing using CSI MasterFormat, schedule production (door, window, finish, fixture), and construction administration workflows including RFI processing, submittal review, change orders, site observations, punch lists, and warranty period management.

Its SKILL.md is about 8.1k tokens, which your agent loads only when the skill is triggered. The skill folder holds 6 other files, including reference files (for example `references/drawing-standards.md`, `references/specification-systems.md` and `templates/drawing-checklist.md`).

The licence is MIT.

Example prompts

  • “/construction-documentation”

Workflow steps

6 steps, taken from the step headings in SKILL.md.

  1. Drawing Set Organization
  2. Drawing Standards
  3. BIM Level of Development (LOD) Requirements
  4. Specification Writing
  5. Schedule Production
  6. Construction Administration

What it can do on your machine

Read from SKILL.md and the folder at commit 30a0845. It shows what the files ask for, not the result of running them.

  • Tool permissions

    Pre-approves nothing: there is no allowed-tools line, so your agent's usual permission prompts apply.

    From allowed-tools in the SKILL.md frontmatter.

  • Runs code

    No scripts in the folder and no shell commands in SKILL.md.

    From the folder's file list and the shell code blocks in SKILL.md.

  • Network

    No URLs in SKILL.md.

    From URLs in SKILL.md, links to its own repository left out.

  • Credentials

    Names no API keys, tokens, secrets or passwords.

    From names ending in _API_KEY, _TOKEN, _SECRET, _KEY or _PASSWORD in SKILL.md.

Context cost

Construction Documentation loads about 8.1k tokens when it runs, and up to ~16k if it reads all its reference files. Until then it costs about 129 tokens; SKILL.md has 3,422 words of instructions outside code blocks.

Always · name and description, kept in context so the agent knows when to use it
~129
When it runs · the whole SKILL.md, loaded when a task matches
~8.1k
With references · SKILL.md plus every file in references/, read only if the agent opens them
~16k

Estimates: characters ÷ 4, the usual rule of thumb; real counts depend on the model's tokenizer. Scripts and assets cost tokens only if the agent reads them.

Safety

Auto-check passed

The automated check found no risky patterns in SKILL.md.

Automated static check — not a guarantee. Review scripts before installing. It scans the text of SKILL.md for risky patterns (piping downloads into a shell, reading credential files, hidden Unicode, destructive commands); files beside SKILL.md are not scanned.

SKILL.md

The full file from Abhinavbwj/Skills-Architects at commit 30a0845, republished under its MIT licence (© Abhinavbwj). 3,422 words, ~8,121 tokens.

Download SKILL.mdSave it as .claude/skills/construction-documentation/SKILL.md (or your agent's skills folder). This skill also uses 4 other files; get the full folder from GitHub.
name
construction-documentation
description
Comprehensive construction documentation skill covering architectural drawing sets, sheet organization and numbering, drawing standards (line weights, text, hatching, dimensions), BIM Level of Development (LOD) requirements, specification writing using CSI MasterFormat, schedule production (door, window, finish, fixture), and construction administration workflows including RFI processing, submittal review, change orders, site observations, punch lists, and warranty period management.

Construction Documentation

Construction documentation translates design intent into legally binding, buildable instructions. This skill covers every aspect of producing a complete, coordinated, and code-compliant set of construction documents -- from drawing organization and graphic standards through specifications, schedules, and the architect's role during the construction phase.


1. Drawing Set Organization

1.1 Standard Architectural Drawing Sequence

A complete architectural drawing set follows a consistent order that allows contractors, consultants, and reviewers to navigate the documents efficiently. The standard sequence is:

  1. Cover Sheet -- project name, address, owner, architect, consultants, project number, issue date, building code summary, occupancy classification, construction type, area tabulation, vicinity map.
  2. Drawing List -- complete index of every sheet in the set, organized by discipline with sheet number, title, and revision status.
  3. General Notes -- project-wide notes, abbreviations, symbols legend, material keynote legend, accessibility standards referenced, applicable codes and editions.
  4. Site Plan -- property boundaries, setbacks, easements, building footprint, grading, paving, landscaping, utilities, site lighting, stormwater management, accessibility routes.
  5. Floor Plans -- every level including basement, ground, upper floors, mezzanines, and mechanical penthouse. Show walls, doors, windows, stairs, elevators, room names, room numbers, dimensions, column grid, section cut indicators, elevation markers, detail callouts.
  6. Reflected Ceiling Plans (RCP) -- ceiling materials, heights, grid layout, light fixtures, diffusers, sprinkler heads, access panels, ceiling soffits, bulkheads.
  7. Roof Plan -- roof slopes, drainage, overflow drains, mechanical equipment, roof access, parapet heights, expansion joints, roof penetrations, fall protection anchorage.
  8. Exterior Elevations -- all four sides minimum, material indications, floor lines, ceiling lines, grade line, roof ridge/eave lines, window tags, door tags, material keynotes, vertical dimensions.
  9. Building Sections -- longitudinal and transverse sections through the entire building. Show structural system, floor-to-floor heights, foundation, roof structure, wall assemblies at cut, vertical circulation, key dimensions.
  10. Wall Sections -- detailed vertical cuts through typical wall assemblies from foundation to roof. Show every layer, flashing, waterproofing, insulation, vapor barriers, structural connections, window head/sill/jamb conditions.
  11. Enlarged Plans -- stair plans, elevator plans, toilet rooms, kitchens, lobbies, and other complex spaces at 1:50 or 1:20 scale.
  12. Interior Elevations -- wall-by-wall interior views of significant rooms: toilets, kitchens, reception areas, conference rooms. Show casework, tile layouts, fixture locations, outlet heights.
  13. Stair and Elevator Details -- stair sections, handrail details, guardrail connections, nosing profiles, elevator pit, shaft dimensions, machine room layout, cab interior elevations.
  14. Door Schedule and Details -- door types, frame details, hardware sets, threshold details, ADA clearance diagrams.
  15. Window Schedule and Details -- window types, mullion details, sill/head/jamb sections, hardware, performance specifications.
  16. Finish Schedule -- room-by-room listing of floor, base, wall, and ceiling finishes with finish codes cross-referenced to specifications.
  17. Detail Sheets -- miscellaneous construction details not covered elsewhere: expansion joints, control joints, flashing, waterproofing, miscellaneous metal, signage mounting.
1.2 Sheet Numbering Conventions

Sheet numbers use a discipline prefix followed by a category digit and sequential number. The standard architectural prefix is "A":

Sheet SeriesCategoryExamples
A0.01General (cover, notes)A0.01, A0.02, A0.03
A1.01Floor PlansA1.01, A1.02, A1.03
A1.50Reflected Ceiling PlansA1.50, A1.51
A1.70Roof PlansA1.70, A1.71
A2.01Exterior ElevationsA2.01, A2.02
A2.50Interior ElevationsA2.50, A2.51, A2.52
A3.01Building SectionsA3.01, A3.02
A3.50Wall SectionsA3.50, A3.51
A4.01Enlarged PlansA4.01, A4.02
A5.01DetailsA5.01, A5.02, A5.03
A6.01SchedulesA6.01, A6.02
A7.01Interior DesignA7.01, A7.02

Other discipline prefixes:

  • G -- General (project-wide cover sheets, code analysis)
  • C -- Civil
  • L -- Landscape
  • S -- Structural
  • M -- Mechanical
  • P -- Plumbing
  • FP -- Fire Protection
  • E -- Electrical
1.3 Drawing Scale Conventions by Sheet Type
Sheet TypeCommon Metric ScaleImperial Equivalent
Site Plan1:200 or 1:5001" = 20' or 1" = 40'
Floor Plans1:100 or 1:501/8" = 1' or 1/4" = 1'
Reflected Ceiling Plan1:100 or 1:501/8" = 1' or 1/4" = 1'
Roof Plan1:100 or 1:2001/8" = 1' or 1/16" = 1'
Exterior Elevations1:100 or 1:501/8" = 1' or 1/4" = 1'
Building Sections1:100 or 1:501/8" = 1' or 1/4" = 1'
Wall Sections1:20 or 1:103/4" = 1' or 1-1/2" = 1'
Enlarged Plans1:50 or 1:201/4" = 1' or 1/2" = 1'
Interior Elevations1:50 or 1:201/4" = 1' or 1/2" = 1'
Construction Details1:10 or 1:51" = 1' or 3" = 1'
Stair/Elevator Details1:20 or 1:101/2" = 1' or 1" = 1'

2. Drawing Standards

2.1 Line Weights

Consistent line weights ensure drawings are legible at all reproduction sizes. The standard hierarchy:

Line Weight (mm)Purpose
0.13Grid lines, construction lines, hatch patterns
0.18Hatching, fine detail, material patterns
0.25Minor object lines, furniture, equipment
0.35Major object lines, walls beyond cut plane
0.50Cut lines (walls, floors, roofs in section)
0.70Section cut lines, profile lines

In practice, line weights map to pen colors in CAD systems:

  • Color 1 (Red) = 0.13mm
  • Color 2 (Yellow) = 0.18mm
  • Color 3 (Green) = 0.25mm
  • Color 4 (Cyan) = 0.35mm
  • Color 5 (Blue) = 0.50mm
  • Color 6 (Magenta) = 0.70mm
2.2 Text Heights

Text height standards ensure readability when plotted:

Text Height (mm)Usage
1.8Dimensions, minor annotations
2.0General notes, specifications on drawings
2.5Room names, door/window tags
3.5Drawing titles, subtitles
5.0Sheet titles
7.0Cover sheet project name

Font standards:

  • Primary: Arial, Helvetica, or equivalent sans-serif
  • CAD standard: SIMPLEX or ROMANS (SHX fonts)
  • Avoid decorative fonts; maintain consistent font family across all sheets
2.3 Hatching Patterns

Standard material hatching in section and plan:

MaterialHatch Pattern Description
ConcreteDot stipple or triangular aggregate pattern
Masonry (brick)Diagonal crosshatch at 45 degrees
Masonry (CMU)Diagonal lines with dots at block cores
Insulation (rigid)Hatched at 45 degrees, tight spacing
Insulation (batt)Wavy lines or scalloped pattern
Earth/soilRandom dot pattern with short dashes
Timber (sawn)End grain circles in section, parallel lines along
SteelDiagonal lines at 45 degrees, tight spacing
GlassSingle solid fill or single line
Membrane/sheetHeavy single line
PlywoodAlternating parallel lines at varying angles
Gypsum boardSmall "x" pattern or light stipple
2.4 Annotation Standards
  • Keynotes: Numeric references linked to keynote legend; preferred over text notes for consistency. Use either sheet keynotes or reference keynotes (linked to specifications).
  • Room Tags: Room number (bold, upper), room name (below), floor finish code, ceiling height.
  • Door Tags: Circle with door number referencing door schedule.
  • Window Tags: Diamond or hexagon with window type referencing schedule.
  • Section Markers: Circle with section number (upper) and sheet number (lower), tail pointing in direction of view.
  • Elevation Markers: Circle with arrow indicating viewing direction, reference number and sheet number.
  • Detail Callouts: Circle or oval with detail number (upper) and sheet number (lower).
  • Column Grid: Circles at grid intersections -- numbers for one axis (1, 2, 3...) and letters for the other (A, B, C...).
2.5 Dimension Styles

Three primary dimensioning methods:

  1. Running Dimensions (baseline): All dimensions taken from a single reference point. Preferred for structural grids and overall building dimensions. Reduces cumulative error.

  2. Chain Dimensions (continuous): Sequential dimensions from point to point. Used for wall-to-wall dimensions, opening locations. Three dimension strings typical: overall, grid-to-grid, wall-to-wall.

  3. Ordinate Dimensions: X-Y coordinates from a datum point. Used in site plans and complex curved geometry.

General rules:

  • Dimension to face of structure, not finish, unless specifically noting finish dimensions
  • Place dimensions outside the building footprint where possible
  • Use three dimension strings: overall, intermediate (grid-to-grid), and detailed (opening-to-opening)
  • Dimension text should read from bottom or right side of sheet
  • Use consistent units: mm for metric, feet-inches for imperial
  • Avoid crossing dimension lines over each other
2.6 North Arrow and Scale Bar
  • North arrow: Required on every plan drawing. Use project north (aligned to building grid) with true north indicated by separate arrow if different.
  • Scale bar: Graphic scale bar required on every drawing. Numeric scale alone is insufficient because drawings may be reproduced at different sizes. Graphic bar maintains accuracy regardless of print scaling.
  • Scale bar length: Typically represents a round number (1m, 5m, 10m).

3. BIM Level of Development (LOD) Requirements

3.1 LOD Definitions

The BIM Forum LOD Specification defines the following levels:

LOD 100 -- Concept Design

  • Overall building massing, volume, and area
  • Generic placeholders indicating approximate size, shape, location
  • Used for: conceptual analysis, early cost modeling, scheduling
  • Geometric accuracy: Not reliable for measurement

LOD 200 -- Schematic Design

  • Approximate geometry with approximate quantities, size, shape, location
  • Non-geometric information may be attached
  • Used for: schematic analysis, approximate cost estimates
  • Geometric accuracy: Approximate; elements recognizable as intended type

LOD 300 -- Design Development

  • Precise geometry with specific dimensions, shape, location, orientation
  • Materials specified; performance criteria defined
  • Used for: code compliance, design coordination, detailed cost estimates
  • Geometric accuracy: Suitable for measurement and coordination

LOD 350 -- Construction Documentation

  • All LOD 300 content plus interfaces with other building systems
  • Connections, supports, and blocking modeled
  • Coordination with other disciplines resolved
  • Used for: clash detection, construction coordination, shop drawing prep
  • Geometric accuracy: Fully coordinated; construction-ready

LOD 400 -- Fabrication

  • Sufficient detail for fabrication and assembly
  • Precise dimensions, connections, and installation information
  • Used for: shop drawings, CNC fabrication, prefabrication
  • Geometric accuracy: Fabrication-level precision

LOD 500 -- As-Built

  • Field-verified representation of completed construction
  • Actual dimensions and locations as installed
  • Used for: facility management, operations, future renovation
  • Geometric accuracy: Verified against field conditions
3.2 LOD Requirements by Element Type
Building ElementSD (LOD)DD (LOD)CD (LOD)Fab (LOD)
Structural columns200300350400
Structural beams200300350400
Exterior walls200300350400
Interior partitions100300350350
Doors200300350400
Windows200300350400
Curtain walls200300350400
Stairs200300350400
Elevators100200350400
Mechanical equipment100200350400
Ductwork--200350400
Piping--200350400
Electrical panels100200350350
Light fixtures--200350350
Ceiling systems100200350350
Casework/millwork100300350400
Site elements200300350350
3.3 Model Coordination Requirements

At LOD 350 and above, the following coordination checks are mandatory:

  • Clash detection: Hard clashes (physical intersections), soft clashes (clearance violations), and 4D clashes (scheduling conflicts)
  • Spatial coordination: Verify ceiling plenum space accommodates all MEP routing with minimum clearances
  • Penetration coordination: All structural penetrations identified, sized, and sleeved
  • Fire separation: Rated assemblies continuous and uncompromised
  • Accessibility: Clear widths, turning radii, and mounting heights verified in model

4. Specification Writing

4.1 CSI MasterFormat Divisions

The Construction Specifications Institute (CSI) MasterFormat organizes specifications into the following divisions:

DivisionTitleTypical Architectural Content
01General RequirementsSummary, price forms, alternates, schedules, submittals, quality, temporary facilities
02Existing ConditionsDemolition, hazmat abatement, site assessment
03ConcreteCast-in-place, precast, architectural concrete
04MasonryUnit masonry, stone assemblies, glass unit masonry
05MetalsStructural steel, miscellaneous metals, ornamental metal
06Wood, Plastics, CompositesRough carpentry, finish carpentry, millwork, FRP
07Thermal/Moisture ProtectionWaterproofing, insulation, roofing, sealants, flashing
08OpeningsDoors, windows, curtain walls, hardware, glazing
09FinishesPlaster, gypsum board, tiling, flooring, painting
10SpecialtiesVisual display, toilet accessories, signage, lockers
11EquipmentKitchen equipment, athletic equipment, lab equipment
12FurnishingsCasework, window treatments, furniture
13Special ConstructionSwimming pools, clean rooms, radiation protection
14Conveying EquipmentElevators, escalators, dumbwaiters
21Fire SuppressionSprinkler systems, standpipes
22PlumbingFixtures, piping, drainage
23HVACAir handling, ductwork, controls
25Integrated AutomationBuilding automation systems
26ElectricalPower distribution, lighting, controls
27CommunicationsData, voice, AV systems
28Electronic Safety/SecurityAccess control, CCTV, fire alarm
31EarthworkGrading, excavation, fill
32Exterior ImprovementsPaving, site furnishings, fencing
33UtilitiesStorm drainage, water supply, sanitary sewer
40-49Process Integration/EquipmentIndustrial processes, electrical systems
4.2 Specification Types

Prescriptive Specification

  • Names the specific product, manufacturer, and model number
  • Simplest to write; limits competition; maximum control
  • Example: "Provide Acme Corporation Model XR-500 door closer"

Performance Specification

  • States required performance criteria; allows vendor to propose solution
  • Encourages innovation; more complex to evaluate
  • Example: "Provide door closer capable of controlling doors up to 100 kg, with adjustable backcheck, closing speed 3-7 seconds, and complying with EN 1154 Class 4"

Proprietary Specification

  • Names approved manufacturers or products with "or equal" clause
  • Balance of control and competition
  • Example: "Provide Acme XR-500 or approved equal meeting the following requirements..."

Reference Standard Specification

  • References an industry standard (ASTM, EN, ISO) for material or performance requirements
  • Example: "Concrete masonry units shall comply with ASTM C90, Grade N, Type I"
Show full SKILL.md (1,423 more words)Show less
4.3 Three-Part Specification Format

Every specification section follows the CSI three-part format:

Part 1 -- General

  • 1.01 Summary: Scope of work, related sections, work by others
  • 1.02 References: Applicable standards (ASTM, ANSI, EN, ISO)
  • 1.03 Definitions: Technical terms specific to this section
  • 1.04 Submittals: Shop drawings, product data, samples, test reports
  • 1.05 Quality Assurance: Installer qualifications, mock-ups, pre-installation meetings
  • 1.06 Delivery, Storage, Handling: Protection requirements
  • 1.07 Project Conditions: Environmental requirements for installation
  • 1.08 Warranty: Duration and coverage beyond standard warranty

Part 2 -- Products

  • 2.01 Materials: Base materials, acceptable standards
  • 2.02 Manufactured Products: Specific products or performance criteria
  • 2.03 Fabrication: Shop fabrication requirements, tolerances
  • 2.04 Finishes: Surface treatments, coatings, colors
  • 2.05 Source Quality Control: Factory testing, certifications

Part 3 -- Execution

  • 3.01 Examination: Site conditions verification before installation
  • 3.02 Preparation: Surface preparation, priming, layout
  • 3.03 Installation: Step-by-step installation requirements
  • 3.04 Field Quality Control: Testing, inspection requirements
  • 3.05 Adjusting: Post-installation adjustment
  • 3.06 Cleaning: Post-installation cleaning requirements
  • 3.07 Protection: Protection of installed work during construction

5. Schedule Production

5.1 Door Schedule

Standard door schedule columns:

ColumnDescription
Door TagUnique identifier matching plan annotation
LocationRoom name or room number where door is located
WidthClear opening width (mm or feet-inches)
HeightClear opening height
ThicknessDoor leaf thickness
TypeSingle, pair, sliding, pocket, overhead, revolving
MaterialWood, hollow metal, aluminum, FRP, glass
Fire RatingNone, 20 min, 45 min, 60 min, 90 min, 3 hr
Smoke RatingYes/No; S-label for smoke doors
Hardware SetNumber referencing hardware group specification
Frame TypeHollow metal, wood, aluminum; anchor type
Frame MaterialSame as door or different
GlazingVision panel size, type, fire-rated if applicable
FinishPaint color, stain, anodized, powder coat
UndercutGap at bottom for air transfer
ThresholdType (saddle, ADA, interlocking, none)
RemarksSpecial notes, ADA, security, acoustic rating
5.2 Window Schedule

Standard window schedule columns:

ColumnDescription
Window TagUnique identifier matching plan/elevation tag
WidthOverall frame width
HeightOverall frame height
Sill HeightHeight from finished floor to sill
TypeFixed, casement, awning, hopper, sliding, tilt-turn
Frame MaterialAluminum, wood, PVC, steel, fiberglass
Glazing SpecSingle, double, triple; low-e coating; gas fill
U-valueThermal transmittance of complete window assembly
SHGCSolar Heat Gain Coefficient
VLTVisible Light Transmittance
STCSound Transmission Class
Operator TypeHandle, crank, motorized, none (fixed)
ScreenYes/No; type (insect, solar, retractable)
FinishAnodized, powder coat, painted; color
Fire RatingIf required by location (property line proximity)
RemarksSafety glazing, impact-rated, blast-rated
5.3 Finish Schedule

Standard finish schedule format:

ColumnDescription
Room NumberMatching plan room tag
Room NameDescriptive name
Floor FinishFinish code (e.g., F1 = Porcelain tile)
Floor BaseBase type code (e.g., B1 = Ceramic cove base)
Wall Finish NorthFinish code per wall orientation
Wall Finish SouthFinish code per wall orientation
Wall Finish EastFinish code per wall orientation
Wall Finish WestFinish code per wall orientation
Ceiling FinishFinish code (e.g., C1 = Gypsum board, painted)
Ceiling HeightHeight in mm or feet-inches
RemarksWet area coating, antimicrobial, accent walls

Finish codes should be defined in a legend:

  • F1: Porcelain tile 600x600
  • F2: Vinyl plank flooring
  • F3: Sealed concrete
  • F4: Carpet tile
  • B1: Ceramic cove base 100mm
  • B2: Rubber base 100mm
  • B3: Wood base 75mm
  • W1: Paint on gypsum board (GWB)
  • W2: Ceramic wall tile
  • W3: Stone veneer
  • C1: Gypsum board painted
  • C2: Suspended acoustic ceiling tile
  • C3: Exposed structure painted
5.4 Fixture and Equipment Schedules

Plumbing Fixture Schedule: Tag, type (WC, lavatory, sink, shower), manufacturer, model, mounting (floor, wall), supply connection, waste size, accessibility compliance, finish.

Equipment Schedule: Tag, equipment name, manufacturer, model, dimensions, weight, power requirements (voltage, phase, amperage), plumbing connections, ventilation requirements, clearances required.

5.5 Room Data Sheets

For complex program types (hospitals, laboratories, data centers), room data sheets replace or supplement finish schedules. Each room gets a dedicated sheet listing:

  • Room number, name, department, and function
  • Area (net, gross)
  • Floor, wall, and ceiling finishes with performance requirements
  • Mechanical requirements (temperature, humidity, air changes, pressure)
  • Electrical requirements (circuits, outlets, dedicated power)
  • Lighting requirements (lux level, color temperature)
  • Plumbing requirements (fixtures, gases, vacuum)
  • IT/communications requirements
  • Furniture and equipment list
  • Security requirements (access control level)
  • Acoustic requirements (NC rating, STC between rooms)

6. Construction Administration

6.1 Architect's Role During Construction

The architect's role during construction is defined by the Owner-Architect agreement (AIA B101 or equivalent). The architect does NOT supervise construction -- the contractor is solely responsible for means, methods, techniques, sequences, and safety. The architect performs the following:

6.2 RFI (Request for Information) Processing
  • Contractor submits RFI when drawings or specifications are unclear
  • Architect logs, reviews, and responds typically within 5-7 business days
  • Response options: clarify intent, issue supplemental sketch (ASI), refer to specification section, defer to consultant, request contractor proposal
  • All RFIs are numbered sequentially and tracked in a log
  • RFIs that result in cost or schedule impact may become change orders
6.3 Submittal Review
  • Contractor submits product data, shop drawings, samples, and mock-ups
  • Architect reviews for conformance with design intent (not code compliance -- that remains contractor's responsibility)
  • Standard turnaround: 14-21 business days from receipt
  • Review stamps: Approved, Approved as Noted, Revise and Resubmit, Rejected
  • Submittals requiring resubmission restart the review clock
  • Architect maintains a submittal log tracking status of all items
6.4 Change Order Review
  • Changes arise from: owner requests, unforeseen conditions, design errors, code changes, value engineering
  • Process: Contractor submits proposal (COR), architect reviews scope and cost, recommends to owner, owner authorizes change order (CO)
  • Architect evaluates: Is the work within original scope? Is the cost reasonable? Is the time extension justified?
  • All change orders tracked in a log with cumulative cost impact
6.5 Site Observations
  • Architect conducts periodic site observations (not continuous inspection) at intervals appropriate to the stage of construction
  • Purpose: determine if work is generally in accordance with contract documents
  • Architect is NOT a building inspector and does NOT certify code compliance
  • Document observations in field reports with photographs
  • Note deficiencies and report to contractor in writing
  • Typical frequency: biweekly during active construction, weekly during critical phases (waterproofing, fireproofing, facade installation)
6.6 Payment Certificate Review
  • Contractor submits monthly application for payment
  • Architect reviews percentage complete by line item
  • Architect certifies amount due to owner for payment
  • Retainage typically held: 10% until substantial completion, reduced to 5% or released at final completion
  • Architect is NOT an auditor; certification is based on observations and contractor's representations
6.7 Substantial Completion
  • Defined as: the stage when the work is sufficiently complete that the owner can use it for its intended purpose
  • Architect conducts substantial completion inspection
  • Issues Certificate of Substantial Completion if warranted
  • Begins warranty period from date of substantial completion
  • Generates punch list: a detailed list of incomplete or deficient items that the contractor must correct
6.8 Punch List
  • Architect walks the entire project documenting deficiencies
  • Items categorized: incomplete work, damaged work, work not conforming to documents, cleaning required
  • Contractor addresses all items within agreed timeframe (typically 30 days)
  • Architect re-inspects to verify corrections
  • Release of final retainage contingent on punch list completion
6.9 Final Completion
  • All punch list items resolved
  • All closeout documents received: warranties, as-built drawings, operations manuals, maintenance manuals, spare parts, keying schedule
  • Architect issues Final Certificate for Payment
  • Final retainage released
  • Architect's services under construction administration conclude
6.10 Warranty Period
  • Standard warranty period: 12 months from date of substantial completion (per AIA A201 General Conditions)
  • Extended warranties for specific systems (roofing: 15-20 years, waterproofing: 10 years, mechanical equipment: 2-5 years)
  • Architect may conduct 11-month warranty inspection to identify deficiencies before warranty expiration
  • Owner should maintain warranty documentation for entire building life
6.11 Document Control and Record Keeping

Throughout construction, the architect maintains:

  • RFI log with all responses
  • Submittal log with review status
  • Change order log with cumulative cost tracking
  • Field report file with photographs
  • Meeting minutes from all OAC (Owner-Architect-Contractor) meetings
  • Correspondence log
  • ASI (Architect's Supplemental Instruction) log
  • Payment certification records
  • Punch list and closeout tracking

All documents should be maintained in a project management information system (PMIS) with version control and audit trail. Digital platforms such as Procore, Newforma, PlanGrid, or BIM 360 are standard tools for construction document management.


Summary

Construction documentation is the bridge between design intent and built reality. Incomplete, inconsistent, or poorly coordinated documents are the primary source of construction conflicts, cost overruns, and quality failures. Mastery of drawing organization, graphic standards, BIM coordination, specification writing, schedule production, and construction administration processes is essential for every practicing architect.

The standards in this document align with:

  • AIA Document Standards (A201, B101)
  • CSI MasterFormat and SectionFormat
  • BIM Forum LOD Specification
  • ISO 19650 (BIM Information Management)
  • National CAD Standard (NCS) -- United States
  • BS 1192 / PAS 1192 -- United Kingdom

© Abhinavbwj, MIT. Rendered from Markdown: HTML in the file is shown as text, images as links, and headings moved down two levels. Raw file

Files

SKILL.md and 4 other files (references) in skills/construction-documentation of Abhinavbwj/Skills-Architects.

  • SKILL.md
  • references/drawing-standards.md
  • references/specification-systems.md
  • templates/drawing-checklist.md
  • templates/specification-template.md

Open the folder on GitHubat commit 30a0845

Compare with similar skills

Construction Documentation next to the 5 skills that share the most tags, products or categories with it. Stars are the repository's; “used in” counts other GitHub owners with a copy.

Construction Documentation compared with similar skills
SkillStarsUsed inTokensAuto-checkLicenceRepo updated
Construction Documentation this skillAbhinavbwj/Skills-Architects295—~8.1kAutomated safety check: PassMIT
Architecture Patternswshobson/agents40k—~2kAutomated safety check: PassMIT
Android Clean Architectureaffaan-m/ECC274k4 repos~2.2kAutomated safety check: PassMIT
Architecture Patternsdavila7/claude-code-templates32k4 repos~483Automated safety check: PassMIT
Architecture Docs Writerprisma/orm48k—~1.6kAutomated safety check: PassApache-2.0
Architecture Decision Recordsaffaan-m/ECC274k4 repos~1.8kAutomated safety check: PassMIT

Similar skills

  • Architecture Patterns

    wshobson/agents

    Implement proven backend architecture patterns including Clean Architecture, Hexagonal Architecture, and Domain-Driven Design.

    40k GitHub stars~2k tokensUpdated 2 days ago
    DevelopmentAuto-check passed
  • Applies Clean Architecture to Android and Kotlin Multiplatform projects: module layout, dependency rules, UseCases, Repositories and data layer patterns.

    274k GitHub starsUsed in 4 repos~2.2k tokens
    DevelopmentAuto-check passed
  • Architecture Patterns

    davila7/claude-code-templates

    Master proven backend architecture patterns including Clean Architecture, Hexagonal Architecture, and Domain-Driven Design to build maintainable, testable, and scalable systems.

    32k GitHub starsUsed in 4 repos~483 tokens
    DevelopmentAuto-check passed
  • Official

    Guides writing and rewriting architecture subsystem docs, ADRs and reference pages so they make sense to a developer with no prior project context.

    48k GitHub stars~1.6k tokensUpdated today
    DevelopmentAuto-check passed
  • Capture architectural decisions as numbered ADR markdown files in docs/adr/ with context, alternatives considered, consequences, and an index README.

    274k GitHub starsUsed in 4 repos~1.8k tokens
    DevelopmentAuto-check passed
  • Architecture

    JanDeDobbeleer/oh-my-posh

    Cross-language architecture and clean-code principles for this project: Clean Code, Object Calisthenics, SOLID, guard clauses, hot-path cost, and the code review checklist.

    24k GitHub stars~1.5k tokensUpdated today
    DevelopmentAuto-check passed

More from Abhinavbwj/Skills-Architects

All 17 skills in this repo
  • Architect Calculators

    Abhinavbwj/Skills-Architects

    Seven command-line Python calculators for early architectural checks: area and density, U-value, daylight factor, egress, structural load, energy demand and cost.

    295 GitHub stars~3.4k tokensUpdated 4 mo ago
    Auto-check passed
  • Building Typology Reference

    Abhinavbwj/Skills-Architects

    Compares building types, from detached houses to supertall towers, using plan depth, density and efficiency metrics plus exemplar buildings.

    295 GitHub starsUsed in 1 repo~8.5k tokens
    Auto-check passed
  • Building Programming

    Abhinavbwj/Skills-Architects

    Guides architectural programming work: space needs, adjacency matrices, area schedules and net-to-gross checks for project briefs across common building types.

    295 GitHub stars~7.4k tokensUpdated 4 mo ago
    Auto-check passed
  • Architectural Concept Design

    Abhinavbwj/Skills-Architects

    Knowledge base for early-stage architectural design: parti development, massing studies, spatial organization and translating abstract ideas into building form.

    295 GitHub starsUsed in 1 repo~11k tokens
    Auto-check passed
  • Design Theory

    Abhinavbwj/Skills-Architects

    Architectural movements, design philosophy, critical theory, precedent analysis, and compositional principles for informed design reasoning

    295 GitHub starsUsed in 1 repo~8.5k tokens
    Auto-check passed
  • Material Selection

    Abhinavbwj/Skills-Architects

    Architectural material properties, durability, sustainability, specification, detailing, life-cycle assessment, and material palettes for building design

    295 GitHub starsUsed in 1 repo~8.4k tokens
    Auto-check passed

Questions about Construction Documentation

What does Construction Documentation do?

Comprehensive construction documentation skill covering architectural drawing sets, sheet organization and numbering, drawing standards (line weights, text, hatching, dimensions), BIM Level of…. Construction Documentation is an agent skill from Abhinavbwj/Skills-Architects. Comprehensive construction documentation skill covering architectural drawing sets, sheet organization and numbering, drawing standards (line weights, text, hatching, dimensions), BIM Level of Development (LOD) requirements, specification writing using CSI MasterFormat, schedule production (door, window, finish, fixture), and construction administration workflows including RFI processing, submittal review, change orders, site observations, punch lists, and warranty period management.

How do I install Construction Documentation in Claude Code?

Run `npx skills add Abhinavbwj/Skills-Architects --skill construction-documentation -a claude-code`. Or copy the skill folder (skills/construction-documentation in Abhinavbwj/Skills-Architects) into .claude/skills/construction-documentation in your project. Claude Code loads it when a task matches its description.

How do I install Construction Documentation in Codex?

Run `npx skills add Abhinavbwj/Skills-Architects --skill construction-documentation -a codex`. Or copy the skill folder (skills/construction-documentation in Abhinavbwj/Skills-Architects) into .agents/skills/construction-documentation in your project. Codex loads it when a task matches its description.

Can I use Construction Documentation in Cursor, Gemini CLI or GitHub Copilot?

Cursor, Gemini CLI, GitHub Copilot and OpenCode also load SKILL.md folders. With the skills CLI, run `npx skills add Abhinavbwj/Skills-Architects --skill construction-documentation -a cursor` (or -a gemini-cli, github-copilot or opencode for the others). To copy it by hand, put the folder in .cursor/skills/construction-documentation, .gemini/skills/construction-documentation, .github/skills/construction-documentation and .opencode/skills/construction-documentation in your project.

What does Construction Documentation need to run?

SKILL.md names no scripts, command-line tools or credentials: Construction Documentation is instructions for the agent only.

Does Construction Documentation access the network?

SKILL.md contains no URLs. Any network use would come from the scripts or tools the agent runs. This is read from the text; nothing was executed.

Is Construction Documentation safe to install?

Our automated static check of SKILL.md found no risky patterns, such as piping downloads into a shell, reading credential files or hidden Unicode. It is not a guarantee. Review the folder before installing.

What licence does Construction Documentation use?

Construction Documentation is published under the MIT licence (the repository's licence). It allows redistribution, so the full SKILL.md is shown on this page.

How many tokens does Construction Documentation use?

About 8.1k tokens (SKILL.md is roughly 32k characters). Agents keep only the skill's name and description in context until a task matches; then they load SKILL.md in full. Its references folder adds about 8.3k tokens, read only when the agent opens those files.

What are the alternatives to Construction Documentation?

Skills that share tags, products or a category with Construction Documentation: Architecture Patterns (wshobson/agents, 40k stars), Android Clean Architecture (affaan-m/ECC, 274k stars), Architecture Patterns (davila7/claude-code-templates, 32k stars) and Architecture Docs Writer (prisma/orm, 48k stars). The comparison table on this page puts their stars, adoption, token cost, safety result and licence side by side.

Who maintains Construction Documentation?

Abhinavbwj (a GitHub user) maintains it in Abhinavbwj/Skills-Architects, which has 295 GitHub stars. The repository holds 17 skills in this directory. The repository was last updated on May 20, 2026.

Source: Abhinavbwj/Skills-Architects on GitHub. Facts on this page come from the repository at the commit we read; the author's words are quoted as theirs.