Agent skill

Cost Estimation

by Abhinavbwj in Abhinavbwj/Urban-Design-Skills-Claude

Estimate construction costs, infrastructure costs, soft costs, and total development costs for urban design projects.

MITAuto-check passed

Install Cost Estimation

skills CLI
$ npx skills add Abhinavbwj/Urban-Design-Skills-Claude --skill cost-estimation -a claude-code

Project install by default; add -g for ~/.claude/skills/.

GitHub CLI
$ gh skill install Abhinavbwj/Urban-Design-Skills-Claude cost-estimation --agent claude-code

Project scope by default; add --scope user for a personal install. Needs GitHub CLI 2.90.0 or later (public preview).

Manual copy
$ git clone --depth 1 https://github.com/Abhinavbwj/Urban-Design-Skills-Claude.git skills-src && mkdir -p .claude/skills && cp -r skills-src/skills/cost-estimation .claude/skills/cost-estimation && rm -rf skills-src

Use ~/.claude/skills/ instead of .claude/skills for a personal install. The folder must contain SKILL.md.

Claude Code skills documentation · loads skills from .claude/skills/

Facts

Skill name
cost-estimation
GitHub stars
132
Used in
1 other repo
Token cost
~5k tokens
SKILL.md length
1,832 words
Files
5 (incl. scripts, references)
Skills in repo
18
Repo updated
First seen
Licence
MIT

At a glance

Estimate construction costs, infrastructure costs, soft costs, and total development costs for urban design projects.

  • Works in 8 steps: Building Construction Cost → Infrastructure Costs → Soft Costs → …
  • The user asks about project cost
  • SKILL.md covers 1. Building Construction Cost, 2. Infrastructure Costs, 3. Soft Costs and 4. Total Development Cost…, plus 6 more sections
  • Runs Python scripts from its folder; calls python

What it does

Cost Estimation is an agent skill from Abhinavbwj/Urban-Design-Skills-Claude. Estimate construction costs, infrastructure costs, soft costs, and total development costs for urban design projects. Covers building construction cost per m2 by typology, infrastructure cost per linear meter and per dwelling, site preparation, landscaping, professional fees, and financial feasibility analysis. Use when the user asks about project cost, construction cost, infrastructure budget, development feasibility, cost per unit, cost per m2, capital expenditure, opex, cost benchmarking, value engineering…

Its SKILL.md is about 5k tokens, which your agent loads only when the skill is triggered. The skill folder holds 6 other files, including scripts and reference files (for example `references/construction-costs.md`, `references/feasibility-analysis.md` and `references/infrastructure-costs.md`).

The repository describes itself as: Urban Design Skills Claude. The licence is MIT.

When your agent uses it

  • The user asks about project cost
  • Construction cost
  • Infrastructure budget
  • Development feasibility

Example prompts

  • “/cost-estimation”

Requirements

  • Python 3

Workflow steps

8 steps, taken from the step headings in SKILL.md.

  1. Building Construction Cost
  2. Infrastructure Costs
  3. Soft Costs
  4. Total Development Cost Assembly
  5. Revenue and Feasibility
  6. Phased Development Costing
  7. Cost Benchmarks from Exemplar Projects
  8. Cost Estimation Calculator

What it can do on your machine

Read from SKILL.md and the folder at commit 666327b. It shows what the files ask for, not the result of running them.

  • Tool permissions

    Pre-approves nothing: there is no allowed-tools line, so your agent's usual permission prompts apply.

    From allowed-tools in the SKILL.md frontmatter.

  • Runs code

    Ships 1 file in scripts/ (Python), which the agent can run.

    Shell commands in SKILL.md call:

    • python

    From the folder's file list and the shell code blocks in SKILL.md.

  • Network

    No URLs in SKILL.md.

    From URLs in SKILL.md, links to its own repository left out.

  • Credentials

    Names no API keys, tokens, secrets or passwords.

    From names ending in _API_KEY, _TOKEN, _SECRET, _KEY or _PASSWORD in SKILL.md.

Context cost

Cost Estimation loads about 5k tokens when it runs, and up to ~12k if it reads all its reference files. Until then it costs about 196 tokens; SKILL.md has 1,832 words of instructions outside code blocks.

Always · name and description, kept in context so the agent knows when to use it
~196
When it runs · the whole SKILL.md, loaded when a task matches
~5k
With references · SKILL.md plus every file in references/, read only if the agent opens them
~12k

Estimates: characters ÷ 4, the usual rule of thumb; real counts depend on the model's tokenizer. Scripts and assets cost tokens only if the agent reads them.

Safety

Auto-check passed

The automated check found no risky patterns in SKILL.md.

Automated static check — not a guarantee. Review scripts before installing. It scans the text of SKILL.md for risky patterns (piping downloads into a shell, reading credential files, hidden Unicode, destructive commands); the scripts in this folder are not scanned.

SKILL.md

The full file from Abhinavbwj/Urban-Design-Skills-Claude at commit 666327b, republished under its MIT licence (© Abhinavbwj). 1,832 words, ~5,014 tokens.

Download SKILL.mdSave it as .claude/skills/cost-estimation/SKILL.md (or your agent's skills folder). This skill also uses 4 other files; get the full folder from GitHub.
name
cost-estimation
description
Estimate construction costs, infrastructure costs, soft costs, and total development costs for urban design projects. Covers building construction cost per m2 by typology, infrastructure cost per linear meter and per dwelling, site preparation, landscaping, professional fees, and financial feasibility analysis. Use when the user asks about project cost, construction cost, infrastructure budget, development feasibility, cost per unit, cost per m2, capital expenditure, opex, cost benchmarking, value engineering, phasing costs, or any question about how much an urban design project or its components will cost. Also use for preliminary budget estimation, order-of- magnitude costing, cost comparison between design alternatives, or cost optimization of masterplans.

Cost Estimation Skill

This skill provides a systematic framework for estimating the capital costs of urban design projects at the masterplan and district scales. It draws on international construction cost benchmarks (Turner & Townsend, Rider Levett Bucknall, AECOM, Arcadis), infrastructure costing guides (CIRIA, ASCE), and development appraisal methodology (RICS Red Book, ULI).

All costs are provided in USD (2025 baseline) with regional adjustment factors. The goal is to enable early-stage cost estimation accurate to +/- 25-30% (AACE Class 4 estimate) sufficient for masterplan feasibility and design option comparison.


1. Building Construction Cost

1.1 Cost per m2 GFA by Building Type

Costs include structure, envelope, MEP, finishes, and contractor overhead and profit. Exclude land, professional fees, and site infrastructure (those are separate categories below).

Residential

TypeLowMediumHighPremium
Detached house$800$1,200$1,800$2,500+
Townhouse / row house$750$1,100$1,600$2,200+
Low-rise apartment (1-3 floors)$900$1,300$1,800$2,400+
Mid-rise apartment (4-10 floors)$1,100$1,600$2,200$3,000+
High-rise apartment (11-25 floors)$1,400$2,000$2,800$4,000+
Super-tall apartment (25+ floors)$2,000$2,800$4,000$6,000+
Affordable housing (basic spec)$600$900$1,200N/A
Student housing$900$1,300$1,700$2,200
Senior housing / care home$1,200$1,800$2,500$3,500

Commercial

TypeLowMediumHighPremium
Office (standard)$1,200$1,800$2,500$3,500+
Office (Grade A / LEED Platinum)$1,800$2,500$3,500$5,000+
Retail (shell and core)$700$1,000$1,400$2,000
Retail (fitted out)$1,000$1,500$2,200$3,500+
Hotel (3-star)$1,400$2,000$2,800N/A
Hotel (5-star)$2,500$3,500$5,000$8,000+
Supermarket$800$1,100$1,500$2,000
Food hall / market$900$1,400$2,000$3,000

Civic / Institutional

TypeLowMediumHighPremium
Primary school$1,200$1,800$2,500$3,500
Secondary school$1,400$2,000$2,800$4,000
University building$1,800$2,500$3,500$5,000
Healthcare clinic$1,500$2,200$3,200$4,500
Hospital$2,500$3,500$5,000$7,500
Community center$1,000$1,500$2,200$3,000
Library$1,400$2,000$3,000$4,500
Place of worship$800$1,400$2,500$5,000+
Fire / police station$1,200$1,800$2,500N/A
Sports hall / indoor courts$1,000$1,500$2,200$3,200

Parking

TypeCost per SpaceCost per m2
Surface lot$3,000-5,000$100-170
Structured above-grade$20,000-35,000$570-1,000
Underground (1 level)$35,000-50,000$875-1,250
Underground (2+ levels)$45,000-65,000$1,125-1,625
Automated / mechanical$30,000-60,000$1,500-3,000
1.2 Regional Cost Adjustment Factors

Apply these multipliers to the base costs above:

RegionFactorNotes
US Northeast / California1.20-1.40High labor costs
US Southeast / Midwest0.85-1.00Base region
US Southwest0.90-1.05
Western Europe (UK, France, Germany)1.10-1.35
Northern Europe (Scandinavia)1.30-1.60High labor, weather
Southern Europe (Spain, Italy, Greece)0.80-1.00
Eastern Europe0.50-0.75
GCC / Gulf States0.90-1.20Imported materials and labor
India0.25-0.45
China (Tier 1 cities)0.40-0.65
Southeast Asia0.30-0.55
Australia / New Zealand1.15-1.40
Sub-Saharan Africa0.40-0.70Supply chain premium
Latin America0.35-0.60
Japan / South Korea1.00-1.30
1.3 Height Premium

Building cost increases with height due to structural requirements, vertical transportation, and construction complexity:

FloorsPremium over Low-Rise Base
1-31.00x (base)
4-61.05-1.10x
7-101.10-1.20x
11-151.15-1.30x
16-251.25-1.45x
26-401.40-1.70x
41-601.60-2.00x
60+2.00-2.50x+
1.4 Sustainability Premium
Certification LevelAdditional Cost
Basic compliance (code minimum)0% (baseline)
LEED Silver / BREEAM Good1-3%
LEED Gold / BREEAM Very Good2-5%
LEED Platinum / BREEAM Outstanding5-10%
Net Zero Carbon8-15%
Net Zero Energy10-20%
Passive House standard5-15%
Mass timber structure (CLT)0-8% (varies; sometimes cost-neutral)

2. Infrastructure Costs

2.1 Road and Street Construction
ElementUnitLowMediumHigh
Local street (full build)per linear meter$800$1,500$2,500
Collector street (full build)per linear meter$1,500$2,800$4,500
Arterial road (full build)per linear meter$3,000$5,500$9,000
Sidewalk (concrete, 2m wide)per linear meter$100$180$300
Protected cycle track (one-way)per linear meter$150$300$500
Protected cycle track (two-way)per linear meter$200$400$700
Asphalt resurfacingper m2$15$30$50
Concrete paving (vehicular)per m2$40$70$120
Unit paving (pedestrian areas)per m2$60$120$250
Traffic signal (full intersection)each$80,000$200,000$400,000
Roundabout (single lane)each$200,000$500,000$1,000,000
Pedestrian bridgeper linear meter$5,000$15,000$40,000
Vehicular bridgeper m2 deck$2,000$4,000$8,000
2.2 Utilities
UtilityUnitLowMediumHigh
Water main (150-300mm)per linear meter$150$300$500
Water main (300-600mm)per linear meter$300$600$1,000
Sewer (gravity, 200-400mm)per linear meter$200$400$700
Sewer (gravity, 400-800mm)per linear meter$400$800$1,400
Storm drain (300-600mm)per linear meter$150$350$600
Storm drain (600-1200mm)per linear meter$400$800$1,500
Pump station (water)each$200,000$500,000$1,500,000
Pump station (sewer)each$300,000$800,000$2,000,000
Water treatment (per ML/day)each$500,000$1,500,000$4,000,000
Wastewater treatment (per ML/day)each$800,000$2,500,000$6,000,000
Power distribution (underground HV)per linear meter$300$600$1,200
Power distribution (underground LV)per linear meter$100$250$500
Substation (11/33kV)each$200,000$500,000$1,200,000
Telecom duct (multi-way)per linear meter$50$120$250
District cooling pipeper linear meter$400$800$1,500
District heating pipeper linear meter$300$600$1,200
Gas main (medium pressure)per linear meter$100$250$450
2.3 Transit Infrastructure
ElementUnitLowMediumHigh
BRT (full standard, at-grade)per km$5M$15M$30M
LRT (at-grade)per km$20M$40M$80M
LRT (elevated)per km$40M$70M$120M
Metro (underground)per km$100M$200M$400M
Metro station (underground)each$50M$150M$400M
BRT station (median)each$200K$500K$1.5M
LRT stop (at-grade)each$1M$3M$8M
Bus interchange / terminaleach$5M$15M$40M
Park-and-ride (per space)per space$5,000$15,000$35,000
2.4 Green Infrastructure
ElementUnitLowMediumHigh
Neighborhood park (basic)per m2$40$80$150
District park (developed)per m2$60$120$250
Urban plaza (hard landscape)per m2$150$350$700
Waterfront promenadeper linear meter$3,000$8,000$20,000
Playground (equipped)each$50,000$200,000$500,000
Sports field (natural turf)each$200,000$500,000$1,000,000
Sports field (synthetic turf)each$400,000$800,000$1,500,000
Street tree (installed, large)each$500$1,500$4,000
Bioswale / rain gardenper linear meter$100$250$500
Green roof (extensive)per m2$80$150$250
Green roof (intensive)per m2$200$400$700
Stormwater detention basinper m3 storage$50$150$400
Underground detention tankper m3 storage$300$700$1,500
2.5 All-In Infrastructure Cost per Dwelling Equivalent

For quick estimates when detailed design is not yet available:

ContextInfrastructure Cost per Dwelling
Greenfield (all new)$30,000-80,000
Brownfield (partial reuse)$15,000-50,000
Urban infill (existing network)$8,000-25,000
High-density urban (shared)$5,000-15,000

These include roads, utilities, open space, and community infrastructure apportioned per dwelling equivalent.


3. Soft Costs

3.1 Professional Fees
Service% of Construction Cost
Architecture4-8%
Structural engineering1-3%
MEP engineering2-4%
Civil / infrastructure engineering3-6%
Landscape architecture1-3%
Urban design / masterplan1-3%
Transport planning0.5-1.5%
Environmental consultant0.5-2%
Quantity surveyor / cost consultant1-2%
Project management3-5%
Planning / regulatory consultant0.5-1.5%
Sustainability / LEED consultant0.5-1.5%

Total professional fees: typically 15-25% of construction cost for a complex urban project. Simpler projects: 12-18%.

Show full SKILL.md (713 more words)Show less
3.2 Other Soft Costs
Item% of Total Development Cost
Legal fees1-3%
Insurance (builder's risk)0.5-1.5%
Permitting and approvals0.5-2%
Survey and geotechnical0.3-1%
Environmental assessment (EIA)0.5-2%
Marketing and sales2-5% (residential), 1-3% (commercial)
Finance costs (construction loan)3-8% (depends on duration and rates)
Developer overhead3-5%
Contingency5-15% (depends on project stage)
3.3 Contingency by Project Stage
StageRecommended Contingency
Concept / masterplan (AACE Class 5)20-30%
Schematic design (AACE Class 4)15-25%
Design development (AACE Class 3)10-15%
Construction documents (AACE Class 2)5-10%
Tender / pre-construction (AACE Class 1)3-5%

4. Total Development Cost Assembly

4.1 Cost Stack Structure
1. Land Acquisition
   + Stamp duty / transfer taxes (1-5%)
   + Legal and due diligence (0.5-1%)

2. Site Preparation
   + Demolition (if brownfield)
   + Remediation (if contaminated)
   + Earthworks and grading
   + Temporary works and site setup (2-5% of construction)

3. Infrastructure
   + Roads and streets
   + Utilities (water, sewer, storm, power, telecom)
   + Open space and landscaping
   + Transit infrastructure (if applicable)

4. Building Construction
   + Substructure (foundations)
   + Superstructure (frame, envelope)
   + MEP (mechanical, electrical, plumbing)
   + Finishes and fit-out

5. Soft Costs
   + Professional fees (15-25% of construction)
   + Permitting and approvals
   + Marketing and sales
   + Legal and insurance

6. Finance Costs
   + Construction loan interest
   + Arrangement fees

7. Developer Margin
   + Profit target: 15-20% on cost (residential)
   + Profit target: 15-25% on cost (commercial/speculative)

8. Contingency
   + As per project stage (Section 3.3)
4.2 Quick Cost Assembly (Rule of Thumb)

For rapid order-of-magnitude estimates:

Total Development Cost (excl. land) =
  Building Construction Cost
  x 1.15-1.25 (infrastructure and external works, 15-25% of building cost)
  x 1.18-1.25 (professional fees and soft costs)
  x 1.05-1.10 (finance costs)
  x 1.10-1.25 (contingency)

Simplified: Building Cost x 1.55-2.00 = Total Development Cost (excl. land)

Example:
  50,000 m2 mixed-use at $2,000/m2 building cost = $100M building
  Total development cost = $100M x 1.75 = $175M (excl. land)

5. Revenue and Feasibility

5.1 Revenue Estimation
ProductRevenue BasisTypical Range
Residential (sale)$/m2 NIA$2,000-15,000+
Residential (rent)$/m2/month$15-80+
Office (rent)$/m2/year$150-800+
Retail (rent)$/m2/year$200-2,000+
Hotel (revenue)$/room/night (ADR)$80-500+
Parking (sale)$/space$20,000-80,000
Parking (rent)$/space/month$100-600
5.2 Feasibility Quick Tests

Residual Land Value Test:

Residual Land Value = Total Revenue - Total Development Cost (excl. land)
                    - Developer Profit

If Residual Land Value > Land Acquisition Cost → Feasible
If Residual Land Value < Land Acquisition Cost → Not feasible at this program

Profit on Cost:

Profit on Cost = (Total Revenue - Total Cost including land) / Total Cost
Target: > 15% for residential, > 20% for commercial

Yield on Cost (income-producing):

Yield on Cost = Net Operating Income (Year 1) / Total Development Cost
Target: 1-2% above prevailing cap rate

Infrastructure Ratio Check:

Infrastructure Cost / Total Development Cost

Healthy: < 15%
Watchpoint: 15-25%
Red flag: > 25% (infrastructure-heavy; consider increasing density)
5.3 Value Engineering Strategies

When costs exceed feasibility, consider these strategies in order of impact:

StrategyTypical SavingImpact on Quality
Increase density (more units sharing infrastructure)10-30% per unitPositive if well-designed
Simplify building form (reduce facade complexity)5-15%Moderate
Standardize floor plates and unit types5-10%Low
Reduce underground parking (shift to above-grade)$15,000-30,000 per spaceLow-moderate
Phase infrastructure (build only what's needed now)10-20% of infrastructureLow
Reduce specification level (finishes, lobby, amenities)5-15%Moderate
Switch structural system (steel to concrete or timber)3-10%Low
Prefabricate / modular construction5-20%Low
Reduce building height (avoid high-rise premium)5-25%Context-dependent
Shared parking strategy (reduce total spaces)10-25% of parking costLow

6. Phased Development Costing

6.1 Phasing Cost Principles
  1. Front-loading infrastructure hurts feasibility - Each phase must generate enough revenue to fund its own infrastructure plus contribute to shared trunk infrastructure
  2. Catalyst investment - Budget 5-10% of total project cost for early catalyst projects (park, plaza, community facility) that establish place value
  3. Temporary works - Budget $500-2,000/m2 for temporary activation of undeveloped land (markets, events, pop-up retail)
  4. Escalation - Apply 3-5% annual escalation to construction costs for future phases
  5. Revenue growth - As place-making takes effect, later phases typically achieve 10-30% higher sales/rental values
6.2 Infrastructure Triggers

Plan infrastructure investment to match development triggers:

TriggerInfrastructure RequiredTypical Cost
First 200 dwellingsPrimary access road, water/sewer connection, temporary open space$5-15M
500 dwellingsPrimary school site, neighborhood park, local retail$10-25M
1,000 dwellingsSecondary road network, expanded utilities, community center$15-40M
2,000 dwellingsHealth center, secondary school, district park$20-50M
5,000 dwellingsFull road network, transit stop, sports facilities$40-100M
10,000+ dwellingsTransit line extension, regional infrastructure$100M+

7. Cost Benchmarks from Exemplar Projects

ProjectScaleTotal CostCost/m2 GFACost/Dwelling
Vauban, Freiburg38 ha, 5,500 units~$850M~$1,800~$155,000
HafenCity, Hamburg157 ha, 7,000 units~$14B~$3,500~$350,000
King's Cross, London27 ha, 2,000 units~$4B~$3,200~$280,000
Hammarby Sjostad200 ha, 11,000 units~$3.5B~$2,200~$180,000
Masdar City (Phase 1)640 ha (planned)~$22B~$4,500N/A
Eko Atlantic, Lagos10 km2 (planned)~$6B~$1,200N/A
Hudson Yards, NYC11 ha (above platform)~$25B~$6,000~$2,500,000
Nordhavn, Copenhagen200 ha (planned)~$5B~$2,800~$220,000

Note: Costs are approximate and include varying scopes. Use for order-of-magnitude comparison only. Adjust for year of construction and local market conditions.


8. Cost Estimation Calculator

For precise cost estimation, use the Python calculator:

bash
python scripts/cost_estimator.py \
  --residential-gfa 50000 --residential-spec medium \
  --office-gfa 15000 --office-spec high \
  --retail-gfa 5000 --retail-spec medium \
  --parking-spaces 400 --parking-type structured \
  --infrastructure-roads 2000 --infrastructure-utilities 3000 \
  --region gulf --contingency 0.20

See the urban-calculator skill for full calculator usage and the scripts/cost_estimator.py file for all parameters.


Cross-Skill Integration

This skill integrates with:

  • masterplan-design: Cost estimation is essential for Phase 8 (Implementation) and phasing strategy
  • mixed-use-programming: Program and GFA outputs feed directly into cost estimation
  • block-and-density: Building typology and height determine construction cost category
  • mobility-and-transport: Transit and road infrastructure costs are major cost drivers
  • sustainability-scoring: Green certification targets add sustainability premiums
  • urban-calculator: Density and FAR outputs determine building quantum for costing
  • zoning-and-codes: Regulatory requirements (parking, setbacks, height) affect buildable area and cost

Deep Knowledge References

For complete construction cost tables by building type with detailed breakdowns (substructure, superstructure, MEP, finishes):

For infrastructure cost estimation methodology including capacity sizing, network layout optimization, and phased delivery:

For financial feasibility analysis including cash flow modeling, sensitivity analysis, and funding mechanisms:

© Abhinavbwj, MIT. Rendered from Markdown: HTML in the file is shown as text, images as links, and headings moved down two levels. Raw file

Files

SKILL.md and 4 other files (scripts, references) in skills/cost-estimation of Abhinavbwj/Urban-Design-Skills-Claude.

  • SKILL.md
  • references/construction-costs.md
  • references/feasibility-analysis.md
  • references/infrastructure-costs.md
  • scripts/cost_estimator.py

Open the folder on GitHubat commit 666327b

Used in 1 other repository

We found 1 copy of this SKILL.md (exact, near-identical or edited) in other folders, from 1 other GitHub owner. This page covers the copy in Abhinavbwj/Urban-Design-Skills-Claude, which our catalogue first saw on October 7, 2026.

Compare with similar skills

Cost Estimation next to the 5 skills that share the most tags, products or categories with it. Stars are the repository's; “used in” counts other GitHub owners with a copy.

Cost Estimation compared with similar skills
SkillStarsUsed inTokensAuto-checkLicenceRepo updated
Cost Estimation this skillAbhinavbwj/Urban-Design-Skills-Claude1321 repos~5kAutomated safety check: PassMIT
Afrexai Construction EstimatorLeoYeAI/openclaw-master-skills2.2k—~6.1kAutomated safety check: PassMIT
Cost Conversationruvnet/ruflo74k—~407Automated safety check: NotesMIT
Cost Optimizeruvnet/ruflo74k1 repos~997Automated safety check: NotesMIT
Cost Trackingaffaan-m/ECC275k1 repos~1.3kAutomated safety check: PassMIT
Cost Summaryruvnet/ruflo74k1 repos~594Automated safety check: NotesMIT

Similar skills

  • Afrexai Construction Estimator

    LeoYeAI/openclaw-master-skills

    Complete construction estimating and cost management system.

    2.2k GitHub stars~6.1k tokensUpdated 2 mo ago
    Sales & SupportAuto-check passed
  • Cost Conversation

    ruvnet/ruflo

    Per-conversation cost view — list every session in cost-tracking with started-at, message count, top model, and total cost

    74k GitHub stars~407 tokensUpdated today
    AI & LLM EngineeringAuto-check: notes
  • Cost Optimize

    ruvnet/ruflo

    Analyze token usage patterns and recommend cost optimizations with estimated savings

    74k GitHub starsUsed in 1 repo~997 tokens
    AI & LLM EngineeringAuto-check: notes
  • Cost Tracking

    affaan-m/ECC

    Track and report Claude Code token usage, spending, and budgets from the local ECC cost-tracker metrics log.

    275k GitHub starsUsed in 1 repo~1.3k tokens
    AI & LLM EngineeringAuto-check passed
  • Cost Summary

    ruvnet/ruflo

    Single-shot programmatic dump of all cost data — total spend, per-tier, top session, budget status, federation aggregate.

    74k GitHub starsUsed in 1 repo~594 tokens
    Auto-check: notes
  • Cost Report

    ruvnet/ruflo

    Generate a cost report showing token usage and USD costs by agent and model

    74k GitHub starsUsed in 1 repo~830 tokens
    AI & LLM EngineeringAuto-check: notes

More from Abhinavbwj/Urban-Design-Skills-Claude

All 18 skills in this repo
  • Urban Calculator

    Abhinavbwj/Urban-Design-Skills-Claude

    Python computational tools for urban design metric calculations including density, FAR, walkability scoring, parking requirements, green space analysis, and block optimization.

    132 GitHub starsUsed in 1 repo~1.9k tokens
    Auto-check passed
  • Block And Density

    Abhinavbwj/Urban-Design-Skills-Claude

    Design urban blocks and optimize density using typological analysis, FAR calculations, and building configuration strategies.

    132 GitHub starsUsed in 1 repo~7.5k tokens
    Auto-check passed
  • Design Evaluation

    Abhinavbwj/Urban-Design-Skills-Claude

    Evaluate urban designs against comprehensive criteria drawn from all major global standards, certification systems, and theoretical frameworks.

    132 GitHub starsUsed in 1 repo~9.2k tokens
    Auto-check passed
  • Mobility And Transport

    Abhinavbwj/Urban-Design-Skills-Claude

    Comprehensive mobility and transport planning for urban design including trip generation, mode split targets, street network connectivity, transit planning, cycling network design, pedestrian…

    132 GitHub starsUsed in 1 repo~6.1k tokens
    Auto-check passed
  • Precedent Study

    Abhinavbwj/Urban-Design-Skills-Claude

    Research and analyze urban design precedents systematically.

    132 GitHub starsUsed in 1 repo~5.1k tokens
    Auto-check passed
  • Site Analysis

    Abhinavbwj/Urban-Design-Skills-Claude

    Conduct comprehensive multi-scale site analysis from regional to neighborhood to site scale.

    132 GitHub starsUsed in 1 repo~8.5k tokens
    Auto-check passed

Questions about Cost Estimation

What does Cost Estimation do?

Estimate construction costs, infrastructure costs, soft costs, and total development costs for urban design projects. Cost Estimation is an agent skill from Abhinavbwj/Urban-Design-Skills-Claude. Estimate construction costs, infrastructure costs, soft costs, and total development costs for urban design projects.

When should I use Cost Estimation?

Cost Estimation fits situations like: the user asks about project cost; construction cost; infrastructure budget; development feasibility.

How do I install Cost Estimation in Claude Code?

Run `npx skills add Abhinavbwj/Urban-Design-Skills-Claude --skill cost-estimation -a claude-code`. Or copy the skill folder (skills/cost-estimation in Abhinavbwj/Urban-Design-Skills-Claude) into .claude/skills/cost-estimation in your project. Claude Code loads it when a task matches its description.

How do I install Cost Estimation in Codex?

Run `npx skills add Abhinavbwj/Urban-Design-Skills-Claude --skill cost-estimation -a codex`. Or copy the skill folder (skills/cost-estimation in Abhinavbwj/Urban-Design-Skills-Claude) into .agents/skills/cost-estimation in your project. Codex loads it when a task matches its description.

Can I use Cost Estimation in Cursor, Gemini CLI or GitHub Copilot?

Cursor, Gemini CLI, GitHub Copilot and OpenCode also load SKILL.md folders. With the skills CLI, run `npx skills add Abhinavbwj/Urban-Design-Skills-Claude --skill cost-estimation -a cursor` (or -a gemini-cli, github-copilot or opencode for the others). To copy it by hand, put the folder in .cursor/skills/cost-estimation, .gemini/skills/cost-estimation, .github/skills/cost-estimation and .opencode/skills/cost-estimation in your project.

What does Cost Estimation need to run?

Going by SKILL.md and its folder, Cost Estimation needs Python for the scripts in its folder and the command-line tools its instructions call (python). Our summary lists: Python 3.

Does Cost Estimation access the network?

SKILL.md contains no URLs. Any network use would come from the scripts or tools the agent runs. This is read from the text; nothing was executed.

Is Cost Estimation safe to install?

Our automated static check of SKILL.md found no risky patterns, such as piping downloads into a shell, reading credential files or hidden Unicode. It is not a guarantee. The check reads SKILL.md only: the scripts in the folder are not scanned, so read them before running anything.

What licence does Cost Estimation use?

Cost Estimation is published under the MIT licence (the repository's licence). It allows redistribution, so the full SKILL.md is shown on this page.

How many tokens does Cost Estimation use?

About 5k tokens (SKILL.md is roughly 20k characters). Agents keep only the skill's name and description in context until a task matches; then they load SKILL.md in full. Its references folder adds about 7.1k tokens, read only when the agent opens those files.

What are the alternatives to Cost Estimation?

Skills that share tags, products or a category with Cost Estimation: Afrexai Construction Estimator (LeoYeAI/openclaw-master-skills, 2.2k stars), Cost Conversation (ruvnet/ruflo, 74k stars), Cost Optimize (ruvnet/ruflo, 74k stars) and Cost Tracking (affaan-m/ECC, 275k stars). The comparison table on this page puts their stars, adoption, token cost, safety result and licence side by side.

Who maintains Cost Estimation?

Abhinavbwj (a GitHub user) maintains it in Abhinavbwj/Urban-Design-Skills-Claude, which has 132 GitHub stars. The repository holds 18 skills in this directory. The repository was last updated on March 12, 2026.

Source: Abhinavbwj/Urban-Design-Skills-Claude on GitHub. Facts on this page come from the repository at the commit we read; the author's words are quoted as theirs.