Complete construction estimating and cost management system.
$ npx skills add LeoYeAI/openclaw-master-skills --skill afrexai-construction-estimator -a claude-codeProject install by default; add -g for ~/.claude/skills/.
$ gh skill install LeoYeAI/openclaw-master-skills afrexai-construction-estimator --agent claude-codeProject scope by default; add --scope user for a personal install. Needs GitHub CLI 2.90.0 or later (public preview).
$ git clone --depth 1 https://github.com/LeoYeAI/openclaw-master-skills.git skills-src && mkdir -p .claude/skills && cp -r skills-src/skills/afrexai-construction-estimator .claude/skills/afrexai-construction-estimator && rm -rf skills-srcUse ~/.claude/skills/ instead of .claude/skills for a personal install. The folder must contain SKILL.md.
Claude Code skills documentation · loads skills from .claude/skills/
Install the "afrexai-construction-estimator" agent skill from https://github.com/LeoYeAI/openclaw-master-skills/tree/main/skills/afrexai-construction-estimator into .claude/skills/afrexai-construction-estimator/ in this project. Copy the whole folder (SKILL.md and every file beside it), keep the folder name "afrexai-construction-estimator", then confirm the skill loads.Claude Code copies the folder itself, the same result as the manual copy. Check what it changed before you commit it.
$skill-installer install https://github.com/LeoYeAI/openclaw-master-skills/tree/main/skills/afrexai-construction-estimatorType this inside Codex. $skill-installer <name> installs a curated skill from openai/skills. The installer writes to $CODEX_HOME/skills (default ~/.codex/skills). Restart Codex if the skill does not show up.
$ npx skills add LeoYeAI/openclaw-master-skills --skill afrexai-construction-estimator -a codexProject install goes to .agents/skills/; add -g for ~/.codex/skills/.
$ gh skill install LeoYeAI/openclaw-master-skills afrexai-construction-estimator --agent codexProject scope by default (.agents/skills/); add --scope user for a personal install.
$ git clone --depth 1 https://github.com/LeoYeAI/openclaw-master-skills.git skills-src && mkdir -p .agents/skills && cp -r skills-src/skills/afrexai-construction-estimator .agents/skills/afrexai-construction-estimator && rm -rf skills-srcUse ~/.agents/skills/ instead of .agents/skills for a personal install.
Codex skills documentation · loads skills from .agents/skills/
Install the "afrexai-construction-estimator" agent skill from https://github.com/LeoYeAI/openclaw-master-skills/tree/main/skills/afrexai-construction-estimator into .agents/skills/afrexai-construction-estimator/ in this project. Copy the whole folder (SKILL.md and every file beside it), keep the folder name "afrexai-construction-estimator", then confirm the skill loads.Codex copies the folder itself, the same result as the manual copy. Check what it changed before you commit it.
$ npx skills add LeoYeAI/openclaw-master-skills --skill afrexai-construction-estimator -a cursorProject install goes to .agents/skills/; add -g for ~/.cursor/skills/.
$ gh skill install LeoYeAI/openclaw-master-skills afrexai-construction-estimator --agent cursorProject scope by default (.agents/skills/); add --scope user for a personal install.
$ git clone --depth 1 https://github.com/LeoYeAI/openclaw-master-skills.git skills-src && mkdir -p .cursor/skills && cp -r skills-src/skills/afrexai-construction-estimator .cursor/skills/afrexai-construction-estimator && rm -rf skills-srcUse ~/.cursor/skills/ instead of .cursor/skills for a personal install.
Cursor skills documentation · loads skills from .cursor/skills/, .agents/skills/, .claude/skills/, .codex/skills/
Install the "afrexai-construction-estimator" agent skill from https://github.com/LeoYeAI/openclaw-master-skills/tree/main/skills/afrexai-construction-estimator into .cursor/skills/afrexai-construction-estimator/ in this project. Copy the whole folder (SKILL.md and every file beside it), keep the folder name "afrexai-construction-estimator", then confirm the skill loads.Cursor copies the folder itself, the same result as the manual copy. Check what it changed before you commit it.
$ gemini skills install https://github.com/LeoYeAI/openclaw-master-skills.git --path skills/afrexai-construction-estimator--scope user (default) or --scope workspace; --path is the subfolder of the repo that holds the skill; --consent skips the security confirmation prompt.
$ npx skills add LeoYeAI/openclaw-master-skills --skill afrexai-construction-estimator -a gemini-cliProject install goes to .agents/skills/; add -g for ~/.gemini/skills/.
$ gh skill install LeoYeAI/openclaw-master-skills afrexai-construction-estimator --agent gemini-cliProject scope by default (.agents/skills/); add --scope user for a personal install.
$ git clone --depth 1 https://github.com/LeoYeAI/openclaw-master-skills.git skills-src && mkdir -p .gemini/skills && cp -r skills-src/skills/afrexai-construction-estimator .gemini/skills/afrexai-construction-estimator && rm -rf skills-srcUse ~/.gemini/skills/ instead of .gemini/skills for a personal install, then run /skills reload.
Gemini CLI skills documentation · loads skills from .gemini/skills/, .agents/skills/
Install the "afrexai-construction-estimator" agent skill from https://github.com/LeoYeAI/openclaw-master-skills/tree/main/skills/afrexai-construction-estimator into .gemini/skills/afrexai-construction-estimator/ in this project. Copy the whole folder (SKILL.md and every file beside it), keep the folder name "afrexai-construction-estimator", then confirm the skill loads.Gemini CLI copies the folder itself, the same result as the manual copy. Check what it changed before you commit it.
$ gh skill install LeoYeAI/openclaw-master-skills afrexai-construction-estimatorInstalls for Copilot at project scope by default; add --scope user for a personal install. Preview a skill first with gh skill preview. Needs GitHub CLI 2.90.0 or later (public preview).
$ npx skills add LeoYeAI/openclaw-master-skills --skill afrexai-construction-estimator -a github-copilotProject install goes to .agents/skills/; add -g for ~/.copilot/skills/.
$ git clone --depth 1 https://github.com/LeoYeAI/openclaw-master-skills.git skills-src && mkdir -p .github/skills && cp -r skills-src/skills/afrexai-construction-estimator .github/skills/afrexai-construction-estimator && rm -rf skills-srcUse ~/.copilot/skills/ instead of .github/skills for a personal install. Commit .github/skills so cloud agent and code review can use it.
GitHub Copilot skills documentation · loads skills from .github/skills/, .claude/skills/, .agents/skills/
Install the "afrexai-construction-estimator" agent skill from https://github.com/LeoYeAI/openclaw-master-skills/tree/main/skills/afrexai-construction-estimator into .github/skills/afrexai-construction-estimator/ in this project. Copy the whole folder (SKILL.md and every file beside it), keep the folder name "afrexai-construction-estimator", then confirm the skill loads.GitHub Copilot copies the folder itself, the same result as the manual copy. Check what it changed before you commit it.
$ npx skills add LeoYeAI/openclaw-master-skills --skill afrexai-construction-estimator -a opencodeOpenCode documents no install command of its own. Project install goes to .agents/skills/; add -g for ~/.config/opencode/skills/.
$ gh skill install LeoYeAI/openclaw-master-skills afrexai-construction-estimator --agent opencodeProject scope by default (.agents/skills/); add --scope user for a personal install.
$ git clone --depth 1 https://github.com/LeoYeAI/openclaw-master-skills.git skills-src && mkdir -p .opencode/skills && cp -r skills-src/skills/afrexai-construction-estimator .opencode/skills/afrexai-construction-estimator && rm -rf skills-srcUse ~/.config/opencode/skills/ instead of .opencode/skills for a personal install.
OpenCode skills documentation · loads skills from .opencode/skills/, .claude/skills/, .agents/skills/
Install the "afrexai-construction-estimator" agent skill from https://github.com/LeoYeAI/openclaw-master-skills/tree/main/skills/afrexai-construction-estimator into .opencode/skills/afrexai-construction-estimator/ in this project. Copy the whole folder (SKILL.md and every file beside it), keep the folder name "afrexai-construction-estimator", then confirm the skill loads.OpenCode copies the folder itself, the same result as the manual copy. Check what it changed before you commit it.
afrexai-construction-estimatorComplete construction estimating and cost management system.
Afrexai Construction Estimator is an agent skill from LeoYeAI/openclaw-master-skills. Complete construction estimating and cost management system. Use when preparing project estimates, bid proposals, cost breakdowns, value engineering, change order management, or construction budget tracking. Covers residential, commercial, and infrastructure projects. Trigger on 'estimate', 'construction cost', 'bid', 'takeoff', 'cost breakdown', 'change order', 'value engineering', 'construction budget', 'unit pricing', 'RSMeans'.
Its SKILL.md is about 6.1k tokens, which your agent loads only when the skill is triggered. The skill folder holds 2 other files (for example `README.md` and `_meta.json`).
It sits in Sales & Support, covering Cloud cost optimization, Proposals and quotes and E-commerce operations. The repository describes itself as: 🧠 Curated collection of 1209+ best OpenClaw skills — weekly updated by MyClaw.ai. The licence is MIT.
12 steps, taken from the step headings in SKILL.md.
Read from SKILL.md and the folder at commit e5199b5. It shows what the files ask for, not the result of running them.
Pre-approves nothing: there is no allowed-tools line, so your agent's usual permission prompts apply.
From allowed-tools in the SKILL.md frontmatter.
No scripts in the folder and no shell commands in SKILL.md (its code samples are yaml).
From the folder's file list and the shell code blocks in SKILL.md.
No URLs in SKILL.md.
From URLs in SKILL.md, links to its own repository left out.
Names no API keys, tokens, secrets or passwords.
From names ending in _API_KEY, _TOKEN, _SECRET, _KEY or _PASSWORD in SKILL.md.
Afrexai Construction Estimator loads about 6.1k tokens when it runs. Until then it costs about 117 tokens; SKILL.md has 2,077 words of instructions outside code blocks.
Estimates: characters ÷ 4, the usual rule of thumb; real counts depend on the model's tokenizer. Scripts and assets cost tokens only if the agent reads them.
The automated check found no risky patterns in SKILL.md.
Automated static check — not a guarantee. Review scripts before installing. It scans the text of SKILL.md for risky patterns (piping downloads into a shell, reading credential files, hidden Unicode, destructive commands); files beside SKILL.md are not scanned.
The full file from LeoYeAI/openclaw-master-skills at commit e5199b5, republished under its MIT licence (© LeoYeAI). 2,077 words, ~6,083 tokens.
.claude/skills/afrexai-construction-estimator/SKILL.md (or your agent's skills folder). This skill also uses 2 other files; get the full folder from GitHub.Complete construction estimating methodology — from quantity takeoff to bid submission. Zero dependencies.
| Project Stage | Estimate Type | Accuracy | Basis | Use Case |
|---|---|---|---|---|
| Concept | Order of Magnitude | -30% to +50% | SF/unit costs | Go/no-go decisions |
| Schematic | Conceptual/Budget | -15% to +30% | Assembly costs | Budget approval |
| Design Dev | Detailed | -10% to +15% | Quantity takeoff | GMP/bid preparation |
| Construction Docs | Definitive/Bid | -5% to +10% | Full QTO + subs | Lump sum bid |
| Construction | Control | Actual costs | Committed + forecast | Cost management |
project:
name: ""
number: ""
type: residential | commercial | industrial | infrastructure | renovation
delivery: design-bid-build | design-build | CM-at-risk | IPD
location:
city: ""
state: ""
zip: ""
location_factor: 1.00 # RSMeans city cost index / national average
owner: ""
architect: ""
scope:
gross_sf: 0
stories: 0
site_acres: 0
description: ""
schedule:
bid_date: ""
construction_start: ""
substantial_completion: ""
duration_months: 0
estimate:
type: order-of-magnitude | conceptual | detailed | definitive
base_date: "" # Date costs are based on
escalation_rate: 0.04 # Annual construction cost escalation
assumptions:
- ""
exclusions:
- ""
allowances:
- item: ""
amount: 0| Type | Key Considerations | Typical $/SF Range (2024-2026) |
|---|---|---|
| Single Family Residential | Foundation type, finishes grade, energy code | $150-$400/SF |
| Multi-Family | Unit mix, parking ratio, amenities | $200-$450/SF |
| Office (Class A) | Curtain wall, MEP density, TI allowance | $250-$550/SF |
| Retail | Shell vs TI, storefront, grease traps | $150-$350/SF |
| Healthcare/Hospital | Life safety, med gas, shielding | $400-$900/SF |
| K-12 Education | Prevailing wage, hazmat, phasing | $300-$600/SF |
| Warehouse/Distribution | Clear height, slab flatness, dock count | $80-$180/SF |
| Hotel | Star rating drives finish, FF&E budget | $200-$500/SF |
| Infrastructure (road/mile) | Soil conditions, utilities, traffic control | $2M-$10M/mile |
Use CSI MasterFormat 2018 for ALL estimates. Every line item maps to a division.
| Division | Name | Typical % of Total |
|---|---|---|
| 01 | General Requirements | 8-12% |
| 02 | Existing Conditions | 1-5% |
| 03 | Concrete | 8-15% |
| 04 | Masonry | 2-6% |
| 05 | Metals (Structural Steel) | 8-15% |
| 06 | Wood, Plastics, Composites | 3-8% |
| 07 | Thermal & Moisture Protection | 4-8% |
| 08 | Openings (Doors/Windows) | 3-7% |
| 09 | Finishes | 8-15% |
| 10 | Specialties | 1-3% |
| 11 | Equipment | 1-5% |
| 12 | Furnishings | 1-5% |
| 13 | Special Construction | 0-3% |
| 14 | Conveying Equipment (Elevators) | 1-4% |
| 21 | Fire Suppression | 2-4% |
| 22 | Plumbing | 4-8% |
| 23 | HVAC | 8-15% |
| 26 | Electrical | 8-15% |
| 27 | Communications | 1-3% |
| 28 | Electronic Safety & Security | 1-3% |
| 31 | Earthwork | 3-8% |
| 32 | Exterior Improvements | 2-6% |
| 33 | Utilities | 2-5% |
line_item:
division: "03"
spec_section: "03 30 00"
description: "Cast-in-Place Concrete - Elevated Slabs"
quantity: 450
unit: CY
unit_cost:
labor: 85.00
material: 165.00
equipment: 25.00
subcontractor: 0.00
total_unit_cost: 275.00
extended_cost: 123750.00
waste_factor: 0.07
adjusted_quantity: 481.5
notes: "4500 PSI, #5 rebar @ 12\" OC EW, 6\" slab"
source: "Sub quote - ABC Concrete (02/15/2026)"
confidence: high | medium | low| Check | Formula | Flag If |
|---|---|---|
| Concrete per SF | Total CY ÷ Building SF | >0.15 CY/SF (unless heavy structure) |
| Steel per SF | Total tons ÷ Building SF | >15 PSF (unless high-rise) |
| Drywall SF | Total drywall SF ÷ Floor SF | <2.0 or >4.0 ratio |
| Electrical per SF | Electrical $ ÷ Building SF | >$35/SF (standard office) |
| Plumbing fixtures | Count vs occupancy | Missing fixtures for code compliance |
| Parking spaces | Per local code requirements | Below minimum ratio |
Cost source hierarchy (most reliable first):
labor_rate_build_up:
trade: "Carpenter"
base_wage: 42.50
fringe_benefits: 18.75 # Health, pension, vacation, training
payroll_taxes: 8.90 # FICA, FUTA, SUTA, workers comp
total_burden: 27.65
burdened_rate: 70.15
productivity_factors:
weather: 1.00 # 1.0 = normal, 1.15 = winter
overtime: 1.00 # 1.0 = straight time, 1.5 = OT
height: 1.00 # 1.0 = ground, 1.10 = >30ft
congestion: 1.00 # 1.0 = open, 1.15 = tight
shift: 1.00 # 1.0 = day, 1.10 = swing, 1.15 = night
adjusted_rate: 70.15Score each sub quote (use minimum 3 per trade):
| Factor | Weight | 1-5 Score |
|---|---|---|
| Price competitiveness | 30% | |
| Scope completeness (covers all spec sections?) | 25% | |
| Qualifications/exclusions (red flags?) | 20% | |
| Past performance/reputation | 15% | |
| Bond capacity/insurance | 10% | |
| Weighted Total | 100% |
Red flags in sub quotes:
Crew Daily Cost = Σ(Workers × Daily Rate) + Equipment Daily Cost
Crew Daily Output = Units per 8-hour day (from labor standards)
Unit Cost = Crew Daily Cost ÷ Crew Daily OutputExample — Concrete Placement Crew:
| Item | Duration-Based? | Typical Range |
|---|---|---|
| Project Manager | Yes | $12K-$18K/month |
| Superintendent | Yes | $10K-$16K/month |
| Project Engineer | Yes | $8K-$12K/month |
| Field Office (trailer) | Yes | $1K-$3K/month |
| Temporary utilities | Yes | $2K-$5K/month |
| Temporary toilets | Yes | $200-$500/month each |
| Dumpsters/waste removal | Yes | $1K-$4K/month |
| Safety equipment/supplies | Yes | $500-$2K/month |
| Small tools & consumables | Lump | 1-2% of labor |
| Final cleaning | Lump | $0.15-$0.50/SF |
| Permits (building) | Lump | Varies by jurisdiction |
| Insurance (Builder's Risk) | Lump | 0.5-1.5% of cost |
| Performance/Payment Bond | Lump | 1-3% of contract |
| Testing & inspection | Lump | 0.5-1.5% of cost |
| As-built documentation | Lump | $5K-$25K |
| Commissioning support | Lump | $10K-$50K |
Rule of thumb: General conditions = 8-15% of direct costs (lower for large projects, higher for small/complex).
markup_calculation:
direct_costs: 2500000
general_conditions:
percentage: 0.10
amount: 250000
subtotal_1: 2750000
overhead:
percentage: 0.05 # Home office overhead
amount: 137500
subtotal_2: 2887500
profit:
percentage: 0.05 # Varies by market/risk
amount: 144375
subtotal_3: 3031875
contingency:
design_contingency: 0.05 # For incomplete drawings
construction_contingency: 0.03 # For unforeseen conditions
amount: 242550
bond:
percentage: 0.015
amount: 49118
escalation:
rate: 0.04 # Annual
months_to_midpoint: 8
amount: 88536
total_estimate: 3412079
cost_per_sf: 341.21 # For 10,000 SF building| Estimate Type | Design Contingency | Construction Contingency |
|---|---|---|
| Order of Magnitude | 15-25% | 10-15% |
| Conceptual | 10-15% | 5-10% |
| Detailed | 3-8% | 3-5% |
| Definitive/Bid | 0-3% | 2-3% |
Contingency is NOT profit padding. Track and justify every contingency draw.
Score 1-5 for each (minimum 30 to bid):
| Factor | Weight | Score |
|---|---|---|
| Project type experience | 3x | |
| Client relationship/history | 2x | |
| Current workload capacity | 3x | |
| Geographic fit | 2x | |
| Profit potential | 3x | |
| Competition level (fewer = better) | 2x | |
| Risk profile (lower = better) | 3x | |
| Schedule feasibility | 2x | |
| Bonding capacity available | 2x | |
| Weighted Total | /110 |
48 hours before:
Day of bid:
Market conditions affect markup:
Bid spread analysis (track your results):
Bid Spread = (Your Bid - Low Bid) ÷ Low Bid × 100| System | VE Opportunity | Typical Savings | Risk Level |
|---|---|---|---|
| Structural | Steel vs concrete frame | 5-15% of structure | Medium |
| Foundations | Spread vs mat vs piles | 10-30% of foundation | High (geotech dependent) |
| Envelope | Curtain wall vs storefront | 15-30% of facade | Low-Medium |
| Roofing | TPO vs modified bitumen | 10-20% of roofing | Low |
| Mechanical | VAV vs VRF | 10-25% of HVAC | Medium |
| Electrical | LED fixtures, panel optimization | 5-15% of electrical | Low |
| Finishes | Material substitutions | 10-40% of finishes | Low |
| Site | Reduce import/export of soil | 10-30% of sitework | Medium |
ve_item:
number: VE-001
description: "Substitute VRF system for conventional VAV"
division: "23"
original:
description: "VAV air handling system with ductwork"
cost: 850000
proposed:
description: "Variable Refrigerant Flow (VRF) with DOAS"
cost: 680000
savings: 170000
savings_pct: 20%
impact:
schedule: "Reduces mechanical rough-in by 2 weeks"
quality: "Better zone control, lower operating cost"
maintenance: "Higher per-unit cost but less ductwork"
code_compliance: "Meets ASHRAE 90.1, verify local amendments"
risk: medium
recommendation: accept | reject | modify
requires_redesign: yes | no
redesign_cost: 15000
net_savings: 155000Contractor markup on changes (typical):
| Tier | Self-Performed Work | Subcontractor Work |
|---|---|---|
| Overhead | 10% | 5% |
| Profit | 10% | 5% |
| Bond | Add actual % | Add actual % |
Time & Material (T&M) documentation requirements:
change_order:
number: CO-001
date: ""
description: ""
reason:
type: owner-directed | unforeseen-condition | design-error | code-change | scope-clarification
rfi_number: ""
cost_breakdown:
labor:
hours: 0
rate: 0
total: 0
material:
items: []
total: 0
equipment:
items: []
total: 0
subcontractor:
items: []
total: 0
direct_cost: 0
markup: 0.15
total_cost: 0
schedule_impact:
days: 0
critical_path: yes | no
explanation: ""
status: pending | approved | rejected | negotiatingBudget at Completion (BAC) = Total budget
Planned Value (PV) = Budgeted cost of work scheduled
Earned Value (EV) = Budgeted cost of work performed
Actual Cost (AC) = Actual cost of work performed
Schedule Performance Index (SPI) = EV / PV
>1.0 = ahead of schedule
<1.0 = behind schedule
Cost Performance Index (CPI) = EV / AC
>1.0 = under budget
<1.0 = over budget
Estimate at Completion (EAC) = BAC / CPI
Variance at Completion (VAC) = BAC - EACcost_report:
project: ""
period: ""
report_date: ""
summary:
original_contract: 0
approved_changes: 0
pending_changes: 0
current_budget: 0
committed_cost: 0 # Subcontracts + POs
actual_cost_to_date: 0
forecast_to_complete: 0
estimate_at_completion: 0
variance: 0
contingency_remaining: 0
schedule:
percent_complete: 0
spi: 0
cpi: 0
days_ahead_behind: 0
cash_flow:
billed_to_date: 0
collected_to_date: 0
retention_held: 0
risk_items:
- description: ""
potential_cost: 0
probability: high | medium | low
mitigation: ""| Signal | What It Means | Action |
|---|---|---|
| CPI < 0.95 in first 25% | Systemic cost overrun | Root cause analysis NOW |
| Contingency burn > schedule % | Burning contingency too fast | Tighten change management |
| >5 pending COs unsigned | Cash flow risk, scope dispute | Escalate to PM/owner |
| Sub invoices > committed | Sub performing extra work | Verify scope, issue CO or stop work |
| Retainage release requests early | Sub cash flow problems | Monitor closely, check lien waivers |
Add these factors to renovation estimates:
Critical factors:
sitework_checklist:
geotechnical:
- Soil bearing capacity
- Water table depth
- Rock depth (blasting vs mechanical?)
- Contamination (Phase I/II ESA results)
earthwork:
cut_cy: 0
fill_cy: 0
import_export: 0 # Net CY to haul
haul_distance_miles: 0
compaction_required: standard | proctor_95 | proctor_98
utilities:
water_tap_fee: 0
sewer_tap_fee: 0
fire_line: 0
storm_detention: required | not_required
paving:
asphalt_sy: 0
concrete_sy: 0
curb_lf: 0
striping_lf: 0
landscape:
sod_sf: 0
trees_ea: 0
irrigation: yes | no
erosion_control: silt_fence | inlet_protection | retention_pond| System | $/SF Benchmark (Commercial Office) | Flag If |
|---|---|---|
| HVAC | $25-$50/SF | >$55 or <$20 |
| Plumbing | $12-$25/SF | >$30 or <$8 |
| Fire Protection | $4-$8/SF | >$10 or <$3 |
| Electrical (power) | $18-$35/SF | >$40 or <$12 |
| Low voltage/data | $5-$12/SF | >$15 or <$3 |
| Total MEP | $64-$130/SF | >$150 or <$46 |
Future Cost = Current Cost × (1 + Annual Rate) ^ (Months to Midpoint ÷ 12)Recent escalation trends (US):
Always escalate to the MIDPOINT of construction, not the start.
Local Cost = National Average Cost × City Cost IndexSample RSMeans City Cost Indices (100 = national average):
| City | Index | City | Index | |
|---|---|---|---|---|
| New York, NY | 130-145 | Dallas, TX | 88-95 | |
| San Francisco, CA | 125-140 | Atlanta, GA | 90-97 | |
| Boston, MA | 115-130 | Phoenix, AZ | 88-94 | |
| Chicago, IL | 110-120 | Denver, CO | 95-105 | |
| Seattle, WA | 108-118 | Nashville, TN | 88-95 | |
| Washington, DC | 100-110 | Charlotte, NC | 85-92 | |
| Miami, FL | 92-100 | Houston, TX | 85-93 | |
| Minneapolis, MN | 105-112 | Rural areas | 70-85 |
| Dimension | Weight | Criteria |
|---|---|---|
| Scope completeness | 20 | All spec sections priced, no gaps, exclusions documented |
| Quantity accuracy | 20 | QTO verified, cross-checks pass, waste factors applied |
| Pricing basis | 15 | 3+ sub quotes per trade, current material prices, documented sources |
| Indirect costs | 10 | GCs detailed (not lump), schedule-based items tied to duration |
| Markup appropriateness | 10 | Market-competitive, risk-adjusted, contingency justified |
| Documentation | 10 | Assumptions listed, basis of estimate narrative, organized by division |
| Adjustments | 10 | Location factor applied, escalation to midpoint, seasonal factors |
| Presentation | 5 | Professional format, clear summary, alternates separated |
Grading: 90+ = Bid-ready | 75-89 = Needs refinement | 60-74 = Major gaps | <60 = Redo
| # | Mistake | Prevention |
|---|---|---|
| 1 | Missing addenda | Checklist: log every addendum, initial when incorporated |
| 2 | Incomplete sub scope | Write scope sheets with inclusions AND exclusions |
| 3 | Wrong labor rates | Verify union vs open shop, prevailing wage, location |
| 4 | No escalation | ALWAYS escalate to construction midpoint |
| 5 | Lump sum general conditions | Detail every line item tied to schedule |
| 6 | Ignoring phasing | Multi-phase = mobilize/demobilize multiple times |
| 7 | Missing temporary work | Shoring, dewatering, winter protection, dust control |
| 8 | Under-priced site conditions | Get geotech report BEFORE estimating foundations |
| 9 | Scope gaps between trades | Who installs the backing for the TV mount? |
| 10 | Not reading the fine print | Liquidated damages, retainage, payment terms |
Occupied building renovation:
Remote/rural project:
Fast-track schedule:
Public/government work:
Design-Build:
| Command | Action |
|---|---|
| "Estimate this project" | Run full estimate workflow from Phase 1 |
| "Price [division/trade]" | Develop unit costs for specific trade |
| "Check my quantities" | Run QTO verification cross-checks |
| "Value engineer [system]" | Generate VE alternatives with savings |
| "Write change order for [scope]" | Generate CO with pricing and backup |
| "Compare sub quotes for [trade]" | Score and compare subcontractor bids |
| "Monthly cost report" | Generate EVM-based cost report |
| "Bid/no-bid analysis for [project]" | Run decision scorecard |
| "Location adjust to [city]" | Apply RSMeans location factor |
| "Escalate costs to [date]" | Calculate escalation to future midpoint |
| "Review my estimate" | Run 100-point quality rubric |
| "Generate bid summary" | Format estimate for bid submission |
© LeoYeAI, MIT. Rendered from Markdown: HTML in the file is shown as text, images as links, and headings moved down two levels. Raw file
SKILL.md and 2 other files in skills/afrexai-construction-estimator of LeoYeAI/openclaw-master-skills.
Open the folder on GitHubat commit e5199b5
Afrexai Construction Estimator next to the 5 skills that share the most tags, products or categories with it. Stars are the repository's; “used in” counts other GitHub owners with a copy.
| Skill | Stars | Used in | Tokens | Auto-check | Licence | Repo updated |
|---|---|---|---|---|---|---|
| Afrexai Construction Estimator this skillLeoYeAI/openclaw-master-skills | 2.2k | — | ~6.1k | Automated safety check: Pass | MIT | |
| Doc Coauthoringaws-samples/sample-strands-agent-with-agentcore | 195 | 40 repos | ~3.2k | Automated safety check: Pass | MIT | |
| Amazon Buy Box Monitorbrowser-act/skills | 6.1k | 1 repos | ~1.6k | Automated safety check: Pass | MIT | |
| Tourmind Bookingtourmind-com/Tourmind-Booking-Skills | 1.8k | — | ~13k | Automated safety check: Pass | MIT | |
| Audit Onboarding Proposalhoangnb24/repository-harness | 1.2k | — | ~4k | Automated safety check: Pass | MIT | |
| No Negative EchoLB623/no-negative-echo | 900 | — | ~965 | Automated safety check: Pass | MIT |
aws-samples/sample-strands-agent-with-agentcore
Guide users through a structured workflow for co-authoring documentation.
browser-act/skills
Pulls Amazon product details, competing seller prices and seller ratings for a given ASIN through the BrowserAct API, without browser automation.
tourmind-com/Tourmind-Booking-Skills
MUST USE for any hotel or accommodation intent in any language, including hotel search, hotel recommendations, nearby accommodation, hostels, guesthouses, resorts, where-to-stay questions, room…
hoangnb24/repository-harness
Use only when the user explicitly invokes $audit-onboarding-proposal.
LB623/no-negative-echo
Prevent 此地无银三百两式 residue: finalize artifacts without echoing rejected session-only alternatives into labels, metadata, commits, PRs, or handoffs.
zubair-trabzada/geo-seo-claude
Builds a client-ready AI-search-optimization proposal from an existing GEO audit, with pricing tiers, an ROI estimate and a markdown document ready to send.
LeoYeAI/openclaw-master-skills
Manages pipelines on a DevOps quality and efficiency platform through its OpenAPI: list workspaces and templates, create, update, run and cancel pipelines, and read run records.
LeoYeAI/openclaw-master-skills
Patches OpenClaw's Feishu extension so an edited document triggers an isolated agent session that reads the doc and replies inline, turning it into a live chat space.
LeoYeAI/openclaw-master-skills
Multi-context memory management system for OpenClaw agents with group-isolated storage, global shared memory, workspace organization, and group-specific skills isolation.
LeoYeAI/openclaw-master-skills
Runs a brand's AI-search visibility work end to end: diagnosing how AI platforms represent it, repositioning it, producing AI-optimized content and monitoring ongoing mentions.
LeoYeAI/openclaw-master-skills
Installs and authenticates the gws CLI, then automates Gmail, Drive, Sheets, Calendar, Docs, Chat and Tasks with ready-made recipes, persona bundles and security audits.
LeoYeAI/openclaw-master-skills
Runs four advisor roles, a fitness coach, nutritionist, data analyst and TCM practitioner, to build a health profile and track workouts, diet and wellness over time.
Categories
Complete construction estimating and cost management system. Afrexai Construction Estimator is an agent skill from LeoYeAI/openclaw-master-skills. Complete construction estimating and cost management system.
Afrexai Construction Estimator fits situations like: preparing project estimates; cost breakdowns; value engineering; change order management.
Run `npx skills add LeoYeAI/openclaw-master-skills --skill afrexai-construction-estimator -a claude-code`. Or copy the skill folder (skills/afrexai-construction-estimator in LeoYeAI/openclaw-master-skills) into .claude/skills/afrexai-construction-estimator in your project. Claude Code loads it when a task matches its description.
Run `npx skills add LeoYeAI/openclaw-master-skills --skill afrexai-construction-estimator -a codex`. Or copy the skill folder (skills/afrexai-construction-estimator in LeoYeAI/openclaw-master-skills) into .agents/skills/afrexai-construction-estimator in your project. Codex loads it when a task matches its description.
Cursor, Gemini CLI, GitHub Copilot and OpenCode also load SKILL.md folders. With the skills CLI, run `npx skills add LeoYeAI/openclaw-master-skills --skill afrexai-construction-estimator -a cursor` (or -a gemini-cli, github-copilot or opencode for the others). To copy it by hand, put the folder in .cursor/skills/afrexai-construction-estimator, .gemini/skills/afrexai-construction-estimator, .github/skills/afrexai-construction-estimator and .opencode/skills/afrexai-construction-estimator in your project.
SKILL.md names no scripts, command-line tools or credentials: Afrexai Construction Estimator is instructions for the agent only.
SKILL.md contains no URLs. Any network use would come from the scripts or tools the agent runs. This is read from the text; nothing was executed.
Our automated static check of SKILL.md found no risky patterns, such as piping downloads into a shell, reading credential files or hidden Unicode. It is not a guarantee. Review the folder before installing.
Afrexai Construction Estimator is published under the MIT licence (the repository's licence). It allows redistribution, so the full SKILL.md is shown on this page.
About 6.1k tokens (SKILL.md is roughly 24k characters). Agents keep only the skill's name and description in context until a task matches; then they load SKILL.md in full.
Skills that share tags, products or a category with Afrexai Construction Estimator: Doc Coauthoring (aws-samples/sample-strands-agent-with-agentcore, 195 stars), Amazon Buy Box Monitor (browser-act/skills, 6.1k stars), Tourmind Booking (tourmind-com/Tourmind-Booking-Skills, 1.8k stars) and Audit Onboarding Proposal (hoangnb24/repository-harness, 1.2k stars). The comparison table on this page puts their stars, adoption, token cost, safety result and licence side by side.
LeoYeAI (a GitHub user) maintains it in LeoYeAI/openclaw-master-skills, which has 2,161 GitHub stars. The repository holds 1,235 skills in this directory. The repository was last updated on July 20, 2026.
Source: LeoYeAI/openclaw-master-skills on GitHub. Facts on this page come from the repository at the commit we read; the author's words are quoted as theirs.