Agent skill

Power Outage Plan

by mohitagw15856 in mohitagw15856/pm-claude-skills

Plan for an extended power outage — keeping medically-essential devices running, food safe, the home warm or cool enough, and communication alive — before the lights go out, with the special focus…

MITAuto-check passedDevOps & Cloud

Install Power Outage Plan

skills CLI
$ npx skills add mohitagw15856/pm-claude-skills --skill power-outage-plan -a claude-code

Project install by default; add -g for ~/.claude/skills/.

GitHub CLI
$ gh skill install mohitagw15856/pm-claude-skills power-outage-plan --agent claude-code

Project scope by default; add --scope user for a personal install. Needs GitHub CLI 2.90.0 or later (public preview).

Manual copy
$ git clone --depth 1 https://github.com/mohitagw15856/pm-claude-skills.git skills-src && mkdir -p .claude/skills && cp -r skills-src/skills/power-outage-plan .claude/skills/power-outage-plan && rm -rf skills-src

Use ~/.claude/skills/ instead of .claude/skills for a personal install. The folder must contain SKILL.md.

Claude Code skills documentation · loads skills from .claude/skills/

Facts

Skill name
power-outage-plan
GitHub stars
1.4k
Token cost
~1.8k tokens
SKILL.md length
795 words
Files
1
Skills in repo
1,348
Repo updated
First seen
Licence
MIT

At a glance

Plan for an extended power outage — keeping medically-essential devices running, food safe, the home warm or cool enough, and communication alive — before the lights go out, with the special focus…

  • Works in 5 steps: Medical power first — it's the emergency… → Tier the plan by duration. Hours: fridge… → Warn hard about carbon monoxide and fire… → …
  • Someone says prepare for a power outage
  • SKILL.md covers What This Skill Produces, Required Inputs, Framework and Output Format, plus 4 more sections
  • Instructions only: no scripts, shell commands, URLs or credentials in SKILL.md

What it does

Power Outage Plan is an agent skill from mohitagw15856/pm-claude-skills. Plan for an extended power outage — keeping medically-essential devices running, food safe, the home warm or cool enough, and communication alive — before the lights go out, with the special focus on power-dependent medical needs. Use when someone says 'prepare for a power outage', 'what if the power goes out for days', 'blackout plan', or 'I rely on a medical device that needs electricity'. Produces an outage plan tiered by duration, a medical-power priority plan, food/heat/cool/comms guidance, and safety…

Its SKILL.md is about 1.8k tokens, which your agent loads only when the skill is triggered. It is a single SKILL.md file with no bundled scripts.

It sits in DevOps & Cloud, covering Incident response. The repository describes itself as: 1255 professional Agent Skills for Claude, ChatGPT, Gemini, Cursor & Codex — PRDs, postmortems, leases, medical bills, layoffs, go-bags, new countries. Plain markdown, MIT, in… The licence is MIT.

When your agent uses it

  • Someone says prepare for a power outage
  • What if the power goes out for days
  • I rely on a medical device that needs electricity

Example prompts

  • “prepare for a power outage”
  • “what if the power goes out for days”
  • “blackout plan”
  • “/power-outage-plan”

Workflow steps

5 steps, taken from the first numbered list in SKILL.md.

  1. Medical power first — it's the emergency inside the emergency. For any power-
  2. Tier the plan by duration. Hours: fridge stays cold if unopened, use battery light,
  3. Warn hard about carbon monoxide and fire — the secondary killers. Generators, grills,
  4. Keep food, warmth/cool, and comms. Food: keep fridge/freezer closed, know the safe-
  5. Prepare, then know the abandon threshold. Stock the outage kit (lights, power banks,

What it can do on your machine

Read from SKILL.md and the folder at commit 1cbf1f0. It shows what the files ask for, not the result of running them.

  • Tool permissions

    Pre-approves nothing: there is no allowed-tools line, so your agent's usual permission prompts apply.

    From allowed-tools in the SKILL.md frontmatter.

  • Runs code

    No scripts in the folder and no shell commands in SKILL.md.

    From the folder's file list and the shell code blocks in SKILL.md.

  • Network

    No URLs in SKILL.md.

    From URLs in SKILL.md, links to its own repository left out.

  • Credentials

    Names no API keys, tokens, secrets or passwords.

    From names ending in _API_KEY, _TOKEN, _SECRET, _KEY or _PASSWORD in SKILL.md.

Context cost

Power Outage Plan loads about 1.8k tokens when it runs. Until then it costs about 154 tokens; SKILL.md has 795 words of instructions outside code blocks.

Always · name and description, kept in context so the agent knows when to use it
~154
When it runs · the whole SKILL.md, loaded when a task matches
~1.8k

Estimates: characters ÷ 4, the usual rule of thumb; real counts depend on the model's tokenizer. Scripts and assets cost tokens only if the agent reads them.

Safety

Auto-check passed

The automated check found no risky patterns in SKILL.md.

Automated static check — not a guarantee. Review scripts before installing. It scans the text of SKILL.md for risky patterns (piping downloads into a shell, reading credential files, hidden Unicode, destructive commands); files beside SKILL.md are not scanned.

SKILL.md

The full file from mohitagw15856/pm-claude-skills at commit 1cbf1f0, republished under its MIT licence (© mohitagw15856). 795 words, ~1,788 tokens.

Download SKILL.mdSave it as .claude/skills/power-outage-plan/SKILL.md (or your agent's skills folder).
name
power-outage-plan
description
Plan for an extended power outage — keeping medically-essential devices running, food safe, the home warm or cool enough, and communication alive — before the lights go out, with the special focus on power-dependent medical needs. Use when someone says 'prepare for a power outage', 'what if the power goes out for days', 'blackout plan', or 'I rely on a medical device that needs electricity'. Produces an outage plan tiered by duration, a medical-power priority plan, food/heat/cool/comms guidance, and safety warnings. Not medical advice; medical-device continuity routes to clinicians/utilities.

Power Outage Plan Skill

An extended outage is one of the most common and underestimated emergencies — and one of the most dangerous for a specific group: anyone who depends on electricity for a medical device (oxygen concentrator, CPAP, dialysis, refrigerated medication, powered mobility). For them a blackout isn't an inconvenience, it's a medical emergency, and the plan must center on it. For everyone, the hazards are quiet: food spoilage, carbon- monoxide poisoning from improvised heat/generators, hypothermia or heatstroke, and being cut off. This skill builds the plan before the lights go out, tiered by how long the outage lasts, with the safety warnings that prevent the outage's secondary deaths.

What This Skill Produces

  • A duration-tiered plan: what to do for a few hours vs overnight vs multi-day — because the response and the risks escalate with time
  • A medical-power priority plan (first, for anyone who needs it): battery backup, the utility's medical/priority register, backup power options, and the threshold at which you relocate to power/a hospital — worked out with clinicians and the utility in advance
  • Food, heat/cool, and comms guidance: keeping food safe (and when to throw it out), staying warm or cool safely, and keeping phones and information alive
  • The safety warnings that save lives: carbon-monoxide (never run generators/grills/ camp stoves indoors), improvised-heat fire risk, and food-safety thresholds — the secondary hazards that kill more than the outage itself

Required Inputs

Ask for (if not already provided):

  • Anyone in the home dependent on power for a medical device or refrigerated medication — this reshapes the whole plan
  • The likely outage causes and durations for the area (storms, grid strain, wildfire shutoffs — pair with [[hazard-risk-map]])
  • The home: heating/cooling type (does it need electricity?), cooking, water (well pumps fail without power), and vulnerable household members
  • Existing backup (generator, battery, none) and budget/space for more

Framework

  1. Medical power first — it's the emergency inside the emergency. For any power- dependent device or refrigerated medication: how long its battery lasts, backup power (device batteries, a suitable power station — sized with the device specs), enrolling on the utility's medical/priority-reconnection register, and the pre-decided threshold to relocate to reliable power or a hospital. This is worked out with the clinician and utility now, not improvised in the dark. The skill organizes it and routes the medical specifics to them.
  2. Tier the plan by duration. Hours: fridge stays cold if unopened, use battery light, sit tight. Overnight: heat/cool safely, meds and food managed, phones conserved. Multi-day: food-safety decisions, water if pumps fail, warmth/cooling as the priority, and the relocate-or-stay call. Each tier has different actions and different dangers.
  3. Warn hard about carbon monoxide and fire — the secondary killers. Generators, grills, and camp stoves indoors or in attached garages kill via CO every outage; never run them inside, and have a battery CO alarm. Improvised heating (ovens, unvented heaters) causes fires and CO. These warnings are not optional garnish — they're the point.
  4. Keep food, warmth/cool, and comms. Food: keep fridge/freezer closed, know the safe- duration thresholds and the "when in doubt throw it out" rule. Temperature: layer for cold, hydrate and find cooling for heat, protect the vulnerable (heat and cold kill the elderly fast). Comms: charged power banks, a battery/wind-up radio for information, knowing that mobile networks can also fail (see [[family-emergency-plan]] for the reconnect plan).
  5. Prepare, then know the abandon threshold. Stock the outage kit (lights, power banks, CO alarm, water, non-cook food, warmth), and set the clear line at which staying becomes unsafe — no heat in dangerous cold, no medical power, no water — and where you'd go. Deciding that threshold in advance prevents the fatal "we'll just wait a bit longer."
Show full SKILL.md (187 more words)Show less

Output Format

## Medical power (if anyone depends on it — do this first)
[Device battery life · backup power sized to specs · utility medical/priority register ·
the relocate-to-power/hospital threshold — worked out with clinician + utility now]

## The plan by duration
Hours: … · Overnight: … · Multi-day: …  [actions + the escalating risks]

## ⚠ The safety warnings that save lives
[CO: never run generators/grills/stoves indoors; battery CO alarm · improvised-heat fire
risk · food-safety thresholds]

## Food, warmth/cool, comms
[Food-safe durations & throw-out rule · staying warm/cool safely, protect the vulnerable ·
power banks + battery radio · networks can fail]

## Abandon threshold
[The clear line where staying is unsafe, and where you'd go]

⚠ Not medical advice. Medical-device continuity must be planned with your clinician and
utility. Follow official guidance in a real outage.

Quality Checks

  • Medical-power dependency is handled first and routed to clinician + utility, with a relocate threshold
  • The plan is tiered by outage duration with escalating actions and risks
  • The carbon-monoxide and improvised-heat warnings are prominent and unambiguous
  • Food-safety thresholds and vulnerable-person heat/cold protection are covered
  • A clear abandon threshold and destination are set in advance

Anti-Patterns

  • Do not bury or soften the CO warning — indoor generators/grills/stoves kill every outage; this is the highest-stakes line in the skill
  • Do not give medical advice or size medical backup power without the device specs and clinician — route it
  • Do not treat all outages as equal — duration changes everything
  • Do not ignore the vulnerable (elderly, infants, power-dependent) — they're who outages actually harm
  • Do not omit the abandon threshold — "waiting it out" past safety is how people die at home in cold/heat

[[hazard-risk-map]] to know your outage likelihood; [[go-bag-builder]] and [[emergency-doc-kit]] for the kit; [[family-emergency-plan]] for reconnecting when networks fail; [[after-the-disaster]] for the aftermath.

Example Trigger Phrases

  • "Prepare for a power outage."
  • "What if the power goes out for days?"
  • "I rely on a medical device that needs electricity."

© mohitagw15856, MIT. Rendered from Markdown: HTML in the file is shown as text, images as links, and headings moved down two levels. Raw file

Files

Just SKILL.md in skills/power-outage-plan of mohitagw15856/pm-claude-skills.

Open the folder on GitHubat commit 1cbf1f0

Compare with similar skills

Power Outage Plan next to the 5 skills that share the most tags, products or categories with it. Stars are the repository's; “used in” counts other GitHub owners with a copy.

Power Outage Plan compared with similar skills
SkillStarsUsed inTokensAuto-checkLicenceRepo updated
Power Outage Plan this skillmohitagw15856/pm-claude-skills1.4k—~1.8kAutomated safety check: PassMIT
Kubernetes Network Root Cause Analysiskubeshark/kubeshark12k—~5.3kAutomated safety check: PassApache-2.0
UModel Root Cause Analysisalibaba/UnifiedModel415—~1.9kAutomated safety check: PassCustom licence
Learningskortix-ai/suna20k—~1.1kAutomated safety check: PassCustom licence
Nix Config Debugryan4yin/nix-config2.1k—~1.2kAutomated safety check: PassMIT
Oncallpigweed-project/pigweed548—~963Automated safety check: PassApache-2.0

Similar skills

  • Investigates past Kubernetes incidents from Kubeshark traffic snapshots: takes captures, dissects API calls, extracts PCAPs and compares traffic over time.

    12k GitHub stars~5.3k tokensUpdated yesterday
    DevOps & CloudAuto-check passed
  • UModel Root Cause Analysis

    alibaba/UnifiedModel

    Investigates a service incident to its root cause by querying a UModel object graph alongside metrics, logs, topology and recent deployments.

    415 GitHub stars~1.9k tokensUpdated 17 days ago
    DevOps & CloudAuto-check passed
  • Learnings

    kortix-ai/suna

    The project's episodic memory: a timestamped ledger of rules paid for with real outages and near-misses, one entry per incident.

    20k GitHub stars~1.1k tokensUpdated today
    DevOps & CloudAuto-check passed
  • Nix Config Debug

    ryan4yin/nix-config

    A skill your agent uses when something here is broken or stops working: an eval or build error, a failed activation, a dead or restarting unit, a mihomo or DNS outage, an unreachable host or MicroVM…

    2.1k GitHub stars~1.2k tokensUpdated today
    DevOps & CloudAuto-check passed
  • Oncall

    pigweed-project/pigweed

    Pigweed oncall rotation runbooks and maintenance workflows (such as rolling CIPD client tools for b/315378787).

    548 GitHub stars~963 tokensUpdated today
    DevOps & CloudAuto-check passed
  • Axiom SRE Investigator

    openclaw/clawhub

    Investigates incidents and production problems with hypothesis-driven debugging, queries Axiom observability data when available, and keeps secrets out of commands and output.

    9.5k GitHub stars~7.1k tokensUpdated yesterday
    DevOps & CloudAuto-check passed

More from mohitagw15856/pm-claude-skills

All 1,348 skills in this repo
  • Car Tco

    mohitagw15856/pm-claude-skills

    Compare the total cost of car ownership across buy-new, buy-used, lease, and keep-your-current-car — depreciation, insurance, maintenance ramp, and fuel over a real horizon, not just the monthly…

    1.4k GitHub stars~1.1k tokensUpdated 2 days ago
    Auto-check passed
  • Cs Health Scorecard

    mohitagw15856/pm-claude-skills

    Build a customer health scorecard for a specific account. An agent skill from mohitagw15856/pm-claude-skills.

    1.4k GitHub stars~2.4k tokensUpdated 2 days ago
    Auto-check passed
  • Exit Waterfall

    mohitagw15856/pm-claude-skills

    Compute who gets what at each exit price from a cap table — liquidation preferences, conversion points, and where the founders' share collapses.

    1.4k GitHub stars~1.1k tokensUpdated 2 days ago
    Auto-check passed
  • Feature Prioritisation

    mohitagw15856/pm-claude-skills

    Apply prioritisation frameworks (RICE, MoSCoW, Kano, ICE, Opportunity Scoring) to rank features and backlog items.

    1.4k GitHub stars~2k tokensUpdated 2 days ago
    Auto-check passed
  • Fire Number

    mohitagw15856/pm-claude-skills

    Compute a financial-independence (FIRE) target and years-to-reach with every assumption labeled as an assumption — plus a sensitivity table instead of a single false-precision answer.

    1.4k GitHub stars~1.1k tokensUpdated 2 days ago
    Auto-check passed
  • Freelance Rate

    mohitagw15856/pm-claude-skills

    Derive a freelance day/hourly rate backwards from target income, honest billable utilization, overhead, and the self-employment tax premium — the arithmetic that proves a rate is not salary÷2000.

    1.4k GitHub stars~1.2k tokensUpdated 2 days ago
    Auto-check passed

Categories

Questions about Power Outage Plan

What does Power Outage Plan do?

Plan for an extended power outage — keeping medically-essential devices running, food safe, the home warm or cool enough, and communication alive — before the lights go out, with the special focus…. Power Outage Plan is an agent skill from mohitagw15856/pm-claude-skills. Plan for an extended power outage — keeping medically-essential devices running, food safe, the home warm or cool enough, and communication alive — before the lights go out, with the special focus on power-dependent medical needs.

When should I use Power Outage Plan?

Power Outage Plan fits situations like: someone says prepare for a power outage; what if the power goes out for days; I rely on a medical device that needs electricity.

How do I install Power Outage Plan in Claude Code?

Run `npx skills add mohitagw15856/pm-claude-skills --skill power-outage-plan -a claude-code`. Or copy the skill folder (skills/power-outage-plan in mohitagw15856/pm-claude-skills) into .claude/skills/power-outage-plan in your project. Claude Code loads it when a task matches its description.

How do I install Power Outage Plan in Codex?

Run `npx skills add mohitagw15856/pm-claude-skills --skill power-outage-plan -a codex`. Or copy the skill folder (skills/power-outage-plan in mohitagw15856/pm-claude-skills) into .agents/skills/power-outage-plan in your project. Codex loads it when a task matches its description.

Can I use Power Outage Plan in Cursor, Gemini CLI or GitHub Copilot?

Cursor, Gemini CLI, GitHub Copilot and OpenCode also load SKILL.md folders. With the skills CLI, run `npx skills add mohitagw15856/pm-claude-skills --skill power-outage-plan -a cursor` (or -a gemini-cli, github-copilot or opencode for the others). To copy it by hand, put the folder in .cursor/skills/power-outage-plan, .gemini/skills/power-outage-plan, .github/skills/power-outage-plan and .opencode/skills/power-outage-plan in your project.

What does Power Outage Plan need to run?

SKILL.md names no scripts, command-line tools or credentials: Power Outage Plan is instructions for the agent only.

Does Power Outage Plan access the network?

SKILL.md contains no URLs. Any network use would come from the scripts or tools the agent runs. This is read from the text; nothing was executed.

Is Power Outage Plan safe to install?

Our automated static check of SKILL.md found no risky patterns, such as piping downloads into a shell, reading credential files or hidden Unicode. It is not a guarantee. Review the folder before installing.

What licence does Power Outage Plan use?

Power Outage Plan is published under the MIT licence (the repository's licence). It allows redistribution, so the full SKILL.md is shown on this page.

How many tokens does Power Outage Plan use?

About 1.8k tokens (SKILL.md is roughly 7.2k characters). Agents keep only the skill's name and description in context until a task matches; then they load SKILL.md in full.

What are the alternatives to Power Outage Plan?

Skills that share tags, products or a category with Power Outage Plan: Kubernetes Network Root Cause Analysis (kubeshark/kubeshark, 12k stars), UModel Root Cause Analysis (alibaba/UnifiedModel, 415 stars), Learnings (kortix-ai/suna, 20k stars) and Nix Config Debug (ryan4yin/nix-config, 2.1k stars). The comparison table on this page puts their stars, adoption, token cost, safety result and licence side by side.

Who maintains Power Outage Plan?

mohitagw15856 (a GitHub user) maintains it in mohitagw15856/pm-claude-skills, which has 1,434 GitHub stars. The repository holds 1,348 skills in this directory. The repository was last updated on October 9, 2026.

Source: mohitagw15856/pm-claude-skills on GitHub. Facts on this page come from the repository at the commit we read; the author's words are quoted as theirs.