Generate a structured daily site progress report from unstructured input such as voice transcription, rough notes, or conversational messages.
$ npx skills add LeoYeAI/openclaw-master-skills --skill construction-daily-report -a claude-codeProject install by default; add -g for ~/.claude/skills/.
$ gh skill install LeoYeAI/openclaw-master-skills construction-daily-report --agent claude-codeProject scope by default; add --scope user for a personal install. Needs GitHub CLI 2.90.0 or later (public preview).
$ git clone --depth 1 https://github.com/LeoYeAI/openclaw-master-skills.git skills-src && mkdir -p .claude/skills && cp -r skills-src/skills/construction-daily-report .claude/skills/construction-daily-report && rm -rf skills-srcUse ~/.claude/skills/ instead of .claude/skills for a personal install. The folder must contain SKILL.md.
Claude Code skills documentation · loads skills from .claude/skills/
Install the "construction-daily-report" agent skill from https://github.com/LeoYeAI/openclaw-master-skills/tree/main/skills/construction-daily-report into .claude/skills/construction-daily-report/ in this project. Copy the whole folder (SKILL.md and every file beside it), keep the folder name "construction-daily-report", then confirm the skill loads.Claude Code copies the folder itself, the same result as the manual copy. Check what it changed before you commit it.
$skill-installer install https://github.com/LeoYeAI/openclaw-master-skills/tree/main/skills/construction-daily-reportType this inside Codex. $skill-installer <name> installs a curated skill from openai/skills. The installer writes to $CODEX_HOME/skills (default ~/.codex/skills). Restart Codex if the skill does not show up.
$ npx skills add LeoYeAI/openclaw-master-skills --skill construction-daily-report -a codexProject install goes to .agents/skills/; add -g for ~/.codex/skills/.
$ gh skill install LeoYeAI/openclaw-master-skills construction-daily-report --agent codexProject scope by default (.agents/skills/); add --scope user for a personal install.
$ git clone --depth 1 https://github.com/LeoYeAI/openclaw-master-skills.git skills-src && mkdir -p .agents/skills && cp -r skills-src/skills/construction-daily-report .agents/skills/construction-daily-report && rm -rf skills-srcUse ~/.agents/skills/ instead of .agents/skills for a personal install.
Codex skills documentation · loads skills from .agents/skills/
Install the "construction-daily-report" agent skill from https://github.com/LeoYeAI/openclaw-master-skills/tree/main/skills/construction-daily-report into .agents/skills/construction-daily-report/ in this project. Copy the whole folder (SKILL.md and every file beside it), keep the folder name "construction-daily-report", then confirm the skill loads.Codex copies the folder itself, the same result as the manual copy. Check what it changed before you commit it.
$ npx skills add LeoYeAI/openclaw-master-skills --skill construction-daily-report -a cursorProject install goes to .agents/skills/; add -g for ~/.cursor/skills/.
$ gh skill install LeoYeAI/openclaw-master-skills construction-daily-report --agent cursorProject scope by default (.agents/skills/); add --scope user for a personal install.
$ git clone --depth 1 https://github.com/LeoYeAI/openclaw-master-skills.git skills-src && mkdir -p .cursor/skills && cp -r skills-src/skills/construction-daily-report .cursor/skills/construction-daily-report && rm -rf skills-srcUse ~/.cursor/skills/ instead of .cursor/skills for a personal install.
Cursor skills documentation · loads skills from .cursor/skills/, .agents/skills/, .claude/skills/, .codex/skills/
Install the "construction-daily-report" agent skill from https://github.com/LeoYeAI/openclaw-master-skills/tree/main/skills/construction-daily-report into .cursor/skills/construction-daily-report/ in this project. Copy the whole folder (SKILL.md and every file beside it), keep the folder name "construction-daily-report", then confirm the skill loads.Cursor copies the folder itself, the same result as the manual copy. Check what it changed before you commit it.
$ gemini skills install https://github.com/LeoYeAI/openclaw-master-skills.git --path skills/construction-daily-report--scope user (default) or --scope workspace; --path is the subfolder of the repo that holds the skill; --consent skips the security confirmation prompt.
$ npx skills add LeoYeAI/openclaw-master-skills --skill construction-daily-report -a gemini-cliProject install goes to .agents/skills/; add -g for ~/.gemini/skills/.
$ gh skill install LeoYeAI/openclaw-master-skills construction-daily-report --agent gemini-cliProject scope by default (.agents/skills/); add --scope user for a personal install.
$ git clone --depth 1 https://github.com/LeoYeAI/openclaw-master-skills.git skills-src && mkdir -p .gemini/skills && cp -r skills-src/skills/construction-daily-report .gemini/skills/construction-daily-report && rm -rf skills-srcUse ~/.gemini/skills/ instead of .gemini/skills for a personal install, then run /skills reload.
Gemini CLI skills documentation · loads skills from .gemini/skills/, .agents/skills/
Install the "construction-daily-report" agent skill from https://github.com/LeoYeAI/openclaw-master-skills/tree/main/skills/construction-daily-report into .gemini/skills/construction-daily-report/ in this project. Copy the whole folder (SKILL.md and every file beside it), keep the folder name "construction-daily-report", then confirm the skill loads.Gemini CLI copies the folder itself, the same result as the manual copy. Check what it changed before you commit it.
$ gh skill install LeoYeAI/openclaw-master-skills construction-daily-reportInstalls for Copilot at project scope by default; add --scope user for a personal install. Preview a skill first with gh skill preview. Needs GitHub CLI 2.90.0 or later (public preview).
$ npx skills add LeoYeAI/openclaw-master-skills --skill construction-daily-report -a github-copilotProject install goes to .agents/skills/; add -g for ~/.copilot/skills/.
$ git clone --depth 1 https://github.com/LeoYeAI/openclaw-master-skills.git skills-src && mkdir -p .github/skills && cp -r skills-src/skills/construction-daily-report .github/skills/construction-daily-report && rm -rf skills-srcUse ~/.copilot/skills/ instead of .github/skills for a personal install. Commit .github/skills so cloud agent and code review can use it.
GitHub Copilot skills documentation · loads skills from .github/skills/, .claude/skills/, .agents/skills/
Install the "construction-daily-report" agent skill from https://github.com/LeoYeAI/openclaw-master-skills/tree/main/skills/construction-daily-report into .github/skills/construction-daily-report/ in this project. Copy the whole folder (SKILL.md and every file beside it), keep the folder name "construction-daily-report", then confirm the skill loads.GitHub Copilot copies the folder itself, the same result as the manual copy. Check what it changed before you commit it.
$ npx skills add LeoYeAI/openclaw-master-skills --skill construction-daily-report -a opencodeOpenCode documents no install command of its own. Project install goes to .agents/skills/; add -g for ~/.config/opencode/skills/.
$ gh skill install LeoYeAI/openclaw-master-skills construction-daily-report --agent opencodeProject scope by default (.agents/skills/); add --scope user for a personal install.
$ git clone --depth 1 https://github.com/LeoYeAI/openclaw-master-skills.git skills-src && mkdir -p .opencode/skills && cp -r skills-src/skills/construction-daily-report .opencode/skills/construction-daily-report && rm -rf skills-srcUse ~/.config/opencode/skills/ instead of .opencode/skills for a personal install.
OpenCode skills documentation · loads skills from .opencode/skills/, .claude/skills/, .agents/skills/
Install the "construction-daily-report" agent skill from https://github.com/LeoYeAI/openclaw-master-skills/tree/main/skills/construction-daily-report into .opencode/skills/construction-daily-report/ in this project. Copy the whole folder (SKILL.md and every file beside it), keep the folder name "construction-daily-report", then confirm the skill loads.OpenCode copies the folder itself, the same result as the manual copy. Check what it changed before you commit it.
construction-daily-reportGenerate a structured daily site progress report from unstructured input such as voice transcription, rough notes, or conversational messages.
Construction Daily Report is an agent skill from LeoYeAI/openclaw-master-skills. Generate a structured daily site progress report from unstructured input such as voice transcription, rough notes, or conversational messages.
Its SKILL.md is about 4.8k tokens, which your agent loads only when the skill is triggered. The skill folder holds 1 other file (for example `_meta.json`).
It sits in Media & Creative, covering Transcription. The repository describes itself as: 🧠 Curated collection of 1209+ best OpenClaw skills — weekly updated by MyClaw.ai. The licence is MIT.
5 steps, taken from the step headings in SKILL.md.
Read from SKILL.md and the folder at commit e5199b5. It shows what the files ask for, not the result of running them.
Pre-approves nothing: there is no allowed-tools line, so your agent's usual permission prompts apply.
From allowed-tools in the SKILL.md frontmatter.
No scripts in the folder and no shell commands in SKILL.md.
From the folder's file list and the shell code blocks in SKILL.md.
No URLs in SKILL.md.
From URLs in SKILL.md, links to its own repository left out.
Names no API keys, tokens, secrets or passwords.
From names ending in _API_KEY, _TOKEN, _SECRET, _KEY or _PASSWORD in SKILL.md.
Construction Daily Report loads about 4.8k tokens when it runs. Until then it costs about 42 tokens; SKILL.md has 1,362 words of instructions outside code blocks.
Estimates: characters ÷ 4, the usual rule of thumb; real counts depend on the model's tokenizer. Scripts and assets cost tokens only if the agent reads them.
The automated check found no risky patterns in SKILL.md.
Automated static check — not a guarantee. Review scripts before installing. It scans the text of SKILL.md for risky patterns (piping downloads into a shell, reading credential files, hidden Unicode, destructive commands); files beside SKILL.md are not scanned.
The full file from LeoYeAI/openclaw-master-skills at commit e5199b5, republished under its MIT licence (© LeoYeAI). 1,362 words, ~4,760 tokens.
.claude/skills/construction-daily-report/SKILL.md (or your agent's skills folder). This skill also uses 1 other file; get the full folder from GitHub.This skill helps site engineers generate a professional, structured daily site progress report from unstructured input — voice transcriptions, rough notes, WhatsApp messages, or conversational descriptions of the day's work. The agent organises messy field input into a clean, filing-ready report that meets construction documentation standards.
Activate this skill when:
Do NOT activate for weekly or monthly progress reports — use the construction-progress-report skill instead.
You are a site reporting assistant for construction projects. Your job is to take messy, informal input from a site engineer and produce a clean, professional Daily Site Progress Report. Follow these steps exactly:
When the user sends you notes, a voice transcription, or a conversational message about the day's work:
Every Daily Site Progress Report MUST contain the following sections, in this order:
Section 1: Report Header
Section 2: Workforce Summary
Section 3: Plant and Equipment on Site
Section 4: Work Completed Today
Section 5: Work Planned for Tomorrow
Section 6: Materials Received on Site
Section 7: Materials Used Today
Section 8: Delays and Disruptions
Section 9: Instructions Received
Section 10: Safety Observations
Section 11: Visitors to Site
Section 12: Photographs
Section 13: Additional Remarks
After organising the available data, you MUST ask follow-up questions for any of these critical sections that are missing:
For non-critical sections (visitors, photos, additional remarks), do NOT ask — simply leave them blank or write "None reported."
NEVER skip the follow-up questions for critical sections. A report missing weather or workforce data is incomplete and unacceptable for filing.
Once you have all critical data, produce the report in the Output Format below. Use professional, clear language. Convert informal descriptions into structured, third-person professional prose.
For example:
After generating the report, ALWAYS ask: "Does this look accurate? Any corrections or additions before I finalise?"
The agent must understand and correctly use these construction-specific terms and abbreviations:
| Abbreviation | Full Term |
|---|---|
| RFI | Request for Information — a formal query from the contractor to the engineer/architect |
| TQ | Technical Query — similar to RFI, used for design clarifications |
| TBT | Toolbox Talk — a short safety briefing given to workers before work starts |
| NCR | Non-Conformance Report — a formal notice that work does not meet specifications |
| ITR | Inspection and Test Request — a formal request for inspection at a milestone |
| ITP | Inspection and Test Plan — the master plan defining all inspection hold/witness points |
| SI | Site Instruction — a formal instruction issued on site by the client's representative |
| VO | Variation Order — a formal change to the contract scope or design |
| BOQ | Bill of Quantities — the priced list of all work items in a contract |
| IPC | Interim Payment Certificate — the monthly payment certification |
| O&M | Operating and Maintenance Manual |
| QA/QC | Quality Assurance / Quality Control |
| HSE | Health, Safety and Environment |
| PPE | Personal Protective Equipment (hard hat, safety boots, high-vis vest, gloves, goggles) |
| GRN | Goods Received Note — document confirming receipt of materials |
| LPO | Local Purchase Order |
| PM | Project Manager |
| SE | Site Engineer |
| QS | Quantity Surveyor |
| RE | Resident Engineer (client's site representative) |
| m³ | Cubic metres (concrete, excavation volumes) |
| m² | Square metres (formwork, tiling, plastering areas) |
| LM | Linear metres (piping, cables, kerbs) |
| Nr | Number (count of items, e.g., "12 Nr piles") |
═══════════════════════════════════════════════════════
DAILY SITE PROGRESS REPORT
═══════════════════════════════════════════════════════
Project: [Project Name]
Report Date: [DD/MM/YYYY]
Report No: [Sequential Number or ___]
Prepared By: [Name, Role]
Weather: [Clear / Overcast / Rain / Storm / Hot-Sunny / Windy / Fog]
───────────────────────────────────────────────────────
1. WORKFORCE SUMMARY
───────────────────────────────────────────────────────
Total On Site: [Number]
| Category / Trade | Company/Subcontractor | Count |
|------------------------|----------------------|-------|
| [e.g., Steel Fixers] | [Company name] | [No.] |
| ... | ... | ... |
───────────────────────────────────────────────────────
2. PLANT & EQUIPMENT ON SITE
───────────────────────────────────────────────────────
| Equipment | Status | Notes |
|------------------------|---------------------|-------|
| [e.g., Tower Crane] | Operational | |
| ... | ... | ... |
───────────────────────────────────────────────────────
3. WORK COMPLETED TODAY
───────────────────────────────────────────────────────
[Location/Zone]: [Description of activity with quantities]
[Location/Zone]: [Description of activity with quantities]
───────────────────────────────────────────────────────
4. WORK PLANNED FOR TOMORROW
───────────────────────────────────────────────────────
- [Activity 1]
- [Activity 2]
───────────────────────────────────────────────────────
5. MATERIALS RECEIVED
───────────────────────────────────────────────────────
| Material | Qty | Supplier | DN No. | Condition |
|-------------|------|----------------|---------|-----------|
| ... | ... | ... | ... | ... |
───────────────────────────────────────────────────────
6. MATERIALS USED
───────────────────────────────────────────────────────
| Material | Qty | Activity/Location |
|-------------|------|-------------------------------|
| ... | ... | ... |
───────────────────────────────────────────────────────
7. DELAYS & DISRUPTIONS
───────────────────────────────────────────────────────
| Delay Description | Cause | Duration | Impact |
|-------------------|-------------|----------|-----------|
| ... | ... | ... | ... |
(If none: "No delays reported.")
───────────────────────────────────────────────────────
8. INSTRUCTIONS RECEIVED
───────────────────────────────────────────────────────
| Ref No. | From | Instruction Summary | Action Required |
|---------|-------------|------------------------|----------------|
| ... | ... | ... | ... |
(If none: "No instructions received.")
───────────────────────────────────────────────────────
9. SAFETY OBSERVATIONS
───────────────────────────────────────────────────────
TBT Conducted: [Yes/No] — Topic: [Topic], Attendance: [Number]
Incidents: [None / Description]
Near Misses: [None / Description]
PPE Compliance: [Satisfactory / Issues noted: ...]
Housekeeping: [Satisfactory / Issues noted: ...]
───────────────────────────────────────────────────────
10. VISITORS TO SITE
───────────────────────────────────────────────────────
| Name | Organisation | Purpose of Visit |
|---------------|----------------|-----------------|
| ... | ... | ... |
(If none: "No visitors.")
───────────────────────────────────────────────────────
11. PHOTOGRAPHS
───────────────────────────────────────────────────────
[Photo references with classification: Progress / Defect / Safety / General]
───────────────────────────────────────────────────────
12. ADDITIONAL REMARKS
───────────────────────────────────────────────────────
[Any other noteworthy items, or "None."]
───────────────────────────────────────────────────────
Prepared By: ___________________ Date: ___________
Reviewed By: ___________________ Date: ___________
═══════════════════════════════════════════════════════Before finalising the report, the agent MUST check:
User Input (voice transcription):
ok so today was pretty busy on site. weather was fine mostly sunny. we had about 45 guys total, 12 from jemson steel fixers, 8 carpenters from our guys, 15 labourers and the rest were plumber and electrician from MET services. the crane was running all day lifting rebar to second floor. we finished the ground floor slab at block B, poured about 22 cubes of grade 30. also the steel guys started tying rebar on block A first floor columns. oh and we got 3 trucks of sharp sand from dangote, about 30 tons total. tomorrow we continue block A columns and start formwork on block B first floor. no delays today. TBT was about working at heights, 38 people attended. one of the labourers wasn't wearing his hard hat, supervisor sorted it out. the clients engineer came by around 11, Mr Okonkwo from Peniel Consulting, just a routine check. thats about itAgent Response:
Got it — let me organise your daily report.
I have most of what I need. Just a couple of quick follow-ups:
(User replies: "It's the Lekki Phase 2 Housing project. My name is Engr. Adamu.")
Here's your report:
═══════════════════════════════════════════════════════
DAILY SITE PROGRESS REPORT
═══════════════════════════════════════════════════════
Project: Lekki Phase 2 Housing
Report Date: 22/03/2026
Report No: ___
Prepared By: Engr. Adamu, Site Engineer
Weather: Hot/Sunny
───────────────────────────────────────────────────────
1. WORKFORCE SUMMARY
───────────────────────────────────────────────────────
Total On Site: 45
| Category / Trade | Company/Subcontractor | Count |
|------------------------|----------------------|-------|
| Steel Fixers | Jemson Steelworks | 12 |
| Carpenters | Direct Labour | 8 |
| Labourers | Direct Labour | 15 |
| Plumbers & Electricians| MET Services | 10 |
───────────────────────────────────────────────────────
2. PLANT & EQUIPMENT ON SITE
───────────────────────────────────────────────────────
| Equipment | Status | Notes |
|------------------------|---------------------|------------------------------|
| Tower Crane | Operational | Lifting rebar to 2nd Floor |
───────────────────────────────────────────────────────
3. WORK COMPLETED TODAY
───────────────────────────────────────────────────────
Block B — Ground Floor: Concrete pour completed. Approximately 22m³ of Grade 30 concrete placed for Ground Floor slab.
Block A — First Floor: Steel fixing commenced on First Floor columns. Reinforcement tying in progress.
───────────────────────────────────────────────────────
4. WORK PLANNED FOR TOMORROW
───────────────────────────────────────────────────────
- Block A: Continue reinforcement tying on First Floor columns
- Block B: Commence formwork erection for First Floor slab
───────────────────────────────────────────────────────
5. MATERIALS RECEIVED
───────────────────────────────────────────────────────
| Material | Qty | Supplier | DN No. | Condition |
|-------------|----------|-----------|--------|--------------|
| Sharp Sand | 30 tons | Dangote | — | Good |
───────────────────────────────────────────────────────
6. MATERIALS USED
───────────────────────────────────────────────────────
| Material | Qty | Activity/Location |
|----------------|-------|----------------------------------|
| Grade 30 Conc. | 22m³ | Block B Ground Floor slab pour |
───────────────────────────────────────────────────────
7. DELAYS & DISRUPTIONS
───────────────────────────────────────────────────────
No delays reported.
───────────────────────────────────────────────────────
8. INSTRUCTIONS RECEIVED
───────────────────────────────────────────────────────
No instructions received.
───────────────────────────────────────────────────────
9. SAFETY OBSERVATIONS
───────────────────────────────────────────────────────
TBT Conducted: Yes — Topic: Working at Heights, Attendance: 38
Incidents: None
Near Misses: None
PPE Compliance: One labourer observed without hard hat — corrected immediately by supervisor.
Housekeeping: Satisfactory
───────────────────────────────────────────────────────
10. VISITORS TO SITE
───────────────────────────────────────────────────────
| Name | Organisation | Purpose of Visit |
|-------------------|--------------------|--------------------|
| Mr. Okonkwo | Peniel Consulting | Routine site visit |
───────────────────────────────────────────────────────
11. PHOTOGRAPHS
───────────────────────────────────────────────────────
None referenced.
───────────────────────────────────────────────────────
12. ADDITIONAL REMARKS
───────────────────────────────────────────────────────
None.
───────────────────────────────────────────────────────
Prepared By: ___________________ Date: ___________
Reviewed By: ___________________ Date: ___________
═══════════════════════════════════════════════════════Does this look accurate? Any corrections or additions before I finalise?
This skill is published by ERTRS — the construction intelligence platform. For automated reporting, project tracking, and commercial management, visit ertrs.com
© LeoYeAI, MIT. Rendered from Markdown: HTML in the file is shown as text, images as links, and headings moved down two levels. Raw file
SKILL.md and 1 other file in skills/construction-daily-report of LeoYeAI/openclaw-master-skills.
Open the folder on GitHubat commit e5199b5
Construction Daily Report next to the 5 skills that share the most tags, products or categories with it. Stars are the repository's; “used in” counts other GitHub owners with a copy.
| Skill | Stars | Used in | Tokens | Auto-check | Licence | Repo updated |
|---|---|---|---|---|---|---|
| Construction Daily Report this skillLeoYeAI/openclaw-master-skills | 2.2k | — | ~4.8k | Automated safety check: Pass | MIT | |
| HyperFrames Media Useheygen-com/hyperframes | 60k | — | ~2.4k | Automated safety check: Pass | Apache-2.0 | |
| Native Subtitle Quote Imagechengyi-ai/native-subtitle-quote-image | 2.6k | — | ~1.8k | Automated safety check: Pass | MIT | |
| Edu Chem Videowy51ai/edulab | 1.4k | — | ~2.1k | Automated safety check: Notes | Apache-2.0 | |
| Transcription Memory ReconstructionNxcoreAI/EverRoom | 3k | — | ~714 | Automated safety check: Pass | Custom licence | |
| Edu Math Videowy51ai/edulab | 1.4k | — | ~2.5k | Automated safety check: Notes | Apache-2.0 |
heygen-com/hyperframes
Finds, generates and edits media for HyperFrames video projects: music, sound effects, images, icons, logos, voiceovers, captions and color grades.
chengyi-ai/native-subtitle-quote-image
将本地视频或用户有权处理的在线视频,经过来源获取、文字稿定位、选题选句、精确取帧、紧凑裁切、拼图和逐张质检,制作成 3:4 或保留画面原比例的视频字幕长图。支持两种明确分开的输出:保留画面内已烧录字幕的原生字幕模式,以及把已审核的时间点与台词绘制到真实视频帧上的脚本字幕模式。用户要求原生字幕截图、字幕帧拼图、YouTube…
wy51ai/edulab
A skill your agent uses when asked to make an explainer / walkthrough video (讲解视频、解题视频、例题精讲、微课) for a chemistry problem (化学题: 氧化还原配平 双线桥 电子守恒, 物质的量计算, 化学平衡 三段式 平衡常数 转化率 反应速率, 离子反应, 电化学, 溶液 滴定…
NxcoreAI/EverRoom
Reconstruct a complete, searchable memory from an untrusted meeting or conversation transcript.
wy51ai/edulab
A skill your agent uses when asked to make an explainer / walkthrough video (讲解视频、解题视频、例题精讲、微课) for a math problem (数学题, geometry, algebra, functions, motion/行程 problems), from a problem screenshot…
JetBrains/skills
Transcribe audio files to text with optional diarization and known-speaker hints.
LeoYeAI/openclaw-master-skills
Manages pipelines on a DevOps quality and efficiency platform through its OpenAPI: list workspaces and templates, create, update, run and cancel pipelines, and read run records.
LeoYeAI/openclaw-master-skills
Patches OpenClaw's Feishu extension so an edited document triggers an isolated agent session that reads the doc and replies inline, turning it into a live chat space.
LeoYeAI/openclaw-master-skills
Multi-context memory management system for OpenClaw agents with group-isolated storage, global shared memory, workspace organization, and group-specific skills isolation.
LeoYeAI/openclaw-master-skills
Runs a brand's AI-search visibility work end to end: diagnosing how AI platforms represent it, repositioning it, producing AI-optimized content and monitoring ongoing mentions.
LeoYeAI/openclaw-master-skills
Installs and authenticates the gws CLI, then automates Gmail, Drive, Sheets, Calendar, Docs, Chat and Tasks with ready-made recipes, persona bundles and security audits.
LeoYeAI/openclaw-master-skills
Runs four advisor roles, a fitness coach, nutritionist, data analyst and TCM practitioner, to build a health profile and track workouts, diet and wellness over time.
Categories
Generate a structured daily site progress report from unstructured input such as voice transcription, rough notes, or conversational messages. Construction Daily Report is an agent skill from LeoYeAI/openclaw-master-skills. Generate a structured daily site progress report from unstructured input such as voice transcription, rough notes, or conversational messages.
Construction Daily Report fits situations like: tasks that involve Transcription.
Run `npx skills add LeoYeAI/openclaw-master-skills --skill construction-daily-report -a claude-code`. Or copy the skill folder (skills/construction-daily-report in LeoYeAI/openclaw-master-skills) into .claude/skills/construction-daily-report in your project. Claude Code loads it when a task matches its description.
Run `npx skills add LeoYeAI/openclaw-master-skills --skill construction-daily-report -a codex`. Or copy the skill folder (skills/construction-daily-report in LeoYeAI/openclaw-master-skills) into .agents/skills/construction-daily-report in your project. Codex loads it when a task matches its description.
Cursor, Gemini CLI, GitHub Copilot and OpenCode also load SKILL.md folders. With the skills CLI, run `npx skills add LeoYeAI/openclaw-master-skills --skill construction-daily-report -a cursor` (or -a gemini-cli, github-copilot or opencode for the others). To copy it by hand, put the folder in .cursor/skills/construction-daily-report, .gemini/skills/construction-daily-report, .github/skills/construction-daily-report and .opencode/skills/construction-daily-report in your project.
SKILL.md names no scripts, command-line tools or credentials: Construction Daily Report is instructions for the agent only.
SKILL.md contains no URLs. Any network use would come from the scripts or tools the agent runs. This is read from the text; nothing was executed.
Our automated static check of SKILL.md found no risky patterns, such as piping downloads into a shell, reading credential files or hidden Unicode. It is not a guarantee. Review the folder before installing.
Construction Daily Report is published under the MIT licence (the repository's licence). It allows redistribution, so the full SKILL.md is shown on this page.
About 4.8k tokens (SKILL.md is roughly 19k characters). Agents keep only the skill's name and description in context until a task matches; then they load SKILL.md in full.
Skills that share tags, products or a category with Construction Daily Report: HyperFrames Media Use (heygen-com/hyperframes, 60k stars), Native Subtitle Quote Image (chengyi-ai/native-subtitle-quote-image, 2.6k stars), Edu Chem Video (wy51ai/edulab, 1.4k stars) and Transcription Memory Reconstruction (NxcoreAI/EverRoom, 3k stars). The comparison table on this page puts their stars, adoption, token cost, safety result and licence side by side.
LeoYeAI (a GitHub user) maintains it in LeoYeAI/openclaw-master-skills, which has 2,161 GitHub stars. The repository holds 1,235 skills in this directory. The repository was last updated on July 20, 2026.
Source: LeoYeAI/openclaw-master-skills on GitHub. Facts on this page come from the repository at the commit we read; the author's words are quoted as theirs.