Ceos Quarterly Planning

by bradfeld in bradfeld/ceos

A skill your agent uses when conducting or reviewing a quarterly planning session for the leadership team

MITAuto-check passedProduct & Project Management

Install Ceos Quarterly Planning

skills CLI
$ npx skills add bradfeld/ceos --skill ceos-quarterly-planning -a claude-code

Project install by default; add -g for ~/.claude/skills/.

GitHub CLI
$ gh skill install bradfeld/ceos ceos-quarterly-planning --agent claude-code

Project scope by default; add --scope user for a personal install. Needs GitHub CLI 2.90.0 or later (public preview).

Manual copy
$ git clone --depth 1 https://github.com/bradfeld/ceos.git skills-src && mkdir -p .claude/skills && cp -r skills-src/skills/ceos-quarterly-planning .claude/skills/ceos-quarterly-planning && rm -rf skills-src

Use ~/.claude/skills/ instead of .claude/skills for a personal install. The folder must contain SKILL.md.

Claude Code skills documentation · loads skills from .claude/skills/

Facts

Skill name
ceos-quarterly-planning
GitHub stars
156
Token cost
~5.8k tokens
SKILL.md length
2,652 words
Files
1
Skills in repo
23
Repo updated
First seen
Licence
MIT

At a glance

A skill your agent uses when conducting or reviewing a quarterly planning session for the leadership team

  • Works in 12 steps: Setup → Section 1 — Score Outgoing Rocks → Section 2 — Scorecard Review → …
  • Reviewing a quarterly planning session for the leadership team
  • SKILL.md covers When to Use, Context, Process and Output Format, plus 2 more sections
  • Calls git

What it does

Ceos Quarterly Planning is an agent skill from bradfeld/ceos. Use when conducting or reviewing a quarterly planning session for the leadership team

Its SKILL.md is about 5.8k tokens, which your agent loads only when the skill is triggered. It is a single SKILL.md file with no bundled scripts.

It sits in Product & Project Management, covering Product roadmapping. The repository describes itself as: EOS (Entrepreneurial Operating System) skills for Claude Code. Run your business on EOS with AI. The licence is MIT.

When your agent uses it

  • Reviewing a quarterly planning session for the leadership team
  • Tasks that involve Product roadmapping

Example prompts

  • “/ceos-quarterly-planning”

Workflow steps

12 steps, taken from the step headings in SKILL.md.

  1. Setup
  2. Section 1 — Score Outgoing Rocks
  3. Section 2 — Scorecard Review
  4. Section 3 — V/TO Check
  5. Section 4 — IDS
  6. Section 5 — Set Next Quarter Rocks
  7. Section 6 — Conclude
  8. Save the Planning File
  9. Determine the Quarter
  10. Load and Score Rock Data
  11. Scorecard Trends
  12. Issues Summary

What it can do on your machine

Read from SKILL.md and the folder at commit bdd5f01. It shows what the files ask for, not the result of running them.

  • Tool permissions

    Pre-approves nothing: there is no allowed-tools line, so your agent's usual permission prompts apply.

    From allowed-tools in the SKILL.md frontmatter.

  • Runs code

    Shell commands in SKILL.md call:

    • git

    From the folder's file list and the shell code blocks in SKILL.md.

  • Network

    No URLs in SKILL.md. Its commands use git, which can reach the network depending on how they are called.

    From URLs in SKILL.md, links to its own repository left out.

  • Credentials

    Names no API keys, tokens, secrets or passwords.

    From names ending in _API_KEY, _TOKEN, _SECRET, _KEY or _PASSWORD in SKILL.md.

Context cost

Ceos Quarterly Planning loads about 5.8k tokens when it runs. Until then it costs about 27 tokens; SKILL.md has 2,652 words of instructions outside code blocks.

Always · name and description, kept in context so the agent knows when to use it
~27
When it runs · the whole SKILL.md, loaded when a task matches
~5.8k

Estimates: characters ÷ 4, the usual rule of thumb; real counts depend on the model's tokenizer. Scripts and assets cost tokens only if the agent reads them.

Safety

Auto-check passed

The automated check found no risky patterns in SKILL.md.

Automated static check — not a guarantee. Review scripts before installing. It scans the text of SKILL.md for risky patterns (piping downloads into a shell, reading credential files, hidden Unicode, destructive commands); files beside SKILL.md are not scanned.

SKILL.md

The full file from bradfeld/ceos at commit bdd5f01, republished under its MIT licence (© bradfeld). 2,652 words, ~5,761 tokens.

Download SKILL.mdSave it as .claude/skills/ceos-quarterly-planning/SKILL.md (or your agent's skills folder).
name
ceos-quarterly-planning
description
Use when conducting or reviewing a quarterly planning session for the leadership team
file-access
data/quarterly/, templates/quarterly-planning.md, data/rocks/, data/scorecard/, data/vision.md, data/issues/, data/accountability.md
tools-used
Read, Write, Glob

ceos-quarterly-planning

Facilitate the EOS Quarterly Planning Session — the structured half-day meeting where the leadership team scores outgoing Rocks, reviews Scorecard trends, confirms vision alignment, tackles issues via IDS, and sets the next quarter's Rocks. This is "quarterly pulsing" — the bridge between weekly L10 meetings and the Annual Planning session.

When to Use

  • "Run quarterly planning" or "quarterly planning session"
  • "Plan next quarter" or "let's plan Q2"
  • "Score rocks and plan next quarter"
  • "End of quarter review and planning"
  • "Quarterly session" or "quarterly pulse"
  • "Review the quarter and set new rocks"
  • Any leadership team meeting focused on transitioning between quarters

Not for: 1-on-1 quarterly conversations (use ceos-quarterly), annual planning with V/TO refresh (use ceos-annual), or weekly meetings (use ceos-l10).

Context

Finding the CEOS Repository

Search upward from the current directory for the .ceos marker file. This file marks the root of the CEOS repository.

If .ceos is not found, stop and tell the user: "Not in a CEOS repository. Clone your CEOS repo and run setup.sh first."

Sync before use: Once you find the CEOS root, run git -C <ceos_root> pull --ff-only --quiet 2>/dev/null to get the latest data from teammates. If it fails (conflict or offline), continue silently with local data.

Key Files
FilePurpose
data/quarterly/YYYY-QN-planning.mdQuarterly planning session notes (one per quarter)
data/rocks/YYYY-QN/Rock files for each quarter (read for scoring and reference)
data/scorecard/weeks/Weekly scorecard data (read for 13-week trend analysis)
data/scorecard/metrics.mdScorecard metric definitions (reference for targets)
data/vision.mdV/TO document (read 1-Year Plan for Rock alignment)
data/issues/open/Open issues (read for IDS sweep)
data/issues/solved/Solved issues (count for quarter summary)
templates/quarterly-planning.mdTemplate for new quarterly planning files
data/accountability.mdAccountability Chart (seat owners for Rock-owner alignment)
Planning File Format

Each quarterly planning session is a markdown file at data/quarterly/YYYY-QN-planning.md with YAML frontmatter:

yaml
quarter: "2026-Q1"
date: "2026-03-28"
attendees: "Brad, Daniel, Sarah"
location: "Office"
Quarter Format

Quarters follow YYYY-QN format: 2026-Q1, 2026-Q2, 2026-Q3, 2026-Q4.

To determine the current quarter from today's date:

  • Jan-Mar = Q1, Apr-Jun = Q2, Jul-Sep = Q3, Oct-Dec = Q4
Quarterly Planning Agenda

The full quarterly planning session follows a 6-section agenda:

#SectionFocusTime
1Score Outgoing RocksScore the outgoing quarter's Rocks, celebrate wins30 min
2Scorecard ReviewReview 13-week trends, identify patterns20 min
3V/TO CheckConfirm vision alignment, review 1-Year Plan progress20 min
4IDSTackle long-term issues via Identify, Discuss, Solve60 min
5Set Next Quarter RocksDefine next quarter's Rocks aligned to 1-Year Plan45 min
6ConcludeKey decisions, cascading messages, action items15 min
Quarter Determination

When determining which quarter to plan:

  • Last 2-3 weeks of a quarter (typical): The "outgoing quarter" is the current quarter. The "next quarter" is the upcoming one. Example: Running in mid-March → outgoing = Q1, next = Q2.
  • First 2 weeks of a quarter: Ask: "Planning for outgoing quarter (QN-1) or current quarter (QN)?" Teams sometimes run quarterly planning slightly late.
  • Mid-quarter (month 1-2): Warn: "Quarterly planning typically runs at quarter end (final 2-3 weeks). Continue anyway?" Allow it.
Key EOS Principles
  • Quarterly pulsing is the execution heartbeat. It bridges weekly L10s (tactical) and Annual Planning (strategic). Without it, teams drift.
  • This is NOT a V/TO refresh. The quarterly session confirms alignment and reviews 1-Year Plan progress, but does not revisit Core Values, Core Focus, or 10-Year Target (those are annual only).
  • Rock completion target is 80%. Teams should complete at least 80% of their Rocks each quarter. Below 80% indicates Rocks are too ambitious or execution is lacking.
  • Every Rock must align to a 1-Year Plan goal. When setting next quarter's Rocks, each Rock should connect to a specific 1-Year Plan goal.
  • 3-7 Rocks per person. Fewer than 3 suggests under-commitment; more than 7 means focus is spread too thin.
  • All leadership team members should attend. If someone is missing, note it but proceed.

Process

Mode: Plan

Use when conducting the full quarterly planning session with the structured 6-section agenda.

Step 1: Setup
  1. Determine the quarters. Identify the "outgoing quarter" (being scored) and the "next quarter" (being planned). Follow the Quarter Determination rules above. Ask if not clear from context.

  2. Check for existing planning file. Look for data/quarterly/YYYY-QN-planning.md (using the outgoing quarter).

    • Exists: Ask: "Quarterly planning for YYYY-QN already exists. Open it to review, append notes, or start fresh?"
    • New: Continue with step 3.
  3. Gather session details:

    • Attendees (all leadership team members should be present)
    • Location (office, offsite, etc.)
    • Date (default to today)
  4. Gather context. Read these files silently:

    • data/rocks/YYYY-QN/ — outgoing quarter's Rocks (for scoring)
    • data/scorecard/weeks/ — scorecard data for the past 13 weeks
    • data/scorecard/metrics.md — metric definitions and goals
    • data/vision.md — 1-Year Plan goals (for alignment)
    • data/issues/open/ — open issues list (for IDS)
    • data/accountability.md — seat owners (for Rock-owner alignment in Section 5)
  5. Create the quarter directory if it doesn't exist: data/quarterly/

Display a preparation summary:

Quarterly Planning — [Outgoing Quarter] → [Next Quarter]
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Date: [Date]
Attendees: [Names]
Location: [Location]

Data loaded:
  Rocks (outgoing): [Count] rocks for [Outgoing Quarter]
  Scorecard: [N] weeks of data
  1-Year Plan: [Goal count] goals
  Open issues: [Count]

Let's walk through the 6-section agenda.
Step 2: Section 1 — Score Outgoing Rocks
  1. Read all Rock files from data/rocks/YYYY-QN/ for the outgoing quarter. Display current status for each Rock:

    Outgoing Rocks — [Quarter]
    ━━━━━━━━━━━━━━━━━━━━━━━━━━
    | Rock | Owner | Status | Notes |
    |------|-------|--------|-------|
    | Launch Beta | Brad | complete ✓ | Launched week 8 |
    | Partner Outreach | Daniel | on_track → ? | 2/3 done |
    | Redesign Onboarding | Sarah | dropped ✗ | Deprioritized |
  2. Finalize unscored Rocks. For any Rocks still on_track or off_track, prompt: "Mark as complete or dropped?"

  3. Calculate completion rate: (complete / total) * 100.

    If below 80%: "Below the 80% target. Discuss: Were Rocks too ambitious, or were there execution issues?"

    If no Rock files exist: "No Rocks on file for [Quarter]. Skip Rock scoring, or enter scores manually?"

  4. Celebrate wins. Prompt: "What were the biggest wins this quarter?" Record responses.

Record all scoring data in the planning file.

Step 3: Section 2 — Scorecard Review
  1. Calculate the 13-week window. Determine which ISO weeks (YYYY-WNN) fall within the outgoing quarter, plus the prior week for trend context.

  2. Read scorecard files from data/scorecard/weeks/ for those weeks.

  3. For each metric, calculate:

    • Average value across the 13 weeks
    • Hit rate (percentage of weeks at or above goal)
    • Trend direction (improving, stable, declining — compare first 6 weeks vs last 6 weeks)
  4. Display summary:

    Scorecard Review — [Quarter]
    ━━━━━━━━━━━━━━━━━━━━━━━━━━━
    | Metric | Avg | Goal | Hit Rate | Trend |
    |--------|-----|------|----------|-------|
    | Weekly Revenue | \$48K | \$50K | 65% | Improving ↑ |
    | New Customers | 8 | 10 | 45% | Stable → |
    | NPS | 74 | 70 | 85% | Improving ↑ |
  5. Discuss. Prompt: "Which metrics need attention? Any targets to adjust for next quarter?"

    If no scorecard data: "No Scorecard data for the quarter. Skip Scorecard review."

Record trends and discussion in the planning file.

Step 4: Section 3 — V/TO Check

This is a light alignment check, not a full V/TO refresh (that's annual).

  1. Read data/vision.md and extract the 1-Year Plan goals.

  2. Display 1-Year Plan progress:

    1-Year Plan Progress Check
    ━━━━━━━━━━━━━━━━━━━━━━━━━━
    | # | Goal | Progress | On Track? |
    |---|------|----------|-----------|
    | 1 | \$2M ARR | \$1.2M (60%) | Yes ✓ |
    | 2 | Launch 3 products | 2/3 launched | Yes ✓ |
    | 3 | Hire VP Sales | Not started | No ✗ |
  3. Prompt for discussion:

    • "Are we still aligned on the 1-Year Plan?"
    • "Any goals that need adjustment?" (Note: major changes should be flagged for annual planning)
    • "Are there strategic concerns to discuss?"
  4. Record alignment notes in the planning file. If major concerns arise, note: "Flag for annual planning: [concern]"

Important: This section does NOT update data/vision.md. If the user wants to update the V/TO, point them to ceos-vto after the session.

Step 5: Section 4 — IDS
  1. Read all open issues from data/issues/open/.

  2. Display the list with age (days since created):

    Open Issues
    ━━━━━━━━━━━
    | Issue | Age | Priority |
    |-------|-----|----------|
    | Hiring pipeline slow | 45d | High |
    | Customer churn Q1 | 12d | Normal |
    | Tech debt in auth | 90d | Low |
  3. Add new issues. Prompt: "Any new issues to add before we start IDS?"

  4. Prioritize. Ask: "Which issues should we tackle today?" Typically 3-5 issues fit in the time box.

  5. For each selected issue, run IDS:

    • Identify the real issue (often different from the symptom)
    • Discuss perspectives (set a timer — keep it focused)
    • Solve with a specific action item, owner, and due date
  6. Record IDS results in the planning file.

    If no open issues exist: "No open issues on file. Skip IDS, or add new issues?"

Note: For issues that need formal tracking, reference ceos-ids for creating issue files.

Step 6: Section 5 — Set Next Quarter Rocks
  1. Reference the 1-Year Plan from data/vision.md. Display the goals so Rocks can be aligned.

  2. Prompt: "What Rocks for [Next Quarter] will drive progress on the 1-Year Plan?"

  3. For each proposed Rock, collect:

    • Title (specific, measurable outcome)
    • Owner (one person)
    • Which 1-Year Plan goal it aligns to
  4. Validate:

    • 3-7 Rocks per person. Flag if outside range: "Brad has 8 Rocks — consider consolidating."
    • Alignment. Each Rock should connect to a 1-Year Plan goal. Flag any that don't: "This Rock doesn't align to a specific 1-Year goal. Is it still a priority?"
    • Measurability. Each Rock should have a clear done/not-done criteria.
    • Seat alignment. Cross-reference Rock owners against data/accountability.md. Each Rock's subject area should match the owner's seat responsibilities. Flag mismatches: "This Rock falls under [Seat] responsibilities. Should [Seat Owner] own it?"
  5. Display the full Rock list for approval:

    Next Quarter Rocks — [Next Quarter]
    ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
    | Rock | Owner | Aligned To |
    |------|-------|------------|
    | Launch product #3 | Brad | Goal 2: Launch 3 products |
    | Hire VP Sales | Daniel | Goal 3: Hire VP Sales |
    | Reduce churn to <5% | Sarah | Goal 1: \$2M ARR |

Record in the planning file.

Note: Create individual Rock files using ceos-rocks after this session. The planning file captures the decisions; the Rock files are the operational artifacts.

Step 7: Section 6 — Conclude
  1. Key Decisions. Summarize the major decisions made during the session.

  2. Cascading Messages. Ask: "What needs to be communicated to the rest of the organization?"

  3. Action Items. Compile all action items from all sections with owners and due dates:

    Action Items
    ━━━━━━━━━━━━
    | Action | Owner | Due Date |
    |--------|-------|----------|
    | Create Q2 Rock files via ceos-rocks | Brad | [Date] |
    | Update Scorecard targets via ceos-scorecard | Sarah | [Date] |
    | Resolve hiring pipeline issue | Daniel | [Date] |
  4. Next Steps. List follow-up tasks:

    • Create Rock files for next quarter using ceos-rocks
    • Update Scorecard targets if changed using ceos-scorecard
    • Create issue files for new issues using ceos-ids
    • Communicate decisions to the organization
Step 8: Save the Planning File
  1. Show the complete planning file before writing.
  2. Ask: "Save this quarterly planning session?"
  3. Write to data/quarterly/YYYY-QN-planning.md (using the outgoing quarter in the filename).
  4. Remind: "Run git commit to save the planning session."
  5. List follow-up actions:
    • "Create next quarter's Rock files using ceos-rocks"
    • "Update Scorecard targets if changed using ceos-scorecard"
    • "Create issue files for new issues using ceos-ids"

Show full SKILL.md (1,157 more words)Show less
Mode: Review Quarter

Use when analyzing a quarter's performance without running a full planning session. This is a lighter, read-only summary.

Step 1: Determine the Quarter

Ask which quarter to review. Defaults:

  • If run in the first 2 weeks of a quarter: Default to the previous quarter (just completed)
  • If run at quarter end (last 2-3 weeks): Default to the current quarter (wrapping up)
  • Otherwise: Ask which quarter
Step 2: Load and Score Rock Data

Read all Rock files from data/rocks/YYYY-QN/.

For each Rock, note:

  • Title, owner, status
  • If status is on_track or off_track: note as "still in progress"

Calculate:

  • Total Rocks
  • Complete count (status = complete)
  • Dropped count (status = dropped)
  • Completion rate: (complete / total) * 100

Display:

Rock Performance — YYYY-QN
━━━━━━━━━━━━━━━━━━━━━━━━━━

| Rock | Owner | Status |
|------|-------|--------|
| Launch Beta | Brad | complete ✓ |
| Partner Outreach | Daniel | complete ✓ |
| Redesign Onboarding | Sarah | dropped ✗ |

Completion: 2/3 (67%) — Below 80% target ⚠️

Also display per-person breakdown:

By Owner:
  Brad: 2 Rocks, 2 complete (100%)
  Daniel: 2 Rocks, 1 complete (50%)
  Sarah: 1 Rock, 0 complete (0%)

If no Rock files exist: "No Rocks on file for YYYY-QN."

Read scorecard files from data/scorecard/weeks/ that fall within the quarter's 13-week window.

For each metric, calculate:

  • Average value across the weeks
  • Hit rate (percentage of weeks at or above goal)
  • Trend direction (improving, stable, declining)

Display:

Scorecard Trends — YYYY-QN
━━━━━━━━━━━━━━━━━━━━━━━━━━

| Metric | Avg | Goal | Hit Rate | Trend |
|--------|-----|------|----------|-------|
| Weekly Revenue | \$48K | \$50K | 65% | Improving ↑ |
| New Customers | 8 | 10 | 45% | Stable → |
| NPS | 74 | 70 | 85% | Improving ↑ |

If no scorecard data: "No Scorecard data for YYYY-QN."

Step 4: Issues Summary

Count issues:

  • Read data/issues/solved/ — count issues resolved during the quarter (by date)
  • Read data/issues/open/ — count current open issues
Issues — YYYY-QN
━━━━━━━━━━━━━━━━

Resolved this quarter: [N] issues
Currently open: [N] issues
Step 5: Quarter Summary

Display a consolidated report:

Quarter Summary — YYYY-QN
━━━━━━━━━━━━━━━━━━━━━━━━━

Rock Completion: 67% (target 80%) ⚠️
Scorecard Hit Rate: 65% average across metrics
Issues Resolved: 5
Issues Remaining: 8

Highlights:
  ✓ [Best-performing area]
  ✓ [Notable achievement]
  ⚠️ [Area needing improvement]

Ask: "Would you like to save this review to data/quarterly/YYYY-QN-planning.md?"

If yes, write the summary. If a planning file already exists for this quarter, ask before overwriting.

Output Format

Plan: Progressive display of each agenda section during the session. Show preparation summary at the start, then walk through each section interactively. Show the complete planning file before saving.

Review Quarter: Summary tables with Rock completion rates (overall and per person), Scorecard trends (13-week window), and issues count. Consolidated quarter summary at the end. Offer to save the review.

Guardrails

  • Always show the complete file before writing. Never create or modify a planning file without showing it and getting approval.

  • Cross-reference existing data. Read Rock scores, Scorecard numbers, and issues from their source files. Don't ask users to re-enter data that's already tracked.

  • Don't auto-invoke skills. When quarterly planning results suggest using another skill (e.g., creating Rock files, updating Scorecard), mention the option but let the user decide. Say "Would you like to create Rock files using ceos-rocks?" rather than doing it automatically.

  • Sensitive data warning. On first use in a session, remind the user: "Quarterly planning notes contain sensitive strategic data (performance metrics, personnel decisions, strategic priorities). Ensure your CEOS repo is private."

  • Quarterly planning does NOT refresh the V/TO. The V/TO Check (Section 3) confirms alignment and reviews 1-Year Plan progress, but does NOT walk through Core Values, Core Focus, or 10-Year Target. Those are reserved for annual planning. If the user wants to update data/vision.md, point them to ceos-vto.

  • One file per quarter. If a planning file already exists for the quarter, warn before creating a second one. Allow it (sessions sometimes need to be re-run), but make sure it's intentional.

  • Respect the agenda. Walk through all 6 sections in order. Each serves a purpose. But keep each section focused — this is a half-day session, not a full-day one.

  • Rock alignment. When setting next quarter's Rocks (Section 5), verify each Rock connects to a 1-Year Plan goal. Flag any that don't align — they may still be valid, but should be discussed.

  • 3-7 Rocks per person. Flag if anyone has fewer than 3 or more than 7 Rocks. This is a guideline, not a hard rule, but deviations should be conscious decisions.

  • Don't skip sections in Plan mode. Walk through all 6 sections. If the user wants to skip a section, note it in the file: "Section X: Skipped per team decision."

  • Finalize Rock scores. In Section 1, Rocks that are still on_track or off_track must be scored as complete or dropped. The outgoing quarter needs closure.

  • The planning doc and the rock files must stay in sync. When Rocks are scored or created, the change belongs in both places: the status field in the individual rock file's frontmatter, and the rock scorecard table in the quarterly planning document. When one person updates the rock files and another updates the planning doc, a reconciliation pass is needed to bring them back into alignment. The planning doc is the consolidated narrative view; the rock files are the source of truth for status.

    // Good
      # First change: set rock-001 status to 'dropped' in its frontmatter
      # Second change: update the Q1 planning doc table to show 'Dropped', matching the rock file
    
    // Bad
      # Updating the planning doc table without changing the rock file's frontmatter status
      # Or: updating the rock file's status without reflecting it in the planning doc

Integration Notes

Rocks (ceos-rocks)
  • Read: ceos-quarterly-planning reads Rock files from data/rocks/YYYY-QN/ for scoring in Section 1 (Score Outgoing Rocks) and for reference when setting next quarter's Rocks in Section 5. It does not modify Rock files.
  • Related: After the session, ceos-rocks should be used to create individual Rock files for the next quarter.
Scorecard (ceos-scorecard)
  • Read: ceos-quarterly-planning reads scorecard data from data/scorecard/weeks/ for 13-week trend analysis in Section 2. It also reads data/scorecard/metrics.md for metric definitions and goals.
  • Related: After the session, ceos-scorecard should be used to update metric targets if they changed.
V/TO (ceos-vto)
  • Read: ceos-quarterly-planning reads data/vision.md for the 1-Year Plan goals — used in the V/TO Check (Section 3) and for Rock alignment in Section 5. It does NOT modify data/vision.md.
  • Related: If major V/TO changes surface during the session, they should be flagged for annual planning or handled via ceos-vto.
IDS (ceos-ids)
  • Read: ceos-quarterly-planning reads open issues from data/issues/open/ for the IDS sweep in Section 4. In Review Quarter mode, it reads data/issues/solved/ for the quarter summary.
  • Related: After the session, ceos-ids should be used to create formal issue files for any new issues identified.
L10 (ceos-l10)
  • Related: L10 is the weekly cadence; quarterly planning is the quarterly cadence. They complement each other — the L10 handles weekly tactical issues, while quarterly planning handles strategic transitions between quarters. Action items from quarterly planning may appear as To-Dos in subsequent L10s.
Annual Planning (ceos-annual)
  • Related: Annual planning is the yearly superset that includes V/TO refresh, year-in-review, and Q1 Rock setting. Quarterly planning fills the 3 inter-annual quarters (Q2, Q3, Q4 planning). Annual planning sets the 1-Year Plan; quarterly planning executes against it.
Accountability Chart (ceos-accountability)
  • Read: ceos-quarterly-planning reads data/accountability.md during Section 5 (Set Next Quarter Rocks) to validate that Rock owners match seat responsibilities. Each Rock's subject area should map to the owner's seat in the Accountability Chart.
  • Suggested flow: If a Rock doesn't align with the owner's seat, suggest: "This Rock falls under [Seat] responsibilities. Should [Seat Owner] own it instead?"
Orchestration Principle

ceos-quarterly-planning reads data from multiple skills during the planning session (rocks, scorecard, vision, issues) but writes only to data/quarterly/. Individual skills handle their own operational artifacts — ceos-rocks creates Rock files, ceos-scorecard updates metrics, ceos-ids manages issues. The quarterly planning file captures decisions; the skills create the operational follow-through.

© bradfeld, MIT. Rendered from Markdown: HTML in the file is shown as text, images as links, and headings moved down two levels. Raw file

Files

Just SKILL.md in skills/ceos-quarterly-planning of bradfeld/ceos.

Open the folder on GitHubat commit bdd5f01

Compare with similar skills

Ceos Quarterly Planning next to the 5 skills that share the most tags, products or categories with it. Stars are the repository's; “used in” counts other GitHub owners with a copy.

Ceos Quarterly Planning compared with similar skills
SkillStarsUsed inTokensAuto-checkLicenceRepo updated
Ceos Quarterly Planning this skillbradfeld/ceos156—~5.8kAutomated safety check: PassMIT
Product Strategistalirezarezvani/claude-skills28k2 repos~1.8kAutomated safety check: PassMIT
Strategic Roadmap Planningdeanpeters/Product-Manager-Skills7.2k2 repos~4.7kAutomated safety check: PassCustom licence
Walking Skeleton Roadmap Scopingprime-radiant-inc/iterative-development181—~1.7kAutomated safety check: PassApache-2.0
AI Product Strategy InterviewerPrepLabsAI/InterviewMentor112—~4.5kAutomated safety check: PassMIT
Product PlannerBuildGreatProducts/builder-os228—~4.6kAutomated safety check: PassMIT

Similar skills

  • Product Strategist

    alirezarezvani/claude-skills

    OKR cascade toolkit for product leaders: generates aligned company-to-team OKRs from five strategy types and scores how well they line up.

    28k GitHub starsUsed in 2 repos~1.8k tokens
    Product & Project ManagementAuto-check passed
  • Strategic Roadmap Planning

    deanpeters/Product-Manager-Skills

    Sequences prioritization, epic definition, and stakeholder alignment into a release plan that ladders up to business outcomes.

    7.2k GitHub starsUsed in 2 repos~4.7k tokens
    Product & Project ManagementAuto-check passed
  • Walking Skeleton Roadmap Scoping

    prime-radiant-inc/iterative-development

    Turns extracted requirements into a roadmap by choosing a walking skeleton iteration with its first journey scenario and ordering the remaining work into follow-on iterations.

    181 GitHub stars~1.7k tokensUpdated 4 mo ago
    Product & Project ManagementAuto-check passed
  • AI Product Strategy Interviewer

    PrepLabsAI/InterviewMentor

    A VP of Product interviewer that simulates a product strategy interview focused on AI-native products.

    112 GitHub stars~4.5k tokensUpdated 4 days ago
    Product & Project ManagementAuto-check passed
  • Product Planner

    BuildGreatProducts/builder-os

    Vision intake conversation followed by generation of three product documents — docs/product-vision.md (strategy and brand), docs/prd.md (technical spec for coding agents), and…

    228 GitHub stars~4.6k tokensUpdated 3 mo ago
    Product & Project ManagementAuto-check passed
  • Rewrites a feature-list roadmap into outcome statements that name the customer segment, the result they get and the business impact, grouped into themes.

    103 GitHub stars~1.3k tokensUpdated today
    Product & Project ManagementAuto-check passed

More from bradfeld/ceos

All 23 skills in this repo
  • Ceos Accountability

    bradfeld/ceos

    A skill your agent uses when viewing, updating, or auditing the Accountability Chart — seats, owners, and roles

    156 GitHub stars~3.4k tokensUpdated 27 days ago
    Auto-check passed
  • Ceos Assistance

    bradfeld/ceos

    A skill your agent uses when managing daily operational delegation through The Stack and structured leader-assistant standups

    156 GitHub stars~3.9k tokensUpdated 27 days ago
    Auto-check passed
  • Ceos Calendar

    bradfeld/ceos

    A skill your agent uses when managing the rolling market calendar - conferences, launches, fundraising milestones, partner events, and team constraints

    156 GitHub stars~2k tokensUpdated 27 days ago
    Auto-check passed
  • Ceos Cashflow

    bradfeld/ceos

    A skill your agent uses when assessing and optimizing the 8 financial levers that drive cash flow and profitability

    156 GitHub stars~3.2k tokensUpdated 27 days ago
    Auto-check passed
  • Ceos Clarity

    bradfeld/ceos

    A skill your agent uses when taking a Clarity Break — stepping back from day-to-day work for strategic thinking time

    156 GitHub stars~3k tokensUpdated 27 days ago
    Auto-check passed
  • Ceos Dashboard

    bradfeld/ceos

    A skill your agent uses when you want a quick snapshot of overall business health across all EOS components

    156 GitHub stars~3.2k tokensUpdated 27 days ago
    Auto-check passed

Questions about Ceos Quarterly Planning

What does Ceos Quarterly Planning do?

A skill your agent uses when conducting or reviewing a quarterly planning session for the leadership team. Ceos Quarterly Planning is an agent skill from bradfeld/ceos.

When should I use Ceos Quarterly Planning?

Ceos Quarterly Planning fits situations like: reviewing a quarterly planning session for the leadership team; tasks that involve Product roadmapping.

How do I install Ceos Quarterly Planning in Claude Code?

Run `npx skills add bradfeld/ceos --skill ceos-quarterly-planning -a claude-code`. Or copy the skill folder (skills/ceos-quarterly-planning in bradfeld/ceos) into .claude/skills/ceos-quarterly-planning in your project. Claude Code loads it when a task matches its description.

How do I install Ceos Quarterly Planning in Codex?

Run `npx skills add bradfeld/ceos --skill ceos-quarterly-planning -a codex`. Or copy the skill folder (skills/ceos-quarterly-planning in bradfeld/ceos) into .agents/skills/ceos-quarterly-planning in your project. Codex loads it when a task matches its description.

Can I use Ceos Quarterly Planning in Cursor, Gemini CLI or GitHub Copilot?

Cursor, Gemini CLI, GitHub Copilot and OpenCode also load SKILL.md folders. With the skills CLI, run `npx skills add bradfeld/ceos --skill ceos-quarterly-planning -a cursor` (or -a gemini-cli, github-copilot or opencode for the others). To copy it by hand, put the folder in .cursor/skills/ceos-quarterly-planning, .gemini/skills/ceos-quarterly-planning, .github/skills/ceos-quarterly-planning and .opencode/skills/ceos-quarterly-planning in your project.

What does Ceos Quarterly Planning need to run?

Going by SKILL.md and its folder, Ceos Quarterly Planning needs the command-line tools its instructions call (git).

Does Ceos Quarterly Planning access the network?

SKILL.md contains no URLs. Its commands use git, which can reach the network depending on how they are called. This is read from the text; nothing was executed.

Is Ceos Quarterly Planning safe to install?

Our automated static check of SKILL.md found no risky patterns, such as piping downloads into a shell, reading credential files or hidden Unicode. It is not a guarantee. Review the folder before installing.

What licence does Ceos Quarterly Planning use?

Ceos Quarterly Planning is published under the MIT licence (the repository's licence). It allows redistribution, so the full SKILL.md is shown on this page.

How many tokens does Ceos Quarterly Planning use?

About 5.8k tokens (SKILL.md is roughly 23k characters). Agents keep only the skill's name and description in context until a task matches; then they load SKILL.md in full.

What are the alternatives to Ceos Quarterly Planning?

Skills that share tags, products or a category with Ceos Quarterly Planning: Product Strategist (alirezarezvani/claude-skills, 28k stars), Strategic Roadmap Planning (deanpeters/Product-Manager-Skills, 7.2k stars), Walking Skeleton Roadmap Scoping (prime-radiant-inc/iterative-development, 181 stars) and AI Product Strategy Interviewer (PrepLabsAI/InterviewMentor, 112 stars). The comparison table on this page puts their stars, adoption, token cost, safety result and licence side by side.

Who maintains Ceos Quarterly Planning?

bradfeld (a GitHub user) maintains it in bradfeld/ceos, which has 156 GitHub stars. The repository holds 23 skills in this directory. The repository was last updated on September 13, 2026.

Source: bradfeld/ceos on GitHub. Facts on this page come from the repository at the commit we read; the author's words are quoted as theirs.