name: implement-roadmap-version
description: "Implement all items for a specific version in the pg_trickle roadmap. Use when: working through a milestone, implementing a release, or completing planned features. Drives a full implementation loop — reads plan docs, implements each item, keeps status up to date, asks the user when blocked, and reports what remains at the end."
argument-hint: "Target version (e.g. 0.20.0)"
---

# Implement Roadmap Version

Structured, self-driving workflow for implementing every item in a specific
pg_trickle release milestone. The skill continues working through items
sequentially, updates plan and roadmap status as it goes, surfaces blockers
to the user with concrete questions, and produces a completion report at the
end.

## When to Use

- Starting work on a planned milestone
- Resuming an in-progress milestone after a pause
- Verifying how far along a release is and continuing from where it left off

## Inputs to Gather First

Before any implementation begins, read these files **in parallel**:

1. `ROADMAP.md` — find the target version section: theme, item list, status
2. `plans/PLAN_0_<version_underscored>.md` — implementation order, phases,
   item IDs, effort estimates, exit criteria (if the file exists)
3. `CHANGELOG.md` (last 200 lines) — avoid re-implementing already-shipped work
4. `AGENTS.md` — coding conventions, error handling rules, SPI rules
5. `plans/INDEX.md` — cross-reference any linked sub-plans

If `plans/PLAN_0_<version_underscored>.md` does not exist, create it following
the template in [Step 1b](#step-1b--create-the-plan-file-if-missing) before
proceeding.

---

## Procedure

### Step 0 — Establish Context

Run the following in parallel:

```bash
# What version are we on?
cat pg_trickle.control | grep '^default_version'
grep '^version' Cargo.toml | head -1

# Are there uncommitted changes?
git status --short

# Which branch are we on?
git branch --show-current
```

Determine:
- **Target version** (from the argument or user's message)
- **Current version** (from `pg_trickle.control`)
- **Full details file**: `roadmap/v<VERSION>.md-full.md`
  - Example: v0.34.0 → `roadmap/v0.34.0.md-full.md`
- **Branch**: if on `main`, a new branch must be created before making any
  changes: `git checkout -b <version>-implementation`

---

### Step 1a — Parse the Full Details File

Read `roadmap/v<VERSION>.md-full.md` and extract:

1. **All item IDs and titles** (e.g. `DOG-1`, `PG17-3`)
2. **Current status** of each item in the Implementation Status table
   (⬜ Not started / 🔄 In progress / ✅ Done / ⏭ Skipped)
3. **Phase groupings** — respect the recommended implementation order
4. **Exit criteria** — the checklist at the bottom of the full details file
5. **Items already done** — skip these, but record them for the completion
   report

---

### Step 1b — Create the Full Details File if Missing

If `roadmap/v<VERSION>.md-full.md` does not exist:

1. Read the roadmap section for the target version from `ROADMAP.md`.
2. Create `roadmap/v<VERSION>.md-full.md` using this skeleton:

```markdown
> **Plain-language companion:** [v<VERSION>.md](v<VERSION>.md)

## v<VERSION> — <Theme from ROADMAP>

**Status: Planned.** Derived from [ROADMAP.md](../ROADMAP.md).

> **Release Theme**
> <one-paragraph summary>

---

### Correctness

| ID | Title | Effort | Priority |
|----|-------|--------|----------|
<rows>

### Ease of Use

| ID | Title | Effort | Priority |
|----|-------|--------|----------|
<rows>

### Test Coverage

| ID | Title | Effort | Priority |
|----|-------|--------|----------|
<rows>

---

### Recommended Implementation Order

<phases derived from roadmap items, ordered by dependency>

---

### Implementation Status

| ID | Title | Status |
|----|-------|--------|
<one row per item, all "⬜ Not started" initially>

---

### Exit Criteria

- [ ] All P0 items ✅ Done
- [ ] `just test-all` passes
- [ ] `just check-version-sync` exits 0
- [ ] CHANGELOG.md entry written
- [ ] ROADMAP.md v<VERSION> row marked ✅ Released
```

3. Also create the plain-language companion `roadmap/v<VERSION>.md` if missing.
4. Add both files to git staging:
   ```bash
   git add roadmap/v<VERSION>.md roadmap/v<VERSION>.md-full.md
   ```

---

### Step 2 — Build the Work Queue

Construct an ordered list of items to implement:

1. Take all items from the full details file in phase order.
2. **Skip** items already marked ✅ Done or ⏭ Skipped.
3. Mark the first actionable item as `🔄 In progress` in the full details file.
4. Use `manage_todo_list` to track all items, using the item ID as the todo ID.

If no items remain (all ✅ / ⏭), jump directly to [Step 6 — Completion
Report](#step-6--completion-report).

---

### Step 3 — Implement Each Item (Loop)

For each item in the work queue, repeat this inner loop:

#### 3a. Understand the Item

Read the roadmap description for the item. Identify:
- What code/SQL/test/doc changes are needed
- Which files are affected
- Whether a schema change is required (SQL migration needed)
- Dependencies on other items (check they are ✅ Done first)

If a dependency is not yet done, reorder: implement the dependency first.

#### 3b. Ask Before Ambiguous Work

**Before making any irreversible change**, if the item is ambiguous or has
multiple valid approaches, ask the user a focused question:

> "For item `<ID>` — `<title>`, I'm planning to `<approach>`. Does that match
> your intent, or should I `<alternative>`?"

Keep questions concrete and binary where possible. Never ask about more than
two items at once.

For straightforward, clearly-specified items: **do not ask — just implement**.

#### 3c. Implement

Apply changes following `AGENTS.md` conventions:

| Item type | Required steps |
|-----------|---------------|
| New Rust feature | Edit `src/`, run `just fmt`, run `just lint` |
| New SQL function | Edit `src/api/*.rs` + upgrade migration SQL + full install SQL |
| New/modified SQL | Update `sql/pg_trickle--<prev>--<cur>.sql` and `sql/pg_trickle--<cur>.sql` |
| Schema change | Require explicit user confirmation before proceeding |
| New test | Add to `tests/e2e_*_tests.rs` following naming convention |
| Documentation | Edit the relevant file in `docs/` |
| Config/GUC | Add to `src/config.rs`, document in `docs/CONFIGURATION.md` |
| Build/CI change | Edit `justfile`, `.github/workflows/*.yml`, `Dockerfile.*` |

After each item's changes are applied:
```bash
just fmt          # Always
just lint         # Must pass with zero warnings
```

For items that add or modify SQL-facing code, also run the appropriate tier:
```bash
just test-unit           # Always run after Rust changes
just test-integration    # Run if catalog or SPI changes
```

Do **not** run `just test-e2e` or `just test-all` after every item — reserve
these for phase boundaries (see Step 3e).

#### 3d. Update Status

Immediately after each item is implemented and lint passes:

1. Update the item's row in the full details file's Implementation Status table:
   `⬜ Not started` → `✅ Done`
2. If the item was in-progress (`🔄`), also update that row.
3. Update the **Status** line at the top of the full details file.

```markdown
<!-- Example update in Implementation Status table -->
| DOG-3 | Create `pgtrickle.self_monitor()` stream table | ✅ Done |
```

#### 3e. Phase Boundary Validation

At the end of each **phase** (not after every item):

```bash
just test-unit
just test-integration    # if any catalog/SPI changes in the phase
```

If tests fail:
1. Fix the failures before moving to the next phase.
2. If a failure is in pre-existing code unrelated to the current item, note it
   and ask the user: "I found a pre-existing failure in `<test>`. Should I fix
   it now or log it as a separate issue?"

---

### Step 4 — Handle Blockers

If an item cannot be implemented because:

- **Missing information**: ask the user one focused question; do not guess.
- **External dependency** (e.g. a library update, a PostgreSQL version):
  mark the item `⏭ Skipped (blocked: <reason>)` in the plan file, record
  it in the completion report, and continue with the next item.
- **Scope unclear**: present two concrete options and ask the user to choose.
- **Compilation or test failure that is not fixable within the item scope**:
  pause and ask the user for guidance before continuing.

Never silently skip items without recording the skip reason in the full details file.

---

### Step 5 — Update ROADMAP.md

After **all** items in the version are either ✅ Done or ⏭ Skipped:

1. Find the version section in `ROADMAP.md`.
2. If all required items (P0/P1) are done, update the status:
   - In the overview table: `Planned` → `✅ Released`
   - In the section heading: add `**Status: Released (<date>).**`
3. If skipped items exist, update the status to reflect the gap:
   - `**Status: Partially implemented — see plan for skipped items.**`
4. Run:
   ```bash
   just check-version-sync    # Verify version consistency
   ```

---

### Step 6 — Completion Report

After the implementation loop finishes, output a structured report:

```
## v<VERSION> Implementation Summary

### Completed (<N> items)
- ✅ <ID>: <title>
- ✅ <ID>: <title>
...

### Skipped (<N> items)
- ⏭ <ID>: <title> — <reason>
...

### Remaining work before release
1. <Exit criterion not yet met>
2. <Exit criterion not yet met>
...

### Recommended next steps
- Run `just test-e2e` to validate full E2E suite
- Run `just test-all` for final gate
- Update CHANGELOG.md with `## [<VERSION>]` entry
- Bump version: `just bump-version <VERSION>`
- Create PR using the `create-pull-request` skill
```

If all exit criteria in the full details file's checklist are met, add:

> **Release-ready.** All exit criteria satisfied. Ready for `create-pull-request`.

---

## Status Symbols

| Symbol | Meaning |
|--------|---------|
| ⬜ | Not started |
| 🔄 | In progress |
| ✅ | Done |
| ⏭ | Skipped (reason recorded) |
| ❌ | Failed / blocked |

---

## Conventions Reference (from AGENTS.md)

- No `unwrap()` or `panic!()` in non-test code
- All `unsafe` blocks must have `// SAFETY:` comments
- SPI connections are short-lived
- New SQL functions use `#[pg_extern(schema = "pgtrickle")]`
- Return `Result<T, PgTrickleError>` — convert at API boundary
- Cast `name`-typed columns to `text` in SPI queries
- Tests use Testcontainers — never a local PG instance
- Use `pgrx::log!()` / `info!()` — never `println!()`

---

## Step 7 — Close out the release record

After the version implementation is complete:

1. Mark the release plan's acceptance criteria as complete, deferred, or
   rejected. Link deferred work to its current owner in `ROADMAP.md` or a
   focused plan.
2. Update `ROADMAP.md` and the release companion so their status and links
   match the shipped result.
3. Record durable design decisions in the relevant ADR or architecture
   document. Do not create another overall assessment snapshot.

---

## Important Safeguards

- **Never drop tables or columns** without explicit user confirmation
- **Never push to `main`** directly — always work on a feature branch
- **Never run `git push --force`** without explicit user confirmation
- **Never use shell heredocs** for PR body text (Unicode corruption risk)
- **Never skip lint** — `just lint` must pass with zero warnings before
  marking any item done
- **Never mark an item done** if its associated tests are failing
- **Keep current plans in sync** — after major roadmap edits, verify that each
  open item has a current owner and each release link resolves