Manage technical projects from initiation through delivery and closure: choose and tailor predictive, iterative, Scrum, flow-based, or hybrid approaches; coordinate teams and vendors; track…

MITAuto-check passedProduct & Project Management

Install Technical Project Management

skills CLI
$ npx skills add magnus919/agent-skills --skill technical-project-management -a claude-code

Project install by default; add -g for ~/.claude/skills/.

GitHub CLI
$ gh skill install magnus919/agent-skills technical-project-management --agent claude-code

Project scope by default; add --scope user for a personal install. Needs GitHub CLI 2.90.0 or later (public preview).

Manual copy
$ git clone --depth 1 https://github.com/magnus919/agent-skills.git skills-src && mkdir -p .claude/skills && cp -r skills-src/technical-project-management .claude/skills/technical-project-management && rm -rf skills-src

Use ~/.claude/skills/ instead of .claude/skills for a personal install. The folder must contain SKILL.md.

Claude Code skills documentation · loads skills from .claude/skills/

Facts

Skill name
technical-project-management
GitHub stars
115
Token cost
~2.9k tokens
SKILL.md length
1,108 words
Files
38 (incl. scripts, references)
Skills in repo
131
Repo updated
First seen
Licence
MIT

At a glance

Manage technical projects from initiation through delivery and closure: choose and tailor predictive, iterative, Scrum, flow-based, or hybrid approaches; coordinate teams and vendors; track…

  • Works in 6 steps: Establish mandate and authority;… → Select the smallest adequate management… → Reuse the implementation plan and… → …
  • A team has no project manager
  • SKILL.md covers First move, Operating loop, Reference routing and Templates and calculation, plus 2 more sections
  • Calls python3

What it does

Technical Project Management is an agent skill from magnus919/agent-skills. Manage technical projects from initiation through delivery and closure: choose and tailor predictive, iterative, Scrum, flow-based, or hybrid approaches; coordinate teams and vendors; track milestones, risks, issues, dependencies, forecasts, scope changes, and recovery. Use when a team has no project manager, a TPM needs decision-ready analysis, a project is slipping, or commitments and handoffs need coordination. Use technical-program-management instead when multiple related projects, teams, vendors, shared…

Its SKILL.md is about 2.9k tokens, which your agent loads only when the skill is triggered. The skill folder holds 40 other files, including scripts and reference files (for example `README.md`, `evals/evals.json` and `evals/sample-review.md`). Compatibility notes: Host-neutral methodology and Markdown templates. Optional read-only schedule analysis requires Python 3.10+ standard library; no credentials or network.

It sits in Product & Project Management, covering Project management. The repository describes itself as: Curated collection of AI agent skills for Hermes and other agent frameworks. The licence is MIT.

When your agent uses it

  • A team has no project manager
  • A TPM needs decision-ready analysis
  • A project is slipping
  • Commitments and handoffs need coordination

Example prompts

  • “/technical-project-management”

Requirements

  • Python 3
  • Compatibility (from SKILL.md): Host-neutral methodology and Markdown templates. Optional read-only schedule analysis requires Python 3.10+ standard library; no credentials or network.

Workflow steps

6 steps, taken from the first numbered list in SKILL.md.

  1. Establish mandate and authority; separate approved commitments, forecasts,
  2. Select the smallest adequate management approach. Preserve effective existing
  3. Reuse the implementation plan and maintain milestones, dependency commitments,
  4. Compare evidence with the baseline and tolerances. Investigate contradictions;
  5. Present feasible options when scope, capacity, cost, or dates conflict. Keep the
  6. Close only on acceptance and explicit residual ownership. Distinguish project

What it can do on your machine

Read from SKILL.md and the folder at commit 22b4723. It shows what the files ask for, not the result of running them.

  • Tool permissions

    Pre-approves nothing: there is no allowed-tools line, so your agent's usual permission prompts apply.

    From allowed-tools in the SKILL.md frontmatter.

  • Runs code

    Ships 1 file in scripts/, which the agent can run.

    Shell commands in SKILL.md call:

    • python3

    From the folder's file list and the shell code blocks in SKILL.md.

  • Network

    No URLs in SKILL.md.

    From URLs in SKILL.md, links to its own repository left out.

  • Credentials

    Names no API keys, tokens, secrets or passwords.

    From names ending in _API_KEY, _TOKEN, _SECRET, _KEY or _PASSWORD in SKILL.md.

  • Compatibility

    Host-neutral methodology and Markdown templates. Optional read-only schedule analysis requires Python 3.10+ standard library; no credentials or network.

    From compatibility in the SKILL.md frontmatter.

Context cost

Technical Project Management loads about 2.9k tokens when it runs, and up to ~16k if it reads all its reference files. Until then it costs about 221 tokens; SKILL.md has 1,108 words of instructions outside code blocks.

Always · name and description, kept in context so the agent knows when to use it
~221
When it runs · the whole SKILL.md, loaded when a task matches
~2.9k
With references · SKILL.md plus every file in references/, read only if the agent opens them
~16k

Estimates: characters ÷ 4, the usual rule of thumb; real counts depend on the model's tokenizer. Scripts and assets cost tokens only if the agent reads them.

Safety

Auto-check passed

The automated check found no risky patterns in SKILL.md.

Automated static check — not a guarantee. Review scripts before installing. It scans the text of SKILL.md for risky patterns (piping downloads into a shell, reading credential files, hidden Unicode, destructive commands); the scripts in this folder are not scanned.

SKILL.md

The full file from magnus919/agent-skills at commit 22b4723, republished under its MIT licence (© magnus919). 1,108 words, ~2,944 tokens.

Download SKILL.mdSave it as .claude/skills/technical-project-management/SKILL.md (or your agent's skills folder). This skill also uses 37 other files; get the full folder from GitHub.
name
technical-project-management
description
Manage technical projects from initiation through delivery and closure: choose and tailor predictive, iterative, Scrum, flow-based, or hybrid approaches; coordinate teams and vendors; track milestones, risks, issues, dependencies, forecasts, scope changes, and recovery. Use when a team has no project manager, a TPM needs decision-ready analysis, a project is slipping, or commitments and handoffs need coordination. Use `technical-program-management` instead when multiple related projects, teams, vendors, shared capacity, or benefits must be coordinated toward one outcome. Adapt depth to the user's expertise. Do not use for a standalone coding task, product discovery or strategy, only writing an implementation plan, only diagnosing Kanban flow, operating a ticket tool, incident command, or a release go/no-go decision; route those to specialists.
compatibility
Host-neutral methodology and Markdown templates. Optional read-only schedule analysis requires Python 3.10+ standard library; no credentials or network.
license
MIT

Technical Project Management

Help a team make and maintain credible delivery commitments. Start at the user's current decision; do not restart a healthy project or impose a new methodology.

First move

Read existing project artifacts before asking questions. Identify the outcome, current phase, immediate decision, decision-maker, constraints, and evidence gaps. Infer experience from the request and artifacts; ask about preference only if it matters. For teams without a PM, provide a small usable working system and explain unfamiliar concepts in context. For experienced TPMs, lead with the delta, options, recommendation, and decision needed; omit introductory lessons.

Choose the entry point
Starting conditionFirst actionPrimary output
New or inherited project with unclear mandateRead Engagement and initiationProposed brief with authority and evidence gaps
Approved work with a delivery method but weak controlRead Control and communicationCurrent control record and decision brief
Slipping date, cost, scope, or dependencyRead Forecasting and schedule analysis and Change and recoveryConditional forecast and recovery options
Cross-team, supplier, or mixed-method handoffRead Hybrid and dependenciesDependency agreement and acceptance evidence
Delivered work, retirement, or decommissioning with unresolved ownership or benefitsRead Closure and transitionConditional closure, accepted transition, or decommissioning record
Technical uncertainty needs staged learningRead Adaptive deliveryEvidence-backed decision among PoC, prototype, pilot, or stop; none alone proves production readiness
Forecast, deadline, or resource-feasibility questionRead Forecasting and schedule analysisConditional forecast stating model, assumptions, capacity, and feasibility limits
Material risk, issue, assumption, or decision needs controlRead Control and communicationRecord with owner, signal/trigger, response, authority, and next review
A supplier or team handoff lacks readiness or acceptance evidenceRead Hybrid and dependenciesAgreement with provider, receiver, definition of ready, evidence, fallback, and escalation

Do not call a desired date a commitment, a forecast an acceptance, or a diagnostic brief an approved plan.

Before proposing a commitment, identify who can authorize scope, dates, capacity, acceptance, and external communication. Mark each as accepted, proposed, unknown, or disputed. Read-only diagnosis may proceed; external updates require authorization.

Operating loop

  1. Establish mandate and authority; separate approved commitments, forecasts, assumptions, and unknowns. A diagnostic or options brief can precede approval; do not turn it into an approved implementation plan.
  2. Select the smallest adequate management approach. Preserve effective existing practices and specify any changed decision rights, cadence, and handoffs.
  3. Reuse the implementation plan and maintain milestones, dependency commitments, remaining work, resource availability, risks, issues, and decisions.
  4. Compare evidence with the baseline and tolerances. Investigate contradictions; missing evidence means unknown, not green. Surface forecast changes immediately when material; do not wait for a scheduled report.
  5. Present feasible options when scope, capacity, cost, or dates conflict. Keep the baseline history; an authorized change is not permission to hide prior variance.
  6. Close only on acceptance and explicit residual ownership. Distinguish project closure, release readiness, service operation, and later benefit realization.

Reference routing

Read only what the current task requires. Each reference includes applicability, procedures, failure signals, and an observable exit.

A multi-project initiative with a shared outcome, cross-project dependencies, or program-level benefits belongs to technical-program-management; a single bounded project remains here.

Decision phase / situationReadExit artifact or evidence
New or inherited project, no PM, expert collaborationEngagement and initiationProposed brief with mandate, authority, and evidence gaps
Choosing or questioning a methodologyMethod selectionApproach decision with adaptations and revisit trigger
Predictive planning, stages, tolerances, fixed constraintsPredictive and stage governanceBaseline, tolerances, and gate evidence
Scrum, iteration, incremental delivery, discovery uncertaintyAdaptive deliveryLearning/increment evidence and inspect/adapt decision
Flow, shared specialists, critical chain, appetite-based workFlow and constrained capacityCapacity/WIP or appetite decision with owner
Mixed methods, cross-team or vendor interfacesHybrid and dependenciesDependency agreement and interface acceptance evidence
Estimates, forecasts, budgets, schedule modelForecasting and schedule analysisConditional forecast with assumptions and feasibility limits
Weekly control, stakeholder disagreement, escalationsControl and communicationStatus/update or decision brief with next checkpoint
Scope changes, troubled projects, recoveryChange and recoveryChange/recovery record preserving the baseline
Acceptance, cancellation, operational handoffClosure and transitionClosure or transition record with residual owners
Real examples or transferability checksCase studiesSource-limited analogy, not a guarantee
Research provenance, edition, evidence limitsSource indexTraceable evidence ledger
Skill purpose, coverage, research decisionsResearch briefCoverage and limitation record
Validation scope and behavioral evaluation protocolEvaluation guideReproducible evaluation record
Show full SKILL.md (387 more words)Show less

Templates and calculation

Adapt existing project documents rather than creating parallel sources of truth. Use only artifacts that answer a current decision.

NeedArtifact
Establish mandate and working agreementsProject brief
Explain method choice and adaptationApproach decision
Maintain milestones and evidenceProject control record
Coordinate a supplier or receiving teamDependency agreement
Report a change and ask for a decisionStatus and decision brief
Assess scope changes or recovery optionsChange and recovery record
Accept, cancel, or transfer ownershipClosure record
Calculate a small dependency networkExample schedule

Run python3 scripts/schedule.py --input templates/schedule-example.json --json from this skill's directory when dependency arithmetic helps. Read forecasting first: the result is an unconstrained earliest schedule, not a commitment or a resource-leveled plan. The script only reads input and writes stdout/stderr. Run python3 -m unittest discover -s scripts -p 'test_*.py' for its tests.

When not to use

Authority and completion

This methodology prepares decisions. It does not invent stakeholder consent, assign accepted commitments on someone else's behalf, or approve risk. Updating external project systems or sending communications changes external state:

Confirm the target, scope, and rollback path before acting. Read-only discovery may proceed without confirmation.

Apply existing session authorization; do not ask repeatedly for the same scope. Destructive actions need an explicit directive. Keep prepared drafts visibly distinct from issued communications. Do not monitor people or turn activity counts into individual performance judgments.

Complete a requested management cycle when the artifact or update is delivered, claims have evidence or explicit uncertainty, and unresolved decisions have an accountable route and next review trigger. Do not imply ongoing monitoring without an authorized mechanism. If three diagnostic passes yield no new evidence, stop with the missing input and affected decision; do not manufacture certainty.

© magnus919, MIT. Rendered from Markdown: HTML in the file is shown as text, images as links, and headings moved down two levels. Raw file

Files

SKILL.md and 37 other files (scripts, references) in technical-project-management of magnus919/agent-skills.

  • SKILL.md
  • README.md
  • evals/evals.json
  • evals/sample-review.md
  • evals/samples/baseline-expert.md
  • evals/samples/baseline-schedule.md
  • evals/samples/baseline-team.md
  • evals/samples/final-team-provenance.json
  • evals/samples/final-team.md
  • evals/samples/with-skill-expert.md
  • evals/samples/with-skill-schedule.md
  • evals/samples/with-skill-team.md
  • references/adaptive-delivery.md
  • references/case-studies.md
  • references/change-and-recovery.md
  • references/closure-and-transition.md
  • references/control-and-communication.md
  • references/engagement-and-initiation.md
  • … and 20 more

Open the folder on GitHubat commit 22b4723

Compare with similar skills

Technical Project Management next to the 5 skills that share the most tags, products or categories with it. Stars are the repository's; “used in” counts other GitHub owners with a copy.

Technical Project Management compared with similar skills
SkillStarsUsed inTokensAuto-checkLicenceRepo updated
Technical Project Management this skillmagnus919/agent-skills115—~2.9kAutomated safety check: PassMIT
CCPM Project Managementautomazeio/ccpm8.4k—~1.1kAutomated safety check: PassMIT
Uvastral-sh/claude-code-plugins3132 repos~980Automated safety check: PassApache-2.0
Project Managementkunchenguid/firstmate7.8k—~2.1kAutomated safety check: PassMIT
Hivemind Goalsactiveloopai/hivemind1.6k—~1.7kAutomated safety check: NotesApache-2.0
Ichartjswanghetommy/ichartjs352—~4.3kAutomated safety check: PassApache-2.0

Similar skills

  • Runs a spec-driven workflow from PRD to epic to GitHub issues to parallel agents, with status, standup and blocked-work reports from bundled scripts.

    8.4k GitHub stars~1.1k tokensUpdated 6 mo ago
    Product & Project ManagementAuto-check passed
  • Uv

    astral-sh/claude-code-plugins

    Official

    Guide for using uv, the Python package and project manager. An agent skill from astral-sh/claude-code-plugins.

    313 GitHub starsUsed in 2 repos~980 tokens
    Product & Project ManagementAuto-check passed
  • Project Management

    kunchenguid/firstmate

    Agent-only procedure for Firstmate project management. An agent skill from kunchenguid/firstmate.

    7.8k GitHub stars~2.1k tokensUpdated yesterday
    Product & Project ManagementAuto-check passed
  • Hivemind Goals

    activeloopai/hivemind

    Create, track and update team goals via the Deeplake virtual filesystem at memory/goal/.

    1.6k GitHub stars~1.7k tokensUpdated 12 days ago
    Product & Project ManagementAuto-check: notes
  • Ichartjs

    wanghetommy/ichartjs

    Plan, validate, render, explain, and safely edit iChart.js visualizations from tabular, project, or diagram data.

    352 GitHub stars~4.3k tokensUpdated yesterday
    Product & Project ManagementAuto-check passed
  • Hivemind Goals

    activeloopai/hivemind

    Create, track and update team goals in Hivemind via the hivemind CLI.

    1.6k GitHub stars~814 tokensUpdated 12 days ago
    Product & Project ManagementAuto-check passed

More from magnus919/agent-skills

All 131 skills in this repo
  • Artifact Pyramids

    magnus919/agent-skills

    Organize durable agent research outputs as summaries, analysis, and evidence dossiers.

    115 GitHub stars~2.7k tokensUpdated today
    Auto-check passed
  • Ascii City Engine

    magnus919/agent-skills

    Build portable, first-person colored ASCII city engines and small GIS-derived city packs.

    115 GitHub stars~1.1k tokensUpdated today
    Auto-check passed
  • Color Management

    magnus919/agent-skills

    Manage color workflows with ICC profiles, working spaces, gamut mapping, and color science.

    115 GitHub stars~2.6k tokensUpdated today
    Auto-check: notes
  • Data Scientist

    magnus919/agent-skills

    A skill your agent uses for PhD-level expertise in data science, statistics, and machine learning: rigorous statistical analysis, experimental design, causal inference, advanced modeling, research…

    115 GitHub stars~4.1k tokensUpdated today
    Auto-check passed
  • Docker Compose

    magnus919/agent-skills

    Use Docker Compose to define, run, debug, and harden multi-container applications.

    115 GitHub stars~2k tokensUpdated today
    Auto-check: notes
  • Fpga Development

    magnus919/agent-skills

    Design, review, simulate, and verify FPGA logic using explicit RTL contracts, clock and reset models, CDC analysis, timing constraints, and reproducible implementation evidence.

    115 GitHub stars~2.7k tokensUpdated today
    Auto-check passed

Questions about Technical Project Management

What does Technical Project Management do?

Manage technical projects from initiation through delivery and closure: choose and tailor predictive, iterative, Scrum, flow-based, or hybrid approaches; coordinate teams and vendors; track…. Technical Project Management is an agent skill from magnus919/agent-skills. Manage technical projects from initiation through delivery and closure: choose and tailor predictive, iterative, Scrum, flow-based, or hybrid approaches; coordinate teams and vendors; track milestones, risks, issues, dependencies, forecasts, scope changes, and recovery.

When should I use Technical Project Management?

Technical Project Management fits situations like: A team has no project manager; A TPM needs decision-ready analysis; A project is slipping; commitments and handoffs need coordination.

How do I install Technical Project Management in Claude Code?

Run `npx skills add magnus919/agent-skills --skill technical-project-management -a claude-code`. Or copy the skill folder (technical-project-management in magnus919/agent-skills) into .claude/skills/technical-project-management in your project. Claude Code loads it when a task matches its description.

How do I install Technical Project Management in Codex?

Run `npx skills add magnus919/agent-skills --skill technical-project-management -a codex`. Or copy the skill folder (technical-project-management in magnus919/agent-skills) into .agents/skills/technical-project-management in your project. Codex loads it when a task matches its description.

Can I use Technical Project Management in Cursor, Gemini CLI or GitHub Copilot?

Cursor, Gemini CLI, GitHub Copilot and OpenCode also load SKILL.md folders. With the skills CLI, run `npx skills add magnus919/agent-skills --skill technical-project-management -a cursor` (or -a gemini-cli, github-copilot or opencode for the others). To copy it by hand, put the folder in .cursor/skills/technical-project-management, .gemini/skills/technical-project-management, .github/skills/technical-project-management and .opencode/skills/technical-project-management in your project.

What does Technical Project Management need to run?

Going by SKILL.md and its folder, Technical Project Management needs the command-line tools its instructions call (python3). Our summary lists: Python 3. Compatibility (from SKILL.md): Host-neutral methodology and Markdown templates. Optional read-only schedule analysis requires Python 3.10+ standard library; no credentials or network..

Does Technical Project Management access the network?

SKILL.md contains no URLs. Any network use would come from the scripts or tools the agent runs. This is read from the text; nothing was executed.

Is Technical Project Management safe to install?

Our automated static check of SKILL.md found no risky patterns, such as piping downloads into a shell, reading credential files or hidden Unicode. It is not a guarantee. The check reads SKILL.md only: the scripts in the folder are not scanned, so read them before running anything.

What licence does Technical Project Management use?

Technical Project Management is published under the MIT licence (declared in SKILL.md). It allows redistribution, so the full SKILL.md is shown on this page.

How many tokens does Technical Project Management use?

About 2.9k tokens (SKILL.md is roughly 12k characters). Agents keep only the skill's name and description in context until a task matches; then they load SKILL.md in full. Its references folder adds about 13k tokens, read only when the agent opens those files.

What are the alternatives to Technical Project Management?

Skills that share tags, products or a category with Technical Project Management: CCPM Project Management (automazeio/ccpm, 8.4k stars), Uv (astral-sh/claude-code-plugins, 313 stars), Project Management (kunchenguid/firstmate, 7.8k stars) and Hivemind Goals (activeloopai/hivemind, 1.6k stars). The comparison table on this page puts their stars, adoption, token cost, safety result and licence side by side.

Who maintains Technical Project Management?

magnus919 (a GitHub user) maintains it in magnus919/agent-skills, which has 115 GitHub stars. The repository holds 131 skills in this directory. The repository was last updated on October 10, 2026.

Source: magnus919/agent-skills on GitHub. Facts on this page come from the repository at the commit we read; the author's words are quoted as theirs.