name: cabloy-spec-execution
description: Use this skill whenever the user asks to implement, execute, deliver, verify, or close a task from an existing Cabloy suite specification, including requests such as “implement WBS-…”, “execute the approved phase”, “deliver the next spec task”, or “make the repo-specs plan real”. It coordinates one bounded WBS increment through the existing backend, frontend, and contract-loop skills, then records evidence-backed derived status. Require an explicit WBS task ID or a finite, explicitly approved phase; do not use it to invent requirements, resolve suite identity, replace cabloy-spec-generation, duplicate scaffold procedures, or perform unapproved destructive, deployment, or provider operations.
---

# Cabloy Spec Execution

Use this skill as the control plane for delivering an already-approved suite specification. It turns one bounded WBS item into an implementation, verification, evidence, and progress handoff without becoming a second product authority.

## Goals

1. detect the active Cabloy edition and repository state before making implementation or command assumptions;
2. select only an explicit, bounded, dependency-ready WBS increment;
3. preserve PRD, SRS, ADR, WBS, and test-plan authority while routing technical work to the existing specialist skills;
4. require scoped verification and durable redacted evidence before claiming `verified`;
5. leave a resumable status and next-proof handoff without silently advancing neighboring work.

Read these references before executing or substantially updating an increment:

- `references/execution-protocol.md` for discovery, dossier, gates, routing, and safe-operation boundaries;
- `references/status-and-evidence.md` for evidence retention, status transitions, supersession, and progress updates.

## Step 1: Detect repository and edition

From the active repository root, inspect:

1. `git rev-parse --show-toplevel`, `git status --short`, current `HEAD`, and the working-tree classification;
2. `__CABLOY_BASIC__` or `__CABLOY_START__`;
3. root `package.json` and `repo-agent-governance/` (or the active generated adapter);
4. the target `repo-specs/<suite>/` directory and relevant source/module topology.

Interpret the markers as follows:

- exactly `__CABLOY_BASIC__`: use observed Basic source, scripts, flavors, UI, and SSR facts;
- exactly `__CABLOY_START__`: resolve those facts from the active Start repository;
- both markers: stop; the checkout is invalid or ambiguous;
- neither: inspect the owning package/structure and ask before edition-specific execution.

A PostToolUse hook or an automatic build is convenience assistance, not evidence that the task is synchronized or verified. The deterministic chart commands are `npm run spec:charts -- <suite>` and `npm run spec:charts:check -- <suite>`; they validate derived-view freshness, not implementation or ATP completion.

## Step 2: Require and classify the execution target

Require one of:

- an explicit WBS task identifier such as `WBS-ABC-20-01`;
- a finite phase whose included WBS tasks and closure boundary are explicitly named and approved.

Do not interpret “implement the suite”, “finish everything”, or “execute the next phase” as a sufficiently bounded target. Ask for the exact task or enumerate a finite candidate set and obtain approval before implementation.

Classify the target:

- **backend increment**: Vona module, bean, service, model, entity, DTO, validation, migration, or backend test;
- **frontend increment**: Zova page, component, route, model, metadata, SSR, or frontend test;
- **contract increment**: OpenAPI, DTO consumer, generated SDK/schema, reverse metadata handoff, or consumer-drift diagnosis;
- **verification/closure increment**: an ATP, evidence, phase closure, or release gate explicitly defined by the test plan;
- **authority change**: a requirement, contract, dependency, scope, or durable decision change. Stop and route this to `cabloy-spec-generation` or `cabloy-domain-planning` before execution.

If a task maps to a more specialized Cabloy skill such as `cabloy-master-detail`, `cabloy-resource-field-update`, or `cabloy-module-removal`, use that specialist rather than flattening its procedure into this skill.

## Step 3: Read the spec authority set

Read the suite records in this order:

1. `README.md` for identity, reading order, topology, and authority map;
2. `prd.md`, `srs.md`, and applicable accepted/proposed ADRs for product and technical authority;
3. `pdp-wbs.md` for the complete selected task, dependencies, source areas, exclusions, completion checks, and linked IDs;
4. `test-plan.md` for linked `ATP-*` procedures, fixture/cleanup rules, evidence requirements, and release gates;
5. `progress.md` for current derived state, blockers, waivers, prior evidence, superseded proof, and next action;
6. linked evidence, phase indexes, presentation contracts, rollout records, or provider runbooks when referenced;
7. applicable implementation charts as derived views: check freshness only with complete supported README/WBS/ATP/progress inputs; otherwise report the legacy/lightweight input gap without inventing business definitions.

Keep planning authority audit (`npm run spec:check -- <suite>`, with `--lightweight` only for agreed limited scope), chart model/freshness, and human approval/evidence as three independent gates. Static passes do not clear controlling TODOs, accept ADRs, or prove ATP execution.

Do not trust the first status statement found in a historical record. Reconcile revision, chronology, supersession, and the authoritative current progress row before deciding readiness.

## Step 4: Build and confirm an execution dossier

Before implementation, present a concise dossier containing:

- detected edition, repository root, suite, target WBS ID/finite phase, current revision, and clean/dirty working-tree classification;
- linked `PRD-*`, `SRS-*`, `ATP-*`, ADR, and evidence records;
- dependencies and their actual status/proof;
- source-of-truth paths, proposed paths, ownership boundaries, and specialist skill route;
- applicable tenant, identity, authorization, ownership, lifecycle, transaction, concurrency, idempotency, audit, privacy, SSR, migration, and contract-loop constraints;
- exact scoped verification procedures and expected evidence;
- records permitted to change (`progress.md`, evidence/phase index, derived implementation charts, and only other records whose established convention requires it);
- remaining blockers, `TODO(confirm)` decisions, unsafe actions intentionally excluded, and one next action.

Classify targets as observed existing, proposed new, or explicitly approved new. An explicitly approved new site/flavor tuple may be created before target source exists when framework constraints and collisions were checked, the concrete design was explicitly approved, and its governing ADR is `Accepted`. Cite the design, planned paths/manifests, and creation prerequisites. A new wrapper remains a planned addition until created and observed; do not run it prematurely. Shared integration still needs an observed owner. Proposed/unchecked values and controlling TODOs remain gated.

Require explicit dossier approval before source changes, meaningful verification, or evidence/status updates. Generation approval, design/ADR acceptance, and this execution approval are separate; silence is not approval.

## Step 5: Apply readiness gates

Stop and route back to the relevant planning authority if any of the following applies:

- the suite identity, ownership, or target boundary is unresolved;
- PRD/SRS/ADR/WBS/test-plan records contradict one another;
- a controlling `TODO(confirm)` or unaccepted ADR remains;
- a predecessor is neither `verified` nor formally opted-in `planning-complete` with a named-reviewer, revision-scoped documentary closure disposition, or its required evidence is absent; a planning-complete edge does not authorize execution;
- the selected task is already `verified` or `planning-complete`, explicitly `deferred`, or currently `blocked`;
- a persisted field/schema change lacks an explicit decision about incrementing `vonaModule.fileVersion`;
- the working tree contains overlapping unclassified changes that make attribution or rollback unclear;
- authorization, tenant isolation, privacy, lifecycle, transaction, concurrency, idempotency, or ownership behavior is unspecified for a material risk;
- the requested work would expand scope or silently create a competing persistence, identity, or API authority.

A task may be marked `in-progress` only when approved execution actually starts. Do not edit progress merely to reserve a task.

## Step 6: Route the approved increment

After confirmation, route the smallest coherent implementation unit:

- Vona implementation -> `cabloy-backend-scaffold`;
- Zova implementation -> `cabloy-frontend-scaffold`;
- Vona/Zova contract synchronization, generated consumers, reverse metadata handoff, or stale consumer diagnosis -> `cabloy-contract-loop`;
- master-detail, resource-field, or module-removal shape -> the corresponding specialized skill;
- test-only/closure work -> follow the selected ATP and repository test ownership, without inventing a new test authority.

Keep the specialist’s CLI-first and follow-up rules. Never hand-edit generated consumers. Do not automatically implement adjacent WBS items, choose unconfirmed routes/flavors, change requirements, commit/push, or invoke the next phase.

## Step 7: Verify narrowly, then expand as required

Start with the narrowest meaningful check, then follow linked ATP/release gates. Run only commands observed in the active repository and approved by the dossier. An approved task may first add a planned wrapper to its durable manifest; inspect the resulting command and paired outputs before running it. Do not substitute an existing Basic wrapper for a new/Start tuple.

For contract-sensitive work:

- forward chain: establish backend contract truth, inspect OpenAPI, regenerate Zova consumers, then perform thin frontend follow-up;
- reverse chain: build the affected Zova flavor with both SSR and REST outputs, then run `npm run deps:vona`; build Web and Admin pairs when both are affected;
- if generated artifacts are correct but installed Vona consumers remain stale, diagnose local dependency drift through `cabloy-contract-loop` rather than hand-patching generated files or reinstalling automatically.

For SSR-sensitive work, verify server output and hydration-time initial render equivalence, privacy/admission behavior, and the exact active flavor/site contract. For backend tests, preserve separate `mockCtx(...)` boundaries for competing operations, explicit contention assertions, precise `finally` cleanup, and read-only managed seed behavior.

A planned command, successful generation, code reading, manual walkthrough, screenshot, or unrelated broad test pass is not sufficient for `verified` unless the test plan explicitly defines it as adequate retained proof.

## Step 8: Record evidence and derived status

Record proof under `references/status-and-evidence.md`, preserving the established evidence convention. Update evidence, then progress, then applicable charts. With complete supported inputs, run `npm run spec:charts -- <suite>` and `npm run spec:charts:check -- <suite>`; README title/language changes also require regeneration. Otherwise report chart-input omissions and route needed authority repair to generation; do not invent definitions or force a full baseline. Charts cannot repair an authority conflict.

Set status accurately:

- `in-progress` while work or verification remains open;
- `planning-complete` only for an opted-in documentary/design task after explicit named-reviewer, revision-scoped planning-closure disposition and linked planning evidence; never infer source/ATP closure or next-task approval;
- `implementation-complete` when source work is complete but ATP/release proof remains;
- `verified` only after all applicable WBS checks and ATPs have durable linked redacted evidence;
- `blocked`, `waived`, or `deferred` only with the required details.

Do not create empty evidence records, fabricate `EVD-*` IDs, erase historical failures, or claim that a hook/build means verification passed. If changed source or authority invalidates old proof, mark it superseded or requiring rerun.

## Step 9: Finish with a resumable handoff

Report:

1. target WBS/phase and detected edition;
2. implementation files and commands actually changed/run;
3. observed result and evidence locations, with secrets and sensitive data redacted;
4. resulting status and the precise reason for it;
5. blockers, decisions, or evidence still outstanding;
6. one next proof/action only;
7. separate authority-audit, chart-model/freshness, and human approval/evidence results; applicable refreshed charts and README language, or the precise incomplete-input omission.

Do not automatically modify the next WBS item or claim release closure from feature-level verification.

## Prohibited autonomous operations

Unless a separate explicit workflow and confirmation authorizes them, do not:

- run `npm run init`;
- reset or recreate a database;
- deploy, publish, cut over, or perform production/provider/webhook operations;
- change credentials or retain secrets/raw tokens/signed callback state/live provider identifiers;
- clean, reset, stash, checkout, or discard the working tree;
- reinstall dependencies as a first response to drift;
- scaffold broad source outside the approved WBS boundary;
- commit or push;
- mark implementation or verification complete without observed, traceable proof.