Compile
apache/skywalking-nodejs
Compile / build / type-check the skywalking-nodejs agent. An agent skill from apache/skywalking-nodejs.
Official agent skill
Mandatory human-intervention gate for critical Azure Functions Node.js worker code.
$ npx skills add Azure/azure-functions-nodejs-worker --skill azure-functions-node-worker-critical-path -a claude-codeProject install by default; add -g for ~/.claude/skills/.
$ gh skill install Azure/azure-functions-nodejs-worker azure-functions-node-worker-critical-path --agent claude-codeProject scope by default; add --scope user for a personal install. Needs GitHub CLI 2.90.0 or later (public preview).
$ git clone --depth 1 https://github.com/Azure/azure-functions-nodejs-worker.git skills-src && mkdir -p .claude/skills && cp -r skills-src/.github/skills/azure-functions-node-worker-critical-path .claude/skills/azure-functions-node-worker-critical-path && rm -rf skills-srcUse ~/.claude/skills/ instead of .claude/skills for a personal install. The folder must contain SKILL.md.
Claude Code skills documentation · loads skills from .claude/skills/
Install the "azure-functions-node-worker-critical-path" agent skill from https://github.com/Azure/azure-functions-nodejs-worker/tree/v3.x/.github/skills/azure-functions-node-worker-critical-path into .claude/skills/azure-functions-node-worker-critical-path/ in this project. Copy the whole folder (SKILL.md and every file beside it), keep the folder name "azure-functions-node-worker-critical-path", then confirm the skill loads.Claude Code copies the folder itself, the same result as the manual copy. Check what it changed before you commit it.
$skill-installer install https://github.com/Azure/azure-functions-nodejs-worker/tree/v3.x/.github/skills/azure-functions-node-worker-critical-pathType this inside Codex. $skill-installer <name> installs a curated skill from openai/skills. The installer writes to $CODEX_HOME/skills (default ~/.codex/skills). Restart Codex if the skill does not show up.
$ npx skills add Azure/azure-functions-nodejs-worker --skill azure-functions-node-worker-critical-path -a codexProject install goes to .agents/skills/; add -g for ~/.codex/skills/.
$ gh skill install Azure/azure-functions-nodejs-worker azure-functions-node-worker-critical-path --agent codexProject scope by default (.agents/skills/); add --scope user for a personal install.
$ git clone --depth 1 https://github.com/Azure/azure-functions-nodejs-worker.git skills-src && mkdir -p .agents/skills && cp -r skills-src/.github/skills/azure-functions-node-worker-critical-path .agents/skills/azure-functions-node-worker-critical-path && rm -rf skills-srcUse ~/.agents/skills/ instead of .agents/skills for a personal install.
Codex skills documentation · loads skills from .agents/skills/
Install the "azure-functions-node-worker-critical-path" agent skill from https://github.com/Azure/azure-functions-nodejs-worker/tree/v3.x/.github/skills/azure-functions-node-worker-critical-path into .agents/skills/azure-functions-node-worker-critical-path/ in this project. Copy the whole folder (SKILL.md and every file beside it), keep the folder name "azure-functions-node-worker-critical-path", then confirm the skill loads.Codex copies the folder itself, the same result as the manual copy. Check what it changed before you commit it.
$ npx skills add Azure/azure-functions-nodejs-worker --skill azure-functions-node-worker-critical-path -a cursorProject install goes to .agents/skills/; add -g for ~/.cursor/skills/.
$ gh skill install Azure/azure-functions-nodejs-worker azure-functions-node-worker-critical-path --agent cursorProject scope by default (.agents/skills/); add --scope user for a personal install.
$ git clone --depth 1 https://github.com/Azure/azure-functions-nodejs-worker.git skills-src && mkdir -p .cursor/skills && cp -r skills-src/.github/skills/azure-functions-node-worker-critical-path .cursor/skills/azure-functions-node-worker-critical-path && rm -rf skills-srcUse ~/.cursor/skills/ instead of .cursor/skills for a personal install.
Cursor skills documentation · loads skills from .cursor/skills/, .agents/skills/, .claude/skills/, .codex/skills/
Install the "azure-functions-node-worker-critical-path" agent skill from https://github.com/Azure/azure-functions-nodejs-worker/tree/v3.x/.github/skills/azure-functions-node-worker-critical-path into .cursor/skills/azure-functions-node-worker-critical-path/ in this project. Copy the whole folder (SKILL.md and every file beside it), keep the folder name "azure-functions-node-worker-critical-path", then confirm the skill loads.Cursor copies the folder itself, the same result as the manual copy. Check what it changed before you commit it.
$ gemini skills install https://github.com/Azure/azure-functions-nodejs-worker.git --path .github/skills/azure-functions-node-worker-critical-path--scope user (default) or --scope workspace; --path is the subfolder of the repo that holds the skill; --consent skips the security confirmation prompt.
$ npx skills add Azure/azure-functions-nodejs-worker --skill azure-functions-node-worker-critical-path -a gemini-cliProject install goes to .agents/skills/; add -g for ~/.gemini/skills/.
$ gh skill install Azure/azure-functions-nodejs-worker azure-functions-node-worker-critical-path --agent gemini-cliProject scope by default (.agents/skills/); add --scope user for a personal install.
$ git clone --depth 1 https://github.com/Azure/azure-functions-nodejs-worker.git skills-src && mkdir -p .gemini/skills && cp -r skills-src/.github/skills/azure-functions-node-worker-critical-path .gemini/skills/azure-functions-node-worker-critical-path && rm -rf skills-srcUse ~/.gemini/skills/ instead of .gemini/skills for a personal install, then run /skills reload.
Gemini CLI skills documentation · loads skills from .gemini/skills/, .agents/skills/
Install the "azure-functions-node-worker-critical-path" agent skill from https://github.com/Azure/azure-functions-nodejs-worker/tree/v3.x/.github/skills/azure-functions-node-worker-critical-path into .gemini/skills/azure-functions-node-worker-critical-path/ in this project. Copy the whole folder (SKILL.md and every file beside it), keep the folder name "azure-functions-node-worker-critical-path", then confirm the skill loads.Gemini CLI copies the folder itself, the same result as the manual copy. Check what it changed before you commit it.
$ gh skill install Azure/azure-functions-nodejs-worker azure-functions-node-worker-critical-pathInstalls for Copilot at project scope by default; add --scope user for a personal install. Preview a skill first with gh skill preview. Needs GitHub CLI 2.90.0 or later (public preview).
$ npx skills add Azure/azure-functions-nodejs-worker --skill azure-functions-node-worker-critical-path -a github-copilotProject install goes to .agents/skills/; add -g for ~/.copilot/skills/.
$ git clone --depth 1 https://github.com/Azure/azure-functions-nodejs-worker.git skills-src && mkdir -p .github/skills && cp -r skills-src/.github/skills/azure-functions-node-worker-critical-path .github/skills/azure-functions-node-worker-critical-path && rm -rf skills-srcUse ~/.copilot/skills/ instead of .github/skills for a personal install. Commit .github/skills so cloud agent and code review can use it.
GitHub Copilot skills documentation · loads skills from .github/skills/, .claude/skills/, .agents/skills/
Install the "azure-functions-node-worker-critical-path" agent skill from https://github.com/Azure/azure-functions-nodejs-worker/tree/v3.x/.github/skills/azure-functions-node-worker-critical-path into .github/skills/azure-functions-node-worker-critical-path/ in this project. Copy the whole folder (SKILL.md and every file beside it), keep the folder name "azure-functions-node-worker-critical-path", then confirm the skill loads.GitHub Copilot copies the folder itself, the same result as the manual copy. Check what it changed before you commit it.
$ npx skills add Azure/azure-functions-nodejs-worker --skill azure-functions-node-worker-critical-path -a opencodeOpenCode documents no install command of its own. Project install goes to .agents/skills/; add -g for ~/.config/opencode/skills/.
$ gh skill install Azure/azure-functions-nodejs-worker azure-functions-node-worker-critical-path --agent opencodeProject scope by default (.agents/skills/); add --scope user for a personal install.
$ git clone --depth 1 https://github.com/Azure/azure-functions-nodejs-worker.git skills-src && mkdir -p .opencode/skills && cp -r skills-src/.github/skills/azure-functions-node-worker-critical-path .opencode/skills/azure-functions-node-worker-critical-path && rm -rf skills-srcUse ~/.config/opencode/skills/ instead of .opencode/skills for a personal install.
OpenCode skills documentation · loads skills from .opencode/skills/, .claude/skills/, .agents/skills/
Install the "azure-functions-node-worker-critical-path" agent skill from https://github.com/Azure/azure-functions-nodejs-worker/tree/v3.x/.github/skills/azure-functions-node-worker-critical-path into .opencode/skills/azure-functions-node-worker-critical-path/ in this project. Copy the whole folder (SKILL.md and every file beside it), keep the folder name "azure-functions-node-worker-critical-path", then confirm the skill loads.OpenCode copies the folder itself, the same result as the manual copy. Check what it changed before you commit it.
azure-functions-node-worker-critical-pathMandatory human-intervention gate for critical Azure Functions Node.js worker code.
Azure Functions Node Worker Critical Path is an agent skill from Azure/azure-functions-nodejs-worker, published by the product's own GitHub organization. Mandatory human-intervention gate for critical Azure Functions Node.js worker code. Use automatically or as /azure-functions-node-worker-critical-path for changes to Host-worker RPC/protobuf, gRPC startup, message routing, capabilities, app/module loading, programming-model registration, invocation conversion, specialization/environment/process state, hooks, termination, error sanitization, dependencies, bundling, packaging, pipelines, compatibility behavior, or tests that protect those paths. Classify risk…
Its SKILL.md is about 2k tokens, which your agent loads only when the skill is triggered. The skill folder holds 2 other files, including reference files (for example `references/critical-paths.md`).
It sits in Backend & APIs, covering gRPC and Protobuf. It works with Azure Functions, gRPC, Node.js and Microsoft Azure. The repository describes itself as: The Node.js worker for the Azure Functions runtime - https://functions.azure.com. The licence is MIT.
5 steps, taken from the step headings in SKILL.md.
Read from SKILL.md and the folder at commit 8c3b7f3. It shows what the files ask for, not the result of running them.
Pre-approves nothing: there is no allowed-tools line, so your agent's usual permission prompts apply.
From allowed-tools in the SKILL.md frontmatter.
Shell commands in SKILL.md call:
npmFrom the folder's file list and the shell code blocks in SKILL.md.
No URLs in SKILL.md. Its commands use npm, which can reach the network depending on how they are called.
From URLs in SKILL.md, links to its own repository left out.
Names no API keys, tokens, secrets or passwords.
From names ending in _API_KEY, _TOKEN, _SECRET, _KEY or _PASSWORD in SKILL.md.
Azure Functions Node Worker Critical Path loads about 2k tokens when it runs, and up to ~3.7k if it reads all its reference files. Until then it costs about 167 tokens; SKILL.md has 812 words of instructions outside code blocks.
Estimates: characters ÷ 4, the usual rule of thumb; real counts depend on the model's tokenizer. Scripts and assets cost tokens only if the agent reads them.
The automated check found no risky patterns in SKILL.md.
Automated static check — not a guarantee. Review scripts before installing. It scans the text of SKILL.md for risky patterns (piping downloads into a shell, reading credential files, hidden Unicode, destructive commands); files beside SKILL.md are not scanned.
The full file from Azure/azure-functions-nodejs-worker at commit 8c3b7f3, republished under its MIT licence (© Azure). 812 words, ~1,977 tokens.
.claude/skills/azure-functions-node-worker-critical-path/SKILL.md (or your agent's skills folder). This skill also uses 1 other file; get the full folder from GitHub.This skill is a review gate, not a general code review. Its purpose is to identify changes for which automated reasoning and tests are insufficient and a qualified human must make or approve the decision.
Apply azure-functions-node-worker for domain validation. Apply azure-functions-node-worker-security whenever the change affects a trust boundary, executable code selection, credentials, process isolation, availability controls, or dependencies.
Read critical-paths.md to classify affected files and semantic triggers.
Human approval cannot be supplied by Copilot, inferred from passing tests, or replaced by this skill. For a triggered change:
.github/CODEOWNERS; this repository currently assigns @azure/azure-functions-nodejsAutomated tools may prepare a local draft, tests, threat analysis, and review packet unless the change requires design approval before implementation.
Inspect the requested behavior and relevant diff. Classify by semantics as well as path:
Gate A - human decision before implementation: changes the wire contract, compatibility policy, trusted peer/endpoint, executable-code boundary, process isolation, environment/working-directory policy, termination guarantee, or shipped dependency/release behaviorGate B - human review before acceptance: modifies an implementation on a critical path without intentionally changing the established contractNot gated: does not affect a critical behavior and does not weaken tests or validation protecting oneIf uncertain between two levels, use the stricter gate and state exactly what fact would lower it.
For Gate A, pause implementation until a human confirms the intended contract and tradeoff. Ask only the concrete decision needed, such as:
For Gate B, a local uncommitted draft may proceed when requested, but mark it HUMAN REVIEW REQUIRED from the start and preserve that status through the final report.
Analysis-only requests do not require approval to investigate; they still require a human to accept any resulting critical-path recommendation.
Describe the affected end-to-end flow:
Host -> gRPC/protobuf -> event handler -> WorkerContext/AppContext -> programming model or module loader -> invocation/side effect -> response/log -> Host
Account for:
Require a focused regression test that would fail without the change and observes the critical boundary. Then require the checks selected by the domain and security skills.
Passing unit tests do not prove wire compatibility, security, race freedom, or production packaging. Require additional evidence where applicable:
.proto diff matched to Host schema and compatibility plannpm run host-sanity or cross-repository e2e evidencenpm run webpack and shipped-artifact inspectionIf a required environment is unavailable, mark the evidence missing. Do not silently downgrade the gate.
Use this exact structure:
HUMAN REVIEW REQUIRED
Gate: A - before implementation | B - before acceptance
Owner: @azure/azure-functions-nodejs (or more specific confirmed owner)
Decision needed: <one concrete decision>
Critical paths:
- <file/symbol and why it is critical>
Behavioral contract:
- Before: <current Host/worker/Node behavior>
- After: <proposed behavior>
- Must remain invariant: <compatibility and security properties>
Blast radius:
- <Host versions, Node versions, indexing modes, process/app state, artifacts>
Security analysis:
- <finding, no finding, or pending analysis with assumptions>
Validation evidence:
- PASS/FAIL/NOT RUN: <exact check and what it proves>
Residual risks or open decisions:
- <specific unresolved item>
Human decision: PENDINGKeep Human decision: PENDING until a human explicitly records approval. If approval is provided, record who approved, what decision they approved, and any conditions; do not generalize that approval to later changes.
Always trigger at least Gate B for changes that affect:
WorkerContext, AppContext, specialization, process.env, working directory, module/global state, or in-flight invocation behaviorTrigger Gate A when the intended contract or trust assumption changes, not merely because an implementation file is touched. See critical-paths.md for examples.
This skill makes Copilot detect and honor the human-review requirement, but a repository skill cannot technically prevent a GitHub merge. Enforce the policy in GitHub with CODEOWNERS-backed branch protection or rulesets requiring approving reviews from code owners, required status checks, stale-approval dismissal, and conversation resolution.
© Azure, MIT. Rendered from Markdown: HTML in the file is shown as text, images as links, and headings moved down two levels. Raw file
SKILL.md and 1 other file (references) in .github/skills/azure-functions-node-worker-critical-path of Azure/azure-functions-nodejs-worker.
Open the folder on GitHubat commit 8c3b7f3
Azure Functions Node Worker Critical Path next to the 5 skills that share the most tags, products or categories with it. Stars are the repository's; “used in” counts other GitHub owners with a copy.
| Skill | Stars | Used in | Tokens | Auto-check | Licence | Repo updated |
|---|---|---|---|---|---|---|
| Azure Functions Node Worker Critical Path this skillAzure/azure-functions-nodejs-worker | 110 | — | ~2k | Automated safety check: Pass | MIT | |
| Compileapache/skywalking-nodejs | 180 | — | ~1.3k | Automated safety check: Pass | Apache-2.0 | |
| Fishjam JS Server SDKsoftware-mansion-labs/skills | 291 | — | ~1.4k | Automated safety check: Pass | MIT | |
| Azure Functionsdavila7/claude-code-templates | 32k | 2 repos | ~344 | Automated safety check: Pass | MIT | |
| Adding Personhog RpcPostHog/posthog | 40k | — | ~2.1k | Automated safety check: Pass | Custom licence | |
| Cortexdb Memory Openclawliliang-cn/cortexdb | 274 | — | ~1.6k | Automated safety check: Pass | MIT |
apache/skywalking-nodejs
Compile / build / type-check the skywalking-nodejs agent. An agent skill from apache/skywalking-nodejs.
software-mansion-labs/skills
Node.js / TypeScript server SDK for Fishjam — backends that create rooms, mint peer tokens, listen to server notifications, and run agents.
davila7/claude-code-templates
Expert patterns for Azure Functions development including isolated worker model, Durable Functions orchestration, cold start optimization, and production patterns.
PostHog/posthog
Guide for adding a new RPC to personhog-replica and personhog-router.
liliang-cn/cortexdb
Give a Node.js agent (such as OpenClaw) durable, local-first memory plus a queryable SPARQL knowledge graph, backed by CortexDB through its gRPC sidecar and the cortexdb-client npm package.
mountain-loop/yaak
A skill your agent uses when the user mentions Yaak, a Yaak workspace, or the yaak command, or asks to call, hit, or smoke test HTTP/REST endpoints, save or organize API requests for reuse or manual…
Azure/azure-functions-nodejs-worker
Repository-specific Azure Functions Node.js Host-worker architecture and change-validation workflow.
Azure/azure-functions-nodejs-worker
Security analysis for the Azure Functions Node.js worker. An agent skill from Azure/azure-functions-nodejs-worker.
Categories
Mandatory human-intervention gate for critical Azure Functions Node.js worker code. Azure Functions Node Worker Critical Path is an agent skill from Azure/azure-functions-nodejs-worker, published by the product's own GitHub organization.js worker code.
Azure Functions Node Worker Critical Path fits situations like: tasks that involve gRPC and Protobuf.
Run `npx skills add Azure/azure-functions-nodejs-worker --skill azure-functions-node-worker-critical-path -a claude-code`. Or copy the skill folder (.github/skills/azure-functions-node-worker-critical-path in Azure/azure-functions-nodejs-worker) into .claude/skills/azure-functions-node-worker-critical-path in your project. Claude Code loads it when a task matches its description.
Run `npx skills add Azure/azure-functions-nodejs-worker --skill azure-functions-node-worker-critical-path -a codex`. Or copy the skill folder (.github/skills/azure-functions-node-worker-critical-path in Azure/azure-functions-nodejs-worker) into .agents/skills/azure-functions-node-worker-critical-path in your project. Codex loads it when a task matches its description.
Cursor, Gemini CLI, GitHub Copilot and OpenCode also load SKILL.md folders. With the skills CLI, run `npx skills add Azure/azure-functions-nodejs-worker --skill azure-functions-node-worker-critical-path -a cursor` (or -a gemini-cli, github-copilot or opencode for the others). To copy it by hand, put the folder in .cursor/skills/azure-functions-node-worker-critical-path, .gemini/skills/azure-functions-node-worker-critical-path, .github/skills/azure-functions-node-worker-critical-path and .opencode/skills/azure-functions-node-worker-critical-path in your project.
Going by SKILL.md and its folder, Azure Functions Node Worker Critical Path needs the command-line tools its instructions call (npm). Our summary lists: Node.js.
SKILL.md contains no URLs. Its commands use npm, which can reach the network depending on how they are called. This is read from the text; nothing was executed.
Our automated static check of SKILL.md found no risky patterns, such as piping downloads into a shell, reading credential files or hidden Unicode. It is not a guarantee. Review the folder before installing.
Azure Functions Node Worker Critical Path is published under the MIT licence (the repository's licence). It allows redistribution, so the full SKILL.md is shown on this page.
About 2k tokens (SKILL.md is roughly 7.9k characters). Agents keep only the skill's name and description in context until a task matches; then they load SKILL.md in full. Its references folder adds about 1.7k tokens, read only when the agent opens those files.
Skills that share tags, products or a category with Azure Functions Node Worker Critical Path: Compile (apache/skywalking-nodejs, 180 stars), Fishjam JS Server SDK (software-mansion-labs/skills, 291 stars), Azure Functions (davila7/claude-code-templates, 32k stars) and Adding Personhog Rpc (PostHog/posthog, 40k stars). The comparison table on this page puts their stars, adoption, token cost, safety result and licence side by side.
Azure (a GitHub organization, an official publisher) maintains it in Azure/azure-functions-nodejs-worker, which has 110 GitHub stars. The repository holds 3 skills in this directory. The repository was last updated on October 8, 2026.
Source: Azure/azure-functions-nodejs-worker on GitHub. Facts on this page come from the repository at the commit we read; the author's words are quoted as theirs.